District Watershed <strong>Development</strong> Unit - Jamnagar<br />
Table No 40.4 Cost Estimation <strong>of</strong> Staggered contour trench<br />
Sr. No. Description Unit Quantity Rate<br />
@SOR<br />
(Rs.)<br />
Amount<br />
1 Layout <strong>of</strong> Contour Lines Sq.m 91500.00 0.25 22875.0<br />
2 General Work<br />
Dag Belling 2.5 to 5.00 cm deep Sq.m 91500.00 1.0 91500.0<br />
3 Earth Work<br />
Earth work in excavation in foundation/trench upto 1.5 meter depth. Compaction <strong>of</strong><br />
bottom, correction <strong>of</strong> sides, refilling <strong>of</strong> blank spaces with soil and disposal <strong>of</strong> remaining<br />
soil a) In upto ordinary/s<strong>of</strong>t SOmtr. soil<br />
b) In hard soil/clay/murrum Cu.m. 91500.00 41.0 3751500.0<br />
c) Fragmented rock<br />
d) ordinary rock<br />
4 Vegetative Work<br />
Sowing <strong>of</strong> seed on the constructed ridge<br />
Meter 152500.00<br />
Supply <strong>of</strong> Tecoma/Alata/Dhaman/Pera Seed @ 4 gm/Meter in two lines<br />
5 Overseeding <strong>of</strong> grasses in between two furrows including seed treatment and pallet<br />
making etc. complete @ 8 kg/ha<br />
6 Sub Total<br />
Contigency (0 %)<br />
Supervision Charges (0 %)<br />
Sub Total<br />
Grand Total 3867825/-<br />
(Rs.)<br />
Kg 39 50.0 1950.0<br />
<strong>Detailed</strong> <strong>Project</strong> <strong>Report</strong> – IWMP-1 (Patan )