Detailed Project Report - Commissionerate of Rural Development ...
Detailed Project Report - Commissionerate of Rural Development ...
Detailed Project Report - Commissionerate of Rural Development ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
District Watershed <strong>Development</strong> Unit - Jamnagar<br />
such a situation, it becomes inconvenient to maneuver bullocks for operations such as ploughing and line-sowing.<br />
4) Afforestation<br />
a. Emphasis is placed on maximizing the use <strong>of</strong> available land and resources with high yield tree species. Trees can either be <strong>of</strong> similar species or mixed in a manner that<br />
will result in a stand or forest. Depending on the climate, geographical layout <strong>of</strong> the area and the soil conditions, trees that have the greatest growth potential are selected like<br />
Babool, Neem, Sesame and Ailanthus<br />
Table no.36: Activities related to Surface water resources in the project areas (all financial figures in lakh Rs.)<br />
S.<br />
No.<br />
Village<br />
name<br />
Proposed target<br />
Augmentation/ repair <strong>of</strong> existing<br />
structures<br />
Construction <strong>of</strong> new structures Total target<br />
Type <strong>of</strong> structures Area to<br />
Area to<br />
Area to<br />
Storage Estimated<br />
Estimated<br />
Estimated<br />
be<br />
be Storage<br />
be Storage<br />
No. capacity cost No.<br />
cost(in<br />
cost(in<br />
irrigated<br />
irrigated capacity<br />
irrigated capacity<br />
(Cumec) (Lac)<br />
Lack)<br />
Lack)<br />
(ha)<br />
(ha)<br />
(ha)<br />
(i) Farm Pond 0 0 0 0 7 40 3500 0.56 40 3500 0.56<br />
(ii)Irrigation/Percolation<br />
1 10 25000 9.25 0 0 0 0 10 25000 9.25<br />
Patan<br />
Tank<br />
(iii) Check dam 7 250 50000 4.40 14 280 115000 29.91 540 165000 34.31<br />
(iv)Causeway cum check<br />
0 0 0 0 3 105 8945 8.25 105 8945 8.25<br />
dam<br />
Paradava (i) Farm Pond 0 0 0 0 5 35 2670 0.40 35 2670 0.40<br />
<strong>Detailed</strong> <strong>Project</strong> <strong>Report</strong> – IWMP-1 (Patan )