District Watershed <strong>Development</strong> Unit - Jamnagar<br />
6 12 mm thick plaster on outer surface <strong>of</strong> walls in cm 1:3<br />
including racking out joints 20 mm deep, curing finishing etc.<br />
completed (a) Body wall to U/S<br />
Sqm<br />
2 1.0 1.5 3<br />
40.15 Cost Calculation for Cause way<br />
Sr. No. Description Unit Quantity Rate<br />
@SOR<br />
(Rs.)<br />
Amount<br />
(Rs.)<br />
1 Earth Work in excavation in s<strong>of</strong>t soil upto 1.5 m depth and disposing Cum 1 41 41<br />
excavated stuff upto lead <strong>of</strong> 50 m.<br />
2 Earth Work in excavation in s<strong>of</strong>t rock upto 1.5 m depth and disposing<br />
1 96 96<br />
excavated stuff upto lead <strong>of</strong> 50 m.<br />
3 cc 1:4:8 as a foundation concrete for walls using 40 mm coarse aggregates Cum 0.45 1600 720<br />
including curing compaction etc completed<br />
4 uncoarse rubble masonary in cm 1:5 including racking out joints and<br />
finishing curing etc. completed (a) Below GL<br />
uncoarse rubble masonary in cm 1:5 including racking out joints and<br />
finishing curing etc. completed (a) Above GL<br />
Total Masonry quantity 5.1 1460 7446<br />
<strong>Detailed</strong> <strong>Project</strong> <strong>Report</strong> – IWMP-1 (Patan )