District Watershed <strong>Development</strong> Unit - Jamnagar<br />

@ 20% from April to july<br />

b Casulity replacement transport & planting 222 728 0 728<br />

c First weeding cum soil working 1111 1889 0 1889<br />

d Second weeding cum soil working 1111 1444 0 1444<br />

e fertilizer and support watering 3 times 1111 5999 4000 9999<br />

f watch and ward 1111 3447 240 3687<br />

Total <strong>of</strong> 5 13860 4297 18157<br />

6. Second year cultural operation<br />

a One weeding cum soil working 1111 1889 0 1889<br />

b Repairs <strong>of</strong> fence and fire protection 111 2487 0 2487<br />

Total <strong>of</strong> 6 4376 0 4376<br />

Grant Total <strong>of</strong> 1 to 6 66602 74931 141533<br />

Village Wise Afforastration<br />

Sr. No Village Neme No. <strong>of</strong> Unit Per unit cost Total cost<br />

1<br />

Patan<br />

12<br />

141533 1698396<br />

2 Paradava 5 141533<br />

3 Amrapar 3 141533<br />

4 Malavada 3 141533<br />

<strong>Detailed</strong> <strong>Project</strong> <strong>Report</strong> – IWMP-1 (Patan )<br />

Total 23<br />

707665<br />

424599<br />

424599<br />

3255259/-