Final 2011/14 MTIP - sacog
Final 2011/14 MTIP - sacog
Final 2011/14 MTIP - sacog
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Appendix 10<br />
County Lead Agency Project ID<br />
Grouped Cat.<br />
ID Title Description<br />
Completion<br />
Year Total Cost Exempt Cat. Grouped Cat.<br />
Yuba<br />
Yuba<br />
Various bridges in Yuba County: conduct preventive maintenance. See the<br />
Yuba County Dept of<br />
Public Works YUB16021 VAR79008 Bridge Preventive Maintenance<br />
Caltrans website for a detailed list of locations:<br />
http://www.dot.ca.gov/hq/LocalPrograms/hbrr99/HBP_MPO.html#SACOG 2015 $68,000<br />
Yuba County Dept of<br />
Public Works YUB15988 VAR79047 E St. Mx Irrigation System<br />
Widening narrow pavements or<br />
reconstructing bridges (no<br />
additional travel lanes)<br />
Transportation enhancement<br />
South of Marysville by the E Street Bridge at the Yuba River river bottoms.<br />
Work will include providing water supply well, electrical service, irrigation<br />
system and constructing restroom facilities and septic system for off-road<br />
riding facility. (RTM-07-011) <strong>2011</strong><br />
activities (except rehabilitation<br />
and operation of historic<br />
transportation buildings,<br />
$400,381 structures or facilities)<br />
Grouped Projects for Bridge<br />
Rehabilitation and Reconstruction -<br />
HBP Program<br />
Grouped Projects for Transportation<br />
enhancement activities<br />
Yuba<br />
Yuba<br />
Yuba County Dept of<br />
Public Works YUB15928 VAR79061<br />
Feather River Blvd Traffic<br />
Signal at River Oaks Blvd Construct new traffic signal at Feather River Blvd and River Oaks Blvd. 2013<br />
Intersection signalization projects<br />
$300,000 at individual intersections<br />
Yuba County Dept of<br />
2 lane extension of regional arterial from Orchards Subdivision to North<br />
Public Works YUB16013 Goldfields Parkway<br />
Beale Road (0.6 miles) 20<strong>14</strong> $1,000,000<br />
Grouped Projects for Intersection<br />
Signalization<br />
Yuba<br />
Yuba<br />
Yuba<br />
Yuba<br />
Yuba<br />
Yuba<br />
Yuba<br />
Yuba County Dept of<br />
Public Works YUB15881 VAR79061<br />
Goldfields Parkway Traffic<br />
Signal<br />
Yuba County Dept of<br />
Public Works YUB16010 VAR79010<br />
Hammonton-Smartsville Rd<br />
Shoulder Improvement<br />
Yuba County Dept of<br />
Public Works YUB15970 VAR79010 Headwall Removal<br />
Yuba County Dept of<br />
Public Works<br />
YUB15600<br />
Yuba County Dept of<br />
Public Works YUB16019 VAR79008<br />
Honcut Road Bridge<br />
Replacement<br />
La Porte Rd. Bridge<br />
Replacement<br />
Yuba County Dept of<br />
Public Works YUB15996 VAR79012<br />
Loma Rica Rd. Safety<br />
Improvements<br />
Yuba County Dept of<br />
Public Works YUB15950 McGowan Parkway<br />
Install new traffic signal at the intersection of North Beale Road and<br />
Goldfields Parkway 2015<br />
Intersection signalization projects<br />
$300,000 at individual intersections<br />
Hammonton-Smartsville Rd from 0.7 miles west to 2 miles west of South<br />
Golden Parkway. Widen the typical shoulder section to 4' of pavement with<br />
3' of aggregate base rock. HSIP3-03-029 2013 $645,000 Safety improvement program<br />
Remove headwalls near roadway for safety issues and realign Woodruff<br />
Lane. <strong>2011</strong> $500,000 Safety improvement program<br />
In Yuba County, Community of Loma Rica, Honcut Road Bridge over<br />
Honcut Creek: Replace 1 lane bridge with 2 lane bridge. (Toll Credits for<br />
CON) 2012 $3,027,000<br />
Widening narrow pavements or<br />
La Porte Rd, over New York Creek, 0.3 miles north of New York Flat Rd:<br />
Replace 2 lane bridge with new 2 lane bridge. 2012<br />
reconstructing bridges (no<br />
$1,484,500 additional travel lanes)<br />
Loma Rica Rd. from Verjeles Rd. to Marysville Rd.: Widen shoulders;<br />
extend culverts; improve drainage; install pavement markings and striping. 2013 $1,055,000 Safety improvement program<br />
Construct 3-lane collector McGowan Parkway from Arboga Road to Union<br />
Pacific Railroad. 20<strong>14</strong> $1,300,000<br />
Grouped Projects for Intersection<br />
Signalization<br />
Grouped Projects for Safety<br />
Improvements - HSIP Program<br />
Grouped Projects for Safety<br />
Improvements - HSIP Program<br />
Grouped Projects for Bridge<br />
Rehabilitation and Reconstruction -<br />
HBP Program<br />
Grouped Projects for Safety<br />
Improvements on High Risk Rural<br />
Roads - HRRR program<br />
Yuba<br />
Yuba<br />
Yuba<br />
Yuba<br />
Yuba<br />
Yuba<br />
Yuba<br />
Yuba<br />
Yuba<br />
Yuba<br />
Yuba<br />
Yuba County Dept of<br />
