Final 2011/14 MTIP - sacog
Final 2011/14 MTIP - sacog
Final 2011/14 MTIP - sacog
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Appendix 10<br />
County Lead Agency Project ID<br />
Placer<br />
City of Roseville Dept of<br />
Public Works<br />
PLA15710<br />
Grouped Cat.<br />
ID Title Description<br />
I-80 Eureka Road On-Ramp<br />
Improvements<br />
In Roseville, Eureka Road at I-80: add 4th WB thru lane from 500' E of N.<br />
Sunrise to EB I-80 on-ramp, including Miners Ravine Bridge widening, and<br />
change existing #1 NB and SB thru lanes at Sunrise/Eureka to left turn<br />
lanes. HPP #2399 <strong>2011</strong> $9,600,000<br />
Completion<br />
Year Total Cost Exempt Cat. Grouped Cat.<br />
Placer<br />
City of Roseville Dept of<br />
Public Works PLA25385 VAR79030<br />
I-80 To Royer Park Bikeway<br />
Phase 2 - Segment 2<br />
Roseville, Harding Blvd @ Dry Creek, I-80 to Royer Park: Construct class 1<br />
bikeway in 2 phases. Phase 1 from I-80 to Harding Blvd completed in 2004<br />
(PLA20870) completed in 2004. Phase 2 construction is separated into 3<br />
segments: Segment 2 is located from East Street to Folsom Road.<br />
(Emission benefits in kg/day: 0.25 ROG, 0.2 NOx 0.09 PM10) <strong>2011</strong> $413,592 Bicycle and pedestrian facilities<br />
Grouped Projects for Bicycle and<br />
pedestrian facilities<br />
Placer<br />
Placer<br />
Placer<br />
Placer<br />
Placer<br />
Placer<br />
City of Roseville Dept of<br />
Public Works PLA25386 VAR79030<br />
City of Roseville Dept of<br />
Public Works<br />
PLA25438<br />
City of Roseville Dept of<br />
Public Works PLA25429 VAR79017<br />
I-80 To Royer Park Bikeway<br />
Phase 2 - Segment 3<br />
Industrial Ave. Bridge<br />
Replacement<br />
Industrial Ave. Rubberized<br />
Overlay<br />
Roseville, Harding Blvd @ Dry Creek, I-80 to Royer Park: Construct class 1<br />
bikeway in 2 phases. Phase 1 from I-80 to Harding Blvd completed in 2004<br />
(PLA20870). Phase 2 construction is separated into 3 segments: Segment<br />
3 is located from Folsom Road to Lincoln Street/Royer Park. (Emission<br />
benefits in kg/day: 0.25 ROG, 0.2 NOx 0.09 PM10) 2012 $938,108 Bicycle and pedestrian facilities<br />
In Roseville, on Industrial Ave. replace existing 2-lane Bridge #19C-0046<br />
over Pleasant Grove Creek with new 4-lane bridge. 2015 $5,000,000<br />
In Roseville, apply 2-inch gap graded rubberized Asphalt to Industrial Ave.<br />
Pavement resurfacing and/or<br />
from Washington Blvd. to Justice Center Dr. 20<strong>14</strong> $2,150,000 rehabilitation<br />
In Roseville, on Louis Blvd at Orlando Ave.: Develop and construct an<br />
improved transfer point and a 75-space park and ride facility. (Includes<br />
previously programmed PLA16080.) 20<strong>14</strong> $4,937,500<br />
City of Roseville Dept of<br />
Public Works<br />
REG17928<br />
Louis/Orlando Transfer Point<br />
Improvements<br />
City of Roseville Dept of<br />
Public Works PLA25377 Market Dr. City of Roseville; Extend from Baseline Road to Pleasant Grove. 2013 $8,500,000<br />
City of Roseville Dept of<br />
City of Roseville: Extend four lanes from Baseline Road to Blue Oaks<br />
Public Works PLA25378 N. Watt Avenue<br />
Avenue. 2015 $6,500,000<br />
Grouped Projects for Bicycle and<br />
pedestrian facilities<br />
Grouped Projects for Pavement<br />
resurfacing and/or rehabilitation<br />
Placer<br />
Placer<br />
Placer<br />
City of Roseville Dept of<br />
Public Works PLA25469 VAR79030<br />
City of Roseville Dept of<br />
Public Works<br />
PLA25470<br />
City of Roseville Dept of<br />
Public Works PLA25215 VAR79057<br />
Oak Street Extension of Miners<br />
Ravine Trail<br />
Oakridge Drive Bridge<br />
Replacement<br />
Operating Assistance JARC<br />
5316<br />
In Roseville, extend class 1 trail from Lincoln Street to Royer Park. Emission<br />
reduction benefits (kg/day): ROG 0.13, NOx 0.09, PM10 0.04 2013 $854,770 Bicycle and pedestrian facilities<br />
In Roseville, 0.2 miles north of Cirby Way on Oakridge Drive, replace<br />
existing, narrow, substandard bridge over Linda Creek with wider bridge to<br />
include bike lanes and sidewalks on both sides. 20<strong>14</strong> $2,500,000<br />
