18.06.2014 Views

Detailed Project Report - Commissionerate of Rural Development ...

Detailed Project Report - Commissionerate of Rural Development ...

Detailed Project Report - Commissionerate of Rural Development ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

District Watershed <strong>Development</strong> Unit - Jamnagar<br />

such a situation, it becomes inconvenient to maneuver bullocks for operations such as ploughing and line-sowing.<br />

4) Afforestation<br />

a. Emphasis is placed on maximizing the use <strong>of</strong> available land and resources with high yield tree species. Trees can either be <strong>of</strong> similar species or mixed in a manner that<br />

will result in a stand or forest. Depending on the climate, geographical layout <strong>of</strong> the area and the soil conditions, trees that have the greatest growth potential are selected like<br />

Babool, Neem, Sesame and Ailanthus<br />

Table no.36: Activities related to Surface water resources in the project areas (all financial figures in lakh Rs.)<br />

S.<br />

No.<br />

Village<br />

name<br />

Proposed target<br />

Augmentation/ repair <strong>of</strong> existing<br />

structures<br />

Construction <strong>of</strong> new structures Total target<br />

Type <strong>of</strong> structures Area to<br />

Area to<br />

Area to<br />

Storage Estimated<br />

Estimated<br />

Estimated<br />

be<br />

be Storage<br />

be Storage<br />

No. capacity cost No.<br />

cost(in<br />

cost(in<br />

irrigated<br />

irrigated capacity<br />

irrigated capacity<br />

(Cumec) (Lac)<br />

Lack)<br />

Lack)<br />

(ha)<br />

(ha)<br />

(ha)<br />

(i) Farm Pond 0 0 0 0 7 40 3500 0.56 40 3500 0.56<br />

(ii)Irrigation/Percolation<br />

1 10 25000 9.25 0 0 0 0 10 25000 9.25<br />

Patan<br />

Tank<br />

(iii) Check dam 7 250 50000 4.40 14 280 115000 29.91 540 165000 34.31<br />

(iv)Causeway cum check<br />

0 0 0 0 3 105 8945 8.25 105 8945 8.25<br />

dam<br />

Paradava (i) Farm Pond 0 0 0 0 5 35 2670 0.40 35 2670 0.40<br />

<strong>Detailed</strong> <strong>Project</strong> <strong>Report</strong> – IWMP-1 (Patan )

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!