McGowan Parkway and Arboga Install new Traffic Signal at the intersection of McGowan Parkway and<br />
Intersection signalization projects Grouped Projects for Intersection<br />
Public Works YUB15871 VAR79061 Road Traffic Signalization Arboga Road. 20<strong>14</strong> $250,000 at individual intersections Signalization<br />
Yuba County Dept of<br />
In Linda, install raised median on North Beale Rd from Feather River Blvd.<br />
Grouped Projects for Safety<br />
Public Works YUB16009 VAR79010 N. Beale Rd Raised Median to Linda Ave. HSIP3-03-027 2013 $1,100,000 Safety improvement program Improvements - HSIP Program<br />
Yuba County Dept of<br />
Public Works YUB16018 VAR79008<br />
New York House Rd Bridge<br />
Replacement<br />
Yuba County Dept of<br />
Public Works YUB16008 VAR79047 North Beale Complete Street<br />
Yuba County Dept of<br />
Public Works YUB16011 VAR79017<br />
Yuba County Dept of<br />
Public Works<br />
YUB15877<br />
Yuba County Dept of<br />
Public Works YUB16012 VAR79047<br />
Yuba County Dept of<br />
Public Works YUB16006 VAR79030<br />
North Beale Rd. Shoulder<br />
Improvements and Overlay<br />
North Beale Road<br />
Improvements<br />
Olivehurst Ave. Complete<br />
Street<br />
Power Line Rd Bike/Ped<br />
Improvements<br />
New York House Rd over Dry Creek, 0.2 miles northeast of Frenchtown Rd:<br />
Replace the existing structurally deficient 2 lane bridge with a new lane<br />
bridge. (Toll Credits for PE, ROW, & CON) 2015<br />
Widening narrow pavements or<br />
reconstructing bridges (no<br />
$1,680,000 additional travel lanes)<br />
Transportation enhancement<br />
activities (except rehabilitation<br />
and operation of historic<br />
In Linda, North Beale Road from Lindhurst Ave. to Griffith Ave.: Install<br />
transportation buildings,<br />
curbs, gutters, wider sidewalks, landscaping, bike lanes and roundabouts. 2020 $20,000,000 structures or facilities)<br />
North Beale Rd., from Brophy Rd. to Beale Air Force Base: Widen paved<br />
shoulders to 6 feet. FRom Griffith Ave. to Beale Air Force Base: Remove<br />
open-grade AC and repave roadway. Also, improve intersection at North<br />
Pavement resurfacing and/or<br />
Beale Rd. and Brophy Rd. 2013 $1,470,000 rehabilitation<br />
Widen Roadway from 2-lanes to 4-lanes and install curb gutter and<br />
sidewalk from Linda Ave to Griffith Rd. 20<strong>14</strong> $2,000,000<br />
Transportation enhancement<br />
activities (except rehabilitation<br />
Olivehurst Ave., from 7th Ave. to McGowan Pkwy: Install curbs, gutters,<br />
and operation of historic<br />
sidewalks, bicycle lanes, center turn lane, improved transit stops, and<br />
transportation buildings,<br />
associate drainage improvements. 2013 $1,820,000 structures or facilities)<br />
Olivehurst, on Powerline Rd, from 15th Ave. to 9th Ave.: Construct new<br />
sidewalks and bicycle lanes. 2013 $1,342,800 Bicycle and pedestrian facilities<br />
Hwy 70 / Feather River Blvd. interchange: signalized intersection in<br />
Yuba County Dept of<br />
Public Works YUB15360<br />
conjunction with the Plumas Lake Specific Plan and the Hwy. 70 widening<br />
Route 70 at Feather River Blvd. (Phase 2). 20<strong>14</strong> $22,333,000<br />
Yuba County Dept of<br />
Public Works YUB16017 VAR79008 Scales Rd Bridge Rehab<br />
Yuba County Dept of<br />
Public Works YUB16020 VAR79008<br />
Smartsville Rd Bridge<br />
Replacement<br />
Scales Rd, over Slate Creek, 3 miles northeast of La Porte Rd.: replace the<br />
deck system and paint the structural steel on this rural one lane bridge. (Toll<br />
Credits for PE & CON) 2015 $48,400<br />
Widening narrow pavements or<br />
reconstructing bridges (no<br />
additional travel lanes)<br />
Smartsville Rd, over Vineyard Creek, 0.3 miles southwest of Waldo Rd:<br />
Widening narrow pavements or<br />
Replace existing timber bridge with new 2 lane bridge. (Toll Credits for<br />
reconstructing bridges (no<br />
ROW & CON) 2015 $1,869,000 additional travel lanes)<br />
Grouped Projects for Bridge<br />
Rehabilitation and Reconstruction -<br />
HBP Program<br />
Grouped Projects for Transportation<br />
enhancement activities<br />
Grouped Projects for Pavement<br />
resurfacing and/or rehabilitation<br />
Grouped Projects for Transportation<br />
enhancement activities<br />
Grouped Projects for Bicycle and<br />
pedestrian facilities<br />
Grouped Projects for Bridge<br />
Rehabilitation and Reconstruction -<br />
HBP Program<br />
Grouped Projects for Bridge<br />
Rehabilitation and Reconstruction -<br />
HBP Program<br />
<strong>2011</strong> <strong>MTIP</strong> - Page 415 of 423<br />
Page 36 of 37