Final 2011/14 MTIP - sacog
Final 2011/14 MTIP - sacog
Final 2011/14 MTIP - sacog
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Appendix 10<br />
County Lead Agency Project ID<br />
Grouped Cat.<br />
ID Title Description<br />
Completion<br />
Year Total Cost Exempt Cat. Grouped Cat.<br />
In Placer, Sacramento and Colusa Counties, at various locations - Install<br />
Transportation Management System (TMS)Units for monitoring congestion<br />
Construction or renovation of<br />
power, signal, and<br />
Grouped Projects for Safety<br />
Improvements - SHOPP Mobility<br />
Various Caltrans District 3 CAL18781 VAR79005 Install TMS Units<br />
and delay. 2012 $7,817,659 communications systems Program<br />
Various Caltrans District 3 CAL18784 VAR79005<br />
ITS Installation - Various<br />
Locations<br />
In El Dorado, Nevada and Placer Counties at various locations on U.S. 50, I-<br />
80, SR 89 and SR 267 - install Intelligent Transportation Systems. LIMITS:<br />
El Dorado, Nevada and Placer Counties 2013<br />
Construction or renovation of<br />
power, signal, and<br />
$4,606,000 communications systems<br />
Grouped Projects for Safety<br />
Improvements - SHOPP Mobility<br />
Program<br />
Various Caltrans District 3 CAL20405 VAR79002 Rumble Strips<br />
Various Caltrans District 3 CAL20393 VAR79002<br />
Various Caltrans District 3 CAL20412 VAR79002<br />
Sac/Pla/Nev Thin Friction<br />
Surface<br />
Sac/Yol/Sut/Yub/Nev Crash<br />
Cushions<br />
In Butte, Colusa, Placer, Sacramento and Sutter Counties on various routes<br />
at various locations - Install rumble strips (SHOPP - Collision Reduction)<br />
[But-99: Eaton Rd to Tehama Co Line, But-99: Shippee Rd to Freeway, Col-<br />
20: Niagara Rd to Jct Rte 45, Col/Sut-20: Sycamore Rd to Humphrey, Pla-<br />
80: Applegate Rd OC to 174 Jct, Sac-99: Near Walnut St to near Grant<br />
Line Rd, Sut-113: Knight's Landing to Sutter Causeway] 2012 $1,400,000 Safety improvement program<br />
In Sacramento, Placer, and Nevada Counties at various locations - Place a<br />
thin high friction surface [Sac-05-17.27, Sac-50-R0.39/R0.79, Sac-50-<br />
R2.68, Sac-50-9.5, Sac-50-17, Pla-80-8.87, Nev-20-30.5] (CTIPS ID 130-<br />
Pavement resurfacing and/or<br />
0000-2089). 2012 $842,000 rehabilitation<br />
In Sacramento, Yolo, Sutter, Yuba, and Nevada Counties on Routes 5, 50,<br />
51, 80, 99, 49, and 20 - Upgrade crash cushions at various locations<br />
[SHOPP Collision Reduction - Safety Enhancements] (Sac-5-22.27/26.96,<br />
Sac-50-L0.27/L2.35, Sac-51-0.09/3.93, Sac-99-21.94/24.30, Sac-80-M9.19,<br />
Yol-50-2.0/2.1, Yol-80-R10.20, Nev-20-R16.5/16.9, Nev-49-R13.27, Sut-20-<br />
16.72, Yub-20-0.54) 2013 $3,912,000 Safety improvement program<br />
Grouped Projects for Safety<br />
Improvements - SHOPP Collision<br />
Reduction Program<br />
Grouped Projects for Safety<br />
Improvements - SHOPP Collision<br />
Reduction Program<br />
Grouped Projects for Safety<br />
Improvements - SHOPP Collision<br />
Reduction Program<br />
Various Caltrans District 3 CAL17380 VAR79004<br />
Various Caltrans District 3 CAL20379<br />
Various Caltrans District 3 CAL20442 VAR79002<br />
Various Caltrans District 3 CAL18829 VAR79002<br />
Various Caltrans District 3 CAL18780 VAR79002<br />
SACOG Region Emergency<br />
Repair Program<br />
U.S. 50 Auxiliary Lanes,<br />
Bradshaw to Mather<br />
Upgrade MBGR at Various<br />
Locations<br />
Repair of damage caused by<br />
natural disasters, civil unrest, or<br />
terrorist acts, except projects<br />
Lump Sum - Emergency Repair (excluding Federal Emergency Relief<br />
Program funds)for non-capacity increasing projects only. 2015<br />
involving substantial functional,<br />
$400,000 locational or capacity changes<br />
On Highway 50 between Mather Field Road and Bradshaw Road -<br />
Construct EB and WB Auxiliary Lanes 2016 $3,700,000<br />
Grouped Projects for Emergency Repair<br />
- SHOPP Emergency Response<br />
Program<br />
Various locations in El Dorado, Placer, Sutter, Butte and Nevada counties<br />
