District Watershed <strong>Development</strong> Unit - Jamnagar<br />
This is very important thing because worms multiply at the rate <strong>of</strong> 350 worms per m 3 <strong>of</strong> bed space over a period <strong>of</strong> 6 month to a year.<br />
Fencing<br />
The entire area has to be fenced to prevent the animals and other unwanted elements. These could be estimated based on the length<br />
<strong>of</strong> the periphery <strong>of</strong> the farm.<br />
Water Supply System<br />
We have to maintain always 50-60 % moisture content, there is need to plan for a water source, lifting mechanism and a system <strong>of</strong><br />
conveying and applying the water to the vermi-beds. Initially for 10 days water should be applied regularly by manually to maintain the required<br />
moisture percentage.<br />
Machinery<br />
Farm machinery and implements are required for cutting the raw material in small pieces, conveying shredded raw material to the<br />
vermi-sheds, loading, unloading, collection <strong>of</strong> compost, loosening <strong>of</strong> beds for aeration, shifting <strong>of</strong> the compost. Costs <strong>of</strong> providing necessary<br />
implements and the machinery have to be included in the project cost.<br />
Table no.43: Details <strong>of</strong> activities in the CPRs in the project areas<br />
Target<br />
Name(s) <strong>of</strong> the<br />
CPR particulars Activity proposed Target area under Estimated Expected no. <strong>of</strong><br />
villages<br />
S. No<br />
the activity (ha) expenditure (Rs.) beneficiaries<br />
Patan Waste land Afforestation 12 16.98 96<br />
Community Waste land Fodder 17 12.68 45<br />
Community Pasture land Horticulture 3 1.68 20<br />
Total for Village 48 52.14 161<br />
Paradava Waste land Afforestation 5 7.07 88<br />
Waste land Fodder 5 3.73 85<br />
Waste land Horticulture 2 1.12 42<br />
Total for Village 26 30.79 215<br />