19.06.2014 Views

Final 2011/14 MTIP - sacog

Final 2011/14 MTIP - sacog

Final 2011/14 MTIP - sacog

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Sacramento Area Council of Governments<br />

Appendix 4 Detail Listing of Grouped Projects<br />

SACOG ID<br />

VAR79030 -<br />

ELD19269 El Dorado County Lead Agency City of Placerville Dept of Public Works<br />

SACOG ID #<br />

Project Title<br />

Project Description<br />

EA Number<br />

Last Revised<br />

Completion Year<br />

ELD19269 n/a<br />

11-00 2012<br />

El Dorado Trail Bike Path<br />

Design and construct a Class I bike path along the El<br />

Dorado Trail between Clay Street and the Bedford<br />

Ave. Bike and Pedestrian Overcrossing. (Toll Credits<br />

for PE)<br />

Fiscal Year Revenue Source Engineering Right of Way Construction Total Revenue<br />

<strong>2011</strong> RIP - STP Enhancements<br />

$85,000 $85,000<br />

2012 Local Agency Funds<br />

$25,000 $25,000<br />

2012 RIP - STP Enhancements<br />

$84,104 $84,104<br />

2012 RIP - State Cash<br />

$10,897 $10,897<br />

$85,000<br />

$0 $120,001 $205,001<br />

Federal Project<br />

Total Cost $205,001<br />

Exempt<br />

Category:<br />

Bicycle and pedestrian facilities<br />

SACOG ID<br />

VAR79030 -<br />

ELD19268 El Dorado County Lead Agency El Dorado County Dept of Transportation<br />

SACOG ID #<br />

Project Title<br />

Project Description<br />

EA Number<br />

Last Revised<br />

Completion Year<br />

ELD19268 n/a<br />

11-00 2012<br />

El Dorado Hills Class I Bike Path - SMUD Corridor<br />

Design and construct a Class I bike path between El<br />

Dorado Hills Blvd and Silva Valley Pkwy within the<br />

powerline easement operated by the Sacramento<br />

Municipal Utility District (SMUD); project includes an<br />

8-foot wide Class I bike path with a 2-foot wide<br />

shoulder on one side and a 4-foot wide shoulder on<br />

the other side; total length is approximately 3,000<br />

feet. CIP97005<br />

Fiscal Year Revenue Source Engineering Right of Way Construction Total Revenue<br />

<strong>2011</strong> AB 2766<br />

$25,000 $25,000<br />

<strong>2011</strong> RIP - STP Enhancements<br />

$15,000 $15,000<br />

2012 Local Agency Funds<br />

$100,000 $100,000<br />

2012 RIP - STP Enhancements<br />

$280,000 $280,000<br />

$40,000<br />

$0 $380,000 $420,000<br />

Federal Project<br />

Total Cost $420,000<br />

Exempt<br />

Category:<br />

Bicycle and pedestrian facilities<br />

<strong>2011</strong> <strong>MTIP</strong> - Page <strong>14</strong>7 of 423<br />

Page 12<br />

Monday, September 27, 2010

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!