19.06.2014 Views

Final 2011/14 MTIP - sacog

Final 2011/14 MTIP - sacog

Final 2011/14 MTIP - sacog

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Appendix 10<br />

County Lead Agency Project ID<br />

Grouped Cat.<br />

ID Title Description<br />

Completion<br />

Year Total Cost Exempt Cat. Grouped Cat.<br />

Yuba<br />

Yuba<br />

Various bridges in Yuba County: conduct preventive maintenance. See the<br />

Yuba County Dept of<br />

Public Works YUB16021 VAR79008 Bridge Preventive Maintenance<br />

Caltrans website for a detailed list of locations:<br />

http://www.dot.ca.gov/hq/LocalPrograms/hbrr99/HBP_MPO.html#SACOG 2015 $68,000<br />

Yuba County Dept of<br />

Public Works YUB15988 VAR79047 E St. Mx Irrigation System<br />

Widening narrow pavements or<br />

reconstructing bridges (no<br />

additional travel lanes)<br />

Transportation enhancement<br />

South of Marysville by the E Street Bridge at the Yuba River river bottoms.<br />

Work will include providing water supply well, electrical service, irrigation<br />

system and constructing restroom facilities and septic system for off-road<br />

riding facility. (RTM-07-011) <strong>2011</strong><br />

activities (except rehabilitation<br />

and operation of historic<br />

transportation buildings,<br />

$400,381 structures or facilities)<br />

Grouped Projects for Bridge<br />

Rehabilitation and Reconstruction -<br />

HBP Program<br />

Grouped Projects for Transportation<br />

enhancement activities<br />

Yuba<br />

Yuba<br />

Yuba County Dept of<br />

Public Works YUB15928 VAR79061<br />

Feather River Blvd Traffic<br />

Signal at River Oaks Blvd Construct new traffic signal at Feather River Blvd and River Oaks Blvd. 2013<br />

Intersection signalization projects<br />

$300,000 at individual intersections<br />

Yuba County Dept of<br />

2 lane extension of regional arterial from Orchards Subdivision to North<br />

Public Works YUB16013 Goldfields Parkway<br />

Beale Road (0.6 miles) 20<strong>14</strong> $1,000,000<br />

Grouped Projects for Intersection<br />

Signalization<br />

Yuba<br />

Yuba<br />

Yuba<br />

Yuba<br />

Yuba<br />

Yuba<br />

Yuba<br />

Yuba County Dept of<br />

Public Works YUB15881 VAR79061<br />

Goldfields Parkway Traffic<br />

Signal<br />

Yuba County Dept of<br />

Public Works YUB16010 VAR79010<br />

Hammonton-Smartsville Rd<br />

Shoulder Improvement<br />

Yuba County Dept of<br />

Public Works YUB15970 VAR79010 Headwall Removal<br />

Yuba County Dept of<br />

Public Works<br />

YUB15600<br />

Yuba County Dept of<br />

Public Works YUB16019 VAR79008<br />

Honcut Road Bridge<br />

Replacement<br />

La Porte Rd. Bridge<br />

Replacement<br />

Yuba County Dept of<br />

Public Works YUB15996 VAR79012<br />

Loma Rica Rd. Safety<br />

Improvements<br />

Yuba County Dept of<br />

Public Works YUB15950 McGowan Parkway<br />

Install new traffic signal at the intersection of North Beale Road and<br />

Goldfields Parkway 2015<br />

Intersection signalization projects<br />

$300,000 at individual intersections<br />

Hammonton-Smartsville Rd from 0.7 miles west to 2 miles west of South<br />

Golden Parkway. Widen the typical shoulder section to 4' of pavement with<br />

3' of aggregate base rock. HSIP3-03-029 2013 $645,000 Safety improvement program<br />

Remove headwalls near roadway for safety issues and realign Woodruff<br />

Lane. <strong>2011</strong> $500,000 Safety improvement program<br />

In Yuba County, Community of Loma Rica, Honcut Road Bridge over<br />

Honcut Creek: Replace 1 lane bridge with 2 lane bridge. (Toll Credits for<br />

CON) 2012 $3,027,000<br />

Widening narrow pavements or<br />

La Porte Rd, over New York Creek, 0.3 miles north of New York Flat Rd:<br />

Replace 2 lane bridge with new 2 lane bridge. 2012<br />

reconstructing bridges (no<br />

$1,484,500 additional travel lanes)<br />

Loma Rica Rd. from Verjeles Rd. to Marysville Rd.: Widen shoulders;<br />

extend culverts; improve drainage; install pavement markings and striping. 2013 $1,055,000 Safety improvement program<br />

Construct 3-lane collector McGowan Parkway from Arboga Road to Union<br />

Pacific Railroad. 20<strong>14</strong> $1,300,000<br />

Grouped Projects for Intersection<br />

Signalization<br />

Grouped Projects for Safety<br />

Improvements - HSIP Program<br />

Grouped Projects for Safety<br />

Improvements - HSIP Program<br />

Grouped Projects for Bridge<br />

Rehabilitation and Reconstruction -<br />

HBP Program<br />

Grouped Projects for Safety<br />

Improvements on High Risk Rural<br />

Roads - HRRR program<br />

Yuba<br />

Yuba<br />

Yuba<br />

Yuba<br />

Yuba<br />

Yuba<br />

Yuba<br />

Yuba<br />

Yuba<br />

Yuba<br />

Yuba<br />

Yuba County Dept of<br />

McGowan Parkway and Arboga Install new Traffic Signal at the intersection of McGowan Parkway and<br />

