Detailed Project Report - Commissionerate of Rural Development ...
Detailed Project Report - Commissionerate of Rural Development ...
Detailed Project Report - Commissionerate of Rural Development ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
District Watershed <strong>Development</strong> Unit - Jamnagar<br />
(ii)Irrigation/Percolation<br />
0 0 0 0 0 0 0 0 0 0 0<br />
Tank<br />
(iii) Check dam 0 0 0 0 17 385 195000 58.63 385 195000 58.63<br />
(iv)Causeway cum check<br />
0 0 0 0 1 32 65000 6.05 32 65000 6.05<br />
dam<br />
(i) Farm Pond 0 0 0 0 10 55 4800 0.80 55 4800 0.80<br />
(ii)Irrigation/Percolation<br />
Amrapar<br />
0 0 0 0 0 0 0 0 0 0 0<br />
Tank<br />
(iii) Check dam 0 0 0 0 14 296 125000 54.12 296 125000 54.12<br />
(iv)Causeway cum check<br />
0 0 0 0 6 105 95000 50.05 105 95000 50.05<br />
dam<br />
(i) Farm Pond 0 0 0 0 3 20 2600 0.24 20 2600 0.24<br />
(ii)Irrigation/Percolation<br />
0 0 0 0 0 0 0 0 0 0 0<br />
Tank<br />
Malavada<br />
(iii) Check dam 0 0 0 0 7 240 56000 17.27 240 56000 17.27<br />
(iv)Causeway cum check<br />
0 0 0 0 4 264 54000 13.53 264 54000 13.53<br />
dam<br />
Table no.37: Activities related to ground water resources in the project areas (all financial figures in lakh Rs.)<br />
Proposed target<br />
Augmentation/repair <strong>of</strong> existing Construction <strong>of</strong> new recharging Total Target<br />
Sr.<br />
recharging structures<br />
structures<br />
No. Village name Type <strong>of</strong> structures Area to be<br />
Area to be Estimated<br />
Estimated<br />
Area to be Estimated irrigated(Ha) cost(in lakh)<br />
No. irrigated<br />
No.<br />
cost(in lake) irrigated (ha) cost(in lake)<br />
(ha)<br />
1 Patan<br />
i) Open Wells 1 25 1.0 45 225 2.70 225 2.70<br />
ii) Bore wells 0 0 0 15 75 0.90 75 0.90<br />
<strong>Detailed</strong> <strong>Project</strong> <strong>Report</strong> – IWMP-1 (Patan )