District Watershed <strong>Development</strong> Unit - Jamnagar<br />

Sr. No. Description Unit No. Length<br />

Width<br />

Depth<br />

Quantity<br />

(Mt.)<br />

(Mt.)<br />

(Mt..)<br />

1 Earth Work in excavation in s<strong>of</strong>t soil upto 1.5 m depth and<br />

Cum<br />

1.0 1.0 0.5 1<br />

disposing excavated stuff upto lead <strong>of</strong> 50 m. long walls<br />

2<br />

2 Earth Work in excavation in s<strong>of</strong>t rock upto 1.5 m depth and<br />

disposing excavated stuff upto lead <strong>of</strong> 50 m. for long walls<br />

Cum 2 1.0 1.0 0.5 1<br />

3 cc 1:4:8 as a foundation concrete for walls using 40 mm Cum 2 1.0 1.0 0.1 0.2 Cum<br />

coarse aggregates including curing compaction etc completed<br />

for long walls<br />

cc 1:4:8 as a foundation concrete for walls using 40 mm Cum 1 1.0 2.5 0.1 0.25<br />

coarse aggregates including curing compaction etc completed<br />

for bed<br />

Total quantity Cum 0.45 Cum<br />

4 uncoarse rubble masonary in cm 1:5 including racking out Cum 2 1.0 1.0 1.80 3.60<br />

joints and finishing curing etc. completed for walls<br />

Bed 1 1 2.50 0.60 1.5<br />

Total Masonry quantity Cum 5.10<br />

5 cc 1:2:4 as a coping at the top <strong>of</strong> walls including vibrating<br />

finishing curing etc. completed (a) body wall<br />

Cum 1 1.0 4.5 0.2 0.9<br />

<strong>Detailed</strong> <strong>Project</strong> <strong>Report</strong> – IWMP-1 (Patan )