18.06.2014 Views

Detailed Project Report - Commissionerate of Rural Development ...

Detailed Project Report - Commissionerate of Rural Development ...

Detailed Project Report - Commissionerate of Rural Development ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

District Watershed <strong>Development</strong> Unit - Jamnagar<br />

Particulars Quantity Unit<br />

Waste Vier Length 10.00 Mt.<br />

Waste Vier Type<br />

Trapezoidal<br />

Waste Vier height form foundation 1.6 Mt.<br />

Waste Vier top Width 1.00 Mt.<br />

Waste Vier Bottom Width 2.0 Mt.<br />

Waste Vier Section 0.9 SqMt.<br />

Table no 40.6, Quantity Calculation <strong>of</strong> Waste vier (Per Rmt)<br />

Sr. Description<br />

No. 1 Earth Work in excavation in s<strong>of</strong>t soil upto 1.5 m depth and disposing excavated stuff<br />

upto lead <strong>of</strong> 50 m.<br />

2 Earth Work in excavation in s<strong>of</strong>t rock upto 1.5 m depth and disposing excavated stuff<br />

upto lead <strong>of</strong> 50 m.<br />

3 cc 1:4:8 as a foundation concrete for walls using 40 mm coarse aggregates including<br />

curing compaction etc completed<br />

4 uncoarse rubble masonary in cm 1:5 including racking out joints and finishing curing<br />

etc. completed (a) Below GL<br />

Unit No. Length Width Depth Quantity<br />

Cum 1 (Mt.) 1.0 (Mt.) 2.0 (Mt..) 0.5 1 Cum<br />

Cum 1 1.0 2.0 0.5 1 Cum<br />

Cum 1 1.0 2.0 0.1 0.2 Cum<br />

Cum 1 1.0 2.0 0.9 1.8<br />

<strong>Detailed</strong> <strong>Project</strong> <strong>Report</strong> – IWMP-1 (Patan )

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!