Detailed Project Report - Commissionerate of Rural Development ...
Detailed Project Report - Commissionerate of Rural Development ...
Detailed Project Report - Commissionerate of Rural Development ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
District Watershed <strong>Development</strong> Unit - Jamnagar<br />
Amrapar Afforestation 3 4.24 95<br />
Fodder 10 7.46 26<br />
Horticulture 3 1.68 56<br />
Total for Village 36 13.64 177<br />
Malavada Afforestation 3 4.24 96<br />
Fodder 5 3.73 44<br />
Horticulture 1 0.56 16<br />
Total for Village 17 6.26 156<br />
Table No. 45, Summary <strong>of</strong> Soil and water conservation Structures and activity<br />
S. No Measure Unit/Length (Rm) Net Expense Convergence Statergy<br />
1 Staggered Contour Trenching / Stone Bunding 275 Ha 3437500 Forest<br />
2 Waste vier 706 Nos. 9531000 NREGS<br />
3 Check Dam 52 Nos. 15993700 NREGS<br />
4 Cause Way 14 Nos. 7788000 NREGS<br />
5 Earthen bund 13765 rmt 3031688 NREGS<br />
6 Farm Pond 25 4200000 NREGS<br />
7 Farm bund 223500 rmt 9156000 NREGS<br />
8 Horticulture plantation( in Ha) 9 Ha 504000 NREGS<br />
9 Afforestration( in Ha.) 23 Ha 10578198 Forest<br />
Total 64220086/-<br />
<strong>Detailed</strong> <strong>Project</strong> <strong>Report</strong> – IWMP-1 (Patan )