Decrease headways on weekday Roseville Transit Local Rte A from hourly<br />
to every half hour. The additional service will aid passengers taking transit<br />
to major employment centers and provide better conectivity to Sacramento<br />
Operating assistance to transit<br />
Regional Transit and Placer County Transit. <strong>2011</strong> $229,119 agencies<br />
Grouped Projects for Bicycle and<br />
pedestrian facilities<br />
Grouped Projects for Operating<br />
assistance to transit agencies<br />
Placer<br />
Placer<br />
Placer<br />
Placer<br />
Placer<br />
City of Roseville Dept of<br />
Public Works PLA25500 VAR79030<br />
Pedestrian Facilities<br />
Improvement Project<br />
In Roseville, construct sidewalks along various arterial and collector<br />
roadways. (Emission Benefits in kg/day: (0.45 ROG, 0.27 NOx, 0.05 PM10) 2012 $522,450 Bicycle and pedestrian facilities<br />
City of Roseville Dept of<br />
Pleasant Grove Blvd: Widen from 2 - 4 lanes from Fiddyment Rd to Watt<br />
Public Works PLA25379 Pleasant Grove Blvd<br />
Ave. 2015 $10,450,000<br />
City of Roseville Dept of<br />
Pleasant Grove Boulevard In Roseville, from Foothills Blvd to Wood Creek Oaks, widen Pleasant<br />
Public Works<br />
PLA15760<br />
Widening<br />
Grove Blvd from 4 to 6 lanes. 2015 $600,000<br />
City of Roseville Dept of<br />
Operating assistance to transit<br />
Public Works PLA25417 VAR79057 Preventive Maintenance Preventive Maintenance FFY 2009 thru 2013. 2013 $1,311,750 agencies<br />
City of Roseville Dept of<br />
Public Works PLA25404 VAR79055 Repower/Rehab Buses Repower/Rehab buses <strong>2011</strong> $1,215,000 Rehabilitation of transit vehicles<br />
Grouped Projects for Bicycle and<br />
pedestrian facilities<br />
Grouped Projects for Operating<br />
assistance to transit agencies<br />
Grouped Projects for Rehabilitation of<br />
transit vehicles<br />
Placer<br />
Placer<br />
Placer<br />
City of Roseville Dept of<br />
Public Works PLA25288 VAR79052 Roseville Fiber Optics Project<br />
In Roseville, install fiber optic Conduit, cable & pull-boxes along Cirby Wy,<br />
Rocky Ridge Dr, Old Auburn Rd, S Cirby wy, Rsvl Pkwy, Blue Oaks Blvd,<br />
Fiddyment Rd, Baseline Rd, Woodcreek Oaks Blvd, Junction Blvd &<br />
Foothills Blvd. Emission reduction benefits (kg/day): ROG 0.32, NOx 0.32 2012<br />
Traffic control devices and<br />
operating assistance other than<br />
$940,000 signalization projects<br />
Expand existing Vehicle Maintenance facility at City of Roseville<br />
Corporation Yard (2005 Hilltop Circle). Early funding will cover preliminary<br />
engineering/environmental studies for preferred sites. 2013 $2,710,000<br />
City of Roseville Dept of<br />
Public Works PLA19841 VAR79050<br />
Roseville Maintenance Facility<br />
Upgrades<br />
City of Roseville Dept of<br />
Public Works PLA15850 Roseville Road Widen Roseville Rd. from 2 to 4 lanes from City Limits to Cirby Wy. 20<strong>14</strong> $5,000,000<br />
Reconstruction or renovation of<br />
transit buildings and structures<br />
(e.g., rail or bus buildings, storage<br />
and maintenance facilities,<br />
stations, terminals, and ancillary<br />
structures)<br />
Grouped Projects for Construction or<br />
renovation of power, signal, and<br />
communications systems<br />
Grouped Projects for Reconstruction or<br />
renovation of transit buildings and<br />
structures<br />
Placer<br />
City of Roseville Dept of<br />
Public Works PLA25200 VAR79065<br />
Roseville Transfer Point & Bus<br />
Stop Improvement Project<br />
1. In Roseville, bus stop and pedestrian improvements along Riverside<br />
Avenue and completion of bike trail segment to Darling Way/Riverside<br />
Avenue;2. and, transfer point improvements at Sierra Gardens/Santa Clara<br />
Drive. LIMITS: 1. Riverside Avenue - Douglas to Darling (including ptn. of<br />
bike trail along Dry Creek);2. Sierra Gardens/Santa Clara. STREET NAME:<br />
Riverside AvenueIncludes bike lockers at various transfer points. <strong>2011</strong> $1,402,500 Bus terminals and transfer points<br />
Grouped Projects for Bus Terminals and<br />
Transfer Points<br />
<strong>2011</strong> <strong>MTIP</strong> - Page 387 of 423<br />
Page 8 of 37