District Watershed <strong>Development</strong> Unit - Jamnagar<br />
Trench Width 0.6 Mt.<br />
Trench Depth 1.0 Mt.<br />
No. Of Trenches Per Ha. 100 Nos.<br />
Proposed Area 30.00 Ha.<br />
Table No 40.3, Quantity Calculation<br />
Sr.<br />
Description Unit No. Length<br />
Width<br />
Depth<br />
Quantity<br />
No.<br />
(Mt.)<br />
(Mt.)<br />
(Mt..)<br />
1 Layout <strong>of</strong> Contour Lines Sq.m 30500 5.00 0.6 91500<br />
2 General Work<br />
Clearing bushes / Dag Belling 2.5 to 5.00 cm deep Sq.m 30500 5.00 0.6 91500<br />
3 Earth Work<br />
Earth work in excavation in foundation/trench upto 1.5 meter depth. Compaction <strong>of</strong><br />
bottom, correction <strong>of</strong> sides, refilling <strong>of</strong> blank spaces with soil and disposal <strong>of</strong> remaining<br />
soil a) In upto ordinary/s<strong>of</strong>t SOmtr. soil<br />
b) In hard soil/clay/murrum Cu.m. 30500 5.00 0.6 1.00 91500<br />
c) Fragmented rock<br />
d] ordinary rock<br />
4 Vegetative Work<br />
Sowing <strong>of</strong> seed on the constructed ridge Meter 30500 5.00 152500<br />
<strong>Detailed</strong> <strong>Project</strong> <strong>Report</strong> – IWMP-1 (Patan )