Detailed Project Report - Commissionerate of Rural Development ...
Detailed Project Report - Commissionerate of Rural Development ...
Detailed Project Report - Commissionerate of Rural Development ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
District Watershed <strong>Development</strong> Unit - Jamnagar<br />
@ 20% from April to july<br />
b Casulity replacement transport & planting 222 728 0 728<br />
c First weeding cum soil working 1111 1889 0 1889<br />
d Second weeding cum soil working 1111 1444 0 1444<br />
e fertilizer and support watering 3 times 1111 5999 4000 9999<br />
f watch and ward 1111 3447 240 3687<br />
Total <strong>of</strong> 5 13860 4297 18157<br />
6. Second year cultural operation<br />
a One weeding cum soil working 1111 1889 0 1889<br />
b Repairs <strong>of</strong> fence and fire protection 111 2487 0 2487<br />
Total <strong>of</strong> 6 4376 0 4376<br />
Grant Total <strong>of</strong> 1 to 6 66602 74931 141533<br />
Village Wise Afforastration<br />
Sr. No Village Neme No. <strong>of</strong> Unit Per unit cost Total cost<br />
1<br />
Patan<br />
12<br />
141533 1698396<br />
2 Paradava 5 141533<br />
3 Amrapar 3 141533<br />
4 Malavada 3 141533<br />
<strong>Detailed</strong> <strong>Project</strong> <strong>Report</strong> – IWMP-1 (Patan )<br />
Total 23<br />
707665<br />
424599<br />
424599<br />
3255259/-