on Routes 99,20, 49 and 50 - Upgrade metal beam guard rail (MBGR) end<br />
treatments [approx. 50% of work in El Dorado, Placer and Sutter counties;<br />
Grouped Projects for Safety<br />
Guardrails, median barriers, crash Improvements - SHOPP Collision<br />
29% in Butte county; and 21% in Nevada county] 2013 $5,170,000 cushions<br />
Reduction Program<br />
Upgrade MBGR End<br />
In Sacramento, Placer, Yuba and Yolo Counties at various locations -<br />
Treatments in Various Counties<br />
Various Counties - Upgrade<br />
Guardrail<br />
Various Caltrans District 3 CAL20411 VAR79002 Yol/Sac-80 Gore Paving<br />
Various Caltrans Headquarters CAL18820 VAR79058<br />
Various<br />
Various<br />
FTA Section 5310 Elderly and<br />
Disabled Transit Program<br />
Grouped Projects<br />
Sac. Metro Air Quality<br />
Management District VAR56031 VAR79030 Bicycle Parking<br />
Sac. Metro Air Quality<br />
Management District VAR56011 VAR79046<br />
Cascade Sierra Solutions Long<br />
Haul Trucking<br />
Upgrade metal beam guard rail end treatments. 2013 $6,380,000<br />
In Yolo, Glenn, Colusa, Sacramento, Yuba, Butte, El Dorado and Placer<br />
Counties at various locations on various routes (5, 50, 65, 70, 99, 113 and<br />
505) - Upgrade guardrail. 2013 $2,843,400<br />
Guardrails, median barriers, crash<br />
cushions<br />
Guardrails, median barriers, crash<br />
cushions<br />
In Yolo and Sacramento Counties on I-80 at Various Locations - Gore<br />
paving / road safety improvements [SHOPP Collision Reduction - Roadside<br />
Safety Improvements] 2013 $3,163,000 Safety improvement program<br />
transit capital purchases, including large, medium, and small buses,<br />
minivans, bus lifts, scheduling software, mobile radios, and other<br />
equipment. Most funds are used to purchase vehicles, but acquisition of<br />
Purchase of new buses and rail<br />
transportation services under contract, lease or other arrangements and<br />
cars to replace existing vehicles<br />
state program administration may also be included. (The detailed list of<br />
or for minor expansions of the<br />
projects can be found in the lump sum back-up list.) <strong>2011</strong> $1,898,832 fleet<br />
Purchase/installation of 1,000 bicycle racks for short term bicycle parking<br />
within the SMAQMD. All racks will be available for public use. (This<br />
implements Measure A.7.2 in SACOG Bike/Ped Master Plan. 2012 $310,000 Bicycle and pedestrian facilities<br />
Specific activities which do not<br />
Construct a showcase and provide ongoing technical assistance and<br />
education to truckers on emerging transportation technology. Provide a<br />
revolving loan program to truckers to purchase EPA approved Smartway<br />
products; provide incentives to truckers to implement aftermarket<br />
technology on their trucks that would reduce vehicle emissions; and a<br />
monitoring program. CMAQ funds will be used for outreach and education,<br />
not for construction of the showcase, or for the revolving loan program.<br />
(Emissions: NOx .11, ROG .02 kg/day) <strong>2011</strong><br />
involve or lead directly to<br />
construction, such as: planning<br />
and technical studies, grants for<br />
training and research programs,<br />
planning activities conducted<br />
pursuant to titles 23 and 49<br />
U.S.c., and Federal-aid systems<br />
$1,900,372 revisions<br />
Grouped Projects for Safety<br />
Improvements - SHOPP Collision<br />
Reduction Program<br />
Grouped Projects for Safety<br />
Improvements - SHOPP Collision<br />
Reduction Program<br />
Grouped Projects for Safety<br />
Improvements - SHOPP Collision<br />
Reduction Program<br />
Grouped Projects for Purchase of new<br />
buses and rail cars to replace existing<br />
vehicles or for minor e<br />
Grouped Projects for Bicycle and<br />
pedestrian facilities<br />
Grouped Projects for Activities that do<br />
not lead to construction<br />
<strong>2011</strong> <strong>MTIP</strong> - Page 407 of 423<br />
Page 28 of 37