District Watershed <strong>Development</strong> Unit - Jamnagar<br />

uncoarse rubble masonary in cm 1:5 including racking out joints and Cum 1 1.0 1.5 1.4 2.1<br />

finishing curing etc. completed (a) Above GL<br />

Toe wall 1 1.0 0.5 0.45 0.23<br />

Total Masonry quantity Cum 5.73<br />

5 cc 1:2:4 as a coping at the top <strong>of</strong> walls including vibrating finishing curing etc. Cum 1 1.0 1.0 0.1 0.1<br />

completed (a) body wall<br />

(b) Appron 1 1.0 1.5 0.1 0.15<br />

(c) Toe wall 1 1.0 0.5 0.1 0.05<br />

Total 0.30<br />

6 12 mm thick plaster on outer surface <strong>of</strong> walls in cm 1:3 including racking out<br />

joints 20 mm deep, curing finishing etc. completed (a) Body wall to U/S<br />

Sqm<br />

1 1.0 1.8 1.8<br />

7 12 mm thick plaster on outer surface <strong>of</strong> walls in cm 1:3 including racking out Sqm 1 1.0 1.65 1.65<br />

joints 20 mm deep, curing finishing etc. completed (b) Body wall to D/S<br />

(c) Toe wall 2 1.0 0.45 0.90<br />

3 Total quantity <strong>of</strong> plaster Sqm 4.35<br />

40.11 Cost Calculation for Check Dam<br />

<strong>Detailed</strong> <strong>Project</strong> <strong>Report</strong> – IWMP-1 (Patan )