Detailed Project Report - Commissionerate of Rural Development ...
Detailed Project Report - Commissionerate of Rural Development ...
Detailed Project Report - Commissionerate of Rural Development ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
District Watershed <strong>Development</strong> Unit - Jamnagar<br />
production<br />
7 Chalk Stick Making 4 6000 40000<br />
8 Fodder Bank 4 347200 192800<br />
Total 37 1643654/-<br />
1<br />
Vermi composting 5 22632 48054<br />
2 Animal Distribution<br />
5 (50<br />
nos)<br />
42000 386000<br />
3 Malavada Fodder Bank 2 347200 192800<br />
Groundnut<br />
Processing<br />
1 60000 06000<br />
Total 13 626854/-<br />
Table no. 39: Other activities <strong>of</strong> watershed works phase – Proposed target<br />
Name <strong>of</strong><br />
villages<br />
Ridge area<br />
treatment<br />
Nursery<br />
raising<br />
Land<br />
development<br />
Crop<br />
demonstrations<br />
Fodder Land<br />
development<br />
Sr.<br />
No.<br />
(in<br />
ha)<br />
(in<br />
lakh)<br />
(in<br />
ha)<br />
(in<br />
lakh) (in ha)<br />
(in<br />
lakh) (in ha) (in lakh) (in ha) (in lakh)<br />
Total Estimated cost<br />
(Rs. In lakhs)<br />
1 Patan 100 12.50 2 0.80 564.4 29.91 0 0 15 11.19 54.40<br />
2 Paradava 75 9.35 2 0.80 424.55 58.63 0 0 5 3.73 72.51<br />
3 Amrapar 50 6.20 1 0.40 1016.2 54.12 0 0 10 7.46 68.18<br />
4 Malavada 80 10.61 1 0.40 136.95 17.27 0 0 5 3.73 32.01<br />
<strong>Detailed</strong> <strong>Project</strong> <strong>Report</strong> – IWMP-1 (Patan )