District Watershed <strong>Development</strong> Unit - Jamnagar<br />
Sr. No. Description Unit No. Length<br />
Width<br />
Depth<br />
Quantity<br />
(Mt.)<br />
(Mt.)<br />
(Mt..)<br />
1 Earth Work in excavation in s<strong>of</strong>t soil upto 1.5 m depth and<br />
Cum<br />
1.0 1.0 0.5 1<br />
disposing excavated stuff upto lead <strong>of</strong> 50 m. long walls<br />
2<br />
2 Earth Work in excavation in s<strong>of</strong>t rock upto 1.5 m depth and<br />
disposing excavated stuff upto lead <strong>of</strong> 50 m. for long walls<br />
Cum 2 1.0 1.0 0.5 1<br />
3 cc 1:4:8 as a foundation concrete for walls using 40 mm Cum 2 1.0 1.0 0.1 0.2 Cum<br />
coarse aggregates including curing compaction etc completed<br />
for long walls<br />
cc 1:4:8 as a foundation concrete for walls using 40 mm Cum 1 1.0 2.5 0.1 0.25<br />
coarse aggregates including curing compaction etc completed<br />
for bed<br />
Total quantity Cum 0.45 Cum<br />
4 uncoarse rubble masonary in cm 1:5 including racking out Cum 2 1.0 1.0 1.80 3.60<br />
joints and finishing curing etc. completed for walls<br />
Bed 1 1 2.50 0.60 1.5<br />
Total Masonry quantity Cum 5.10<br />
5 cc 1:2:4 as a coping at the top <strong>of</strong> walls including vibrating<br />
finishing curing etc. completed (a) body wall<br />
Cum 1 1.0 4.5 0.2 0.9<br />