Intersection signalization projects Grouped Projects for Intersection<br />

Public Works YUB15871 VAR79061 Road Traffic Signalization Arboga Road. 20<strong>14</strong> $250,000 at individual intersections Signalization<br />

Yuba County Dept of<br />

In Linda, install raised median on North Beale Rd from Feather River Blvd.<br />

Grouped Projects for Safety<br />

Public Works YUB16009 VAR79010 N. Beale Rd Raised Median to Linda Ave. HSIP3-03-027 2013 $1,100,000 Safety improvement program Improvements - HSIP Program<br />

Yuba County Dept of<br />

Public Works YUB16018 VAR79008<br />

New York House Rd Bridge<br />

Replacement<br />

Yuba County Dept of<br />

Public Works YUB16008 VAR79047 North Beale Complete Street<br />

Yuba County Dept of<br />

Public Works YUB16011 VAR79017<br />

Yuba County Dept of<br />

Public Works<br />

YUB15877<br />

Yuba County Dept of<br />

Public Works YUB16012 VAR79047<br />

Yuba County Dept of<br />

Public Works YUB16006 VAR79030<br />

North Beale Rd. Shoulder<br />

Improvements and Overlay<br />

North Beale Road<br />

Improvements<br />

Olivehurst Ave. Complete<br />

Street<br />

Power Line Rd Bike/Ped<br />

Improvements<br />

New York House Rd over Dry Creek, 0.2 miles northeast of Frenchtown Rd:<br />

Replace the existing structurally deficient 2 lane bridge with a new lane<br />

bridge. (Toll Credits for PE, ROW, & CON) 2015<br />

Widening narrow pavements or<br />

reconstructing bridges (no<br />

$1,680,000 additional travel lanes)<br />

Transportation enhancement<br />

activities (except rehabilitation<br />

and operation of historic<br />

In Linda, North Beale Road from Lindhurst Ave. to Griffith Ave.: Install<br />

transportation buildings,<br />

curbs, gutters, wider sidewalks, landscaping, bike lanes and roundabouts. 2020 $20,000,000 structures or facilities)<br />

North Beale Rd., from Brophy Rd. to Beale Air Force Base: Widen paved<br />

shoulders to 6 feet. FRom Griffith Ave. to Beale Air Force Base: Remove<br />

open-grade AC and repave roadway. Also, improve intersection at North<br />

Pavement resurfacing and/or<br />

Beale Rd. and Brophy Rd. 2013 $1,470,000 rehabilitation<br />

Widen Roadway from 2-lanes to 4-lanes and install curb gutter and<br />

sidewalk from Linda Ave to Griffith Rd. 20<strong>14</strong> $2,000,000<br />

Transportation enhancement<br />

activities (except rehabilitation<br />

Olivehurst Ave., from 7th Ave. to McGowan Pkwy: Install curbs, gutters,<br />

and operation of historic<br />

sidewalks, bicycle lanes, center turn lane, improved transit stops, and<br />

transportation buildings,<br />

associate drainage improvements. 2013 $1,820,000 structures or facilities)<br />

Olivehurst, on Powerline Rd, from 15th Ave. to 9th Ave.: Construct new<br />

sidewalks and bicycle lanes. 2013 $1,342,800 Bicycle and pedestrian facilities<br />

Hwy 70 / Feather River Blvd. interchange: signalized intersection in<br />

Yuba County Dept of<br />

Public Works YUB15360<br />

conjunction with the Plumas Lake Specific Plan and the Hwy. 70 widening<br />

Route 70 at Feather River Blvd. (Phase 2). 20<strong>14</strong> $22,333,000<br />

Yuba County Dept of<br />

Public Works YUB16017 VAR79008 Scales Rd Bridge Rehab<br />

Yuba County Dept of<br />

Public Works YUB16020 VAR79008<br />

Smartsville Rd Bridge<br />

Replacement<br />

Scales Rd, over Slate Creek, 3 miles northeast of La Porte Rd.: replace the<br />

deck system and paint the structural steel on this rural one lane bridge. (Toll<br />

Credits for PE & CON) 2015 $48,400<br />

Widening narrow pavements or<br />

reconstructing bridges (no<br />

additional travel lanes)<br />

Smartsville Rd, over Vineyard Creek, 0.3 miles southwest of Waldo Rd:<br />

Widening narrow pavements or<br />

Replace existing timber bridge with new 2 lane bridge. (Toll Credits for<br />

reconstructing bridges (no<br />

ROW & CON) 2015 $1,869,000 additional travel lanes)<br />

Grouped Projects for Bridge<br />

Rehabilitation and Reconstruction -<br />

HBP Program<br />

Grouped Projects for Transportation<br />

enhancement activities<br />

Grouped Projects for Pavement<br />

resurfacing and/or rehabilitation<br />

Grouped Projects for Transportation<br />

enhancement activities<br />

Grouped Projects for Bicycle and<br />

pedestrian facilities<br />

Grouped Projects for Bridge<br />

Rehabilitation and Reconstruction -<br />

HBP Program<br />

Grouped Projects for Bridge<br />

Rehabilitation and Reconstruction -<br />

HBP Program<br />

<strong>2011</strong> <strong>MTIP</strong> - Page 415 of 423<br />

Page 36 of 37

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!