18.06.2014 Views

Detailed Project Report - Commissionerate of Rural Development ...

Detailed Project Report - Commissionerate of Rural Development ...

Detailed Project Report - Commissionerate of Rural Development ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

District Watershed <strong>Development</strong> Unit - Jamnagar<br />

Table no. 10: Flood and drought condition:<br />

Sr.<br />

Village Flood (Incidence) Drought (Incidence)<br />

1<br />

No.<br />

Patan Nil Once in 3 Years<br />

2 Paradava Nil Once in 3 Years<br />

3 Amrapar Nil Once in 3 Years<br />

4 Malvada Nil Once in 3 Years<br />

Table no. 11: Soil Erosion<br />

Cause Type <strong>of</strong> erosion Area affected (ha) Run <strong>of</strong>f (mm/ year) Average soil loss (Tonnes/<br />

Water erosion<br />

a Sheet 2036.07<br />

b Rill 1163.47<br />

c Gully 1628.86<br />

d Ravenous<br />

Sub-Total 4828.40<br />

Wind erosion 0 NA<br />

Total 4828.40<br />

Table no. 12: Climatic condition<br />

<strong>Detailed</strong> <strong>Project</strong> <strong>Report</strong> – IWMP-1 (Patan )<br />

30-40%<br />

ha/ year)<br />

Sr. No. Year Rainfall (in mm) Temperature (°C) Highest intensity <strong>of</strong> Rainfall<br />

(mm in a day)<br />

Max.<br />

Min.<br />

1 1999 321 42 31 32<br />

2 2000 368 43 29 69<br />

3 2001 616 45 30 95<br />

4 2002 215 42 31 34<br />

Max.<br />

5 2003 601 43 32 90<br />

6 2004 543 41 29 71

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!