Final 2011/14 MTIP - sacog
Final 2011/14 MTIP - sacog
Final 2011/14 MTIP - sacog
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Appendix 10<br />
County Lead Agency Project ID<br />
Yuba Caltrans District 3 CAL18782 VAR79005<br />
Grouped Cat.<br />
ID Title Description<br />
Marysville Operational<br />
Improvements<br />
Completion<br />
Year Total Cost Exempt Cat. Grouped Cat.<br />
Grouped Projects for Safety<br />
Improvements - SHOPP Mobility<br />
Program<br />
On SR 20 in Marysville, from I Street to F Street; also on SR 70, from 4th<br />
Street to 5th Street: Install left-turn pockets and modify signals. 2015 $5,631,000 Safety improvement program<br />
In Marysville on SR 70 from First St. undercrossing to east of Binney<br />
Yuba Caltrans District 3 CAL20441 VAR79007 Marysville Roadway Rehab<br />
Junction and on SR 20 from Feather River Bridge #18-9 to 0.1 mile east of<br />
Levee Rd. - Roadway rehab (Yub-70 PM <strong>14</strong>.1/15.4 and Yub-20 PM 0.5/3.5 20<strong>14</strong><br />
Pavement resurfacing and/or<br />
$43,350,000 rehabilitation<br />
Specific activities which do not<br />
involve or lead directly to<br />
construction, such as: planning<br />
and technical studies, grants for<br />
training and research programs,<br />
planning activities conducted<br />
pursuant to titles 23 and 49<br />
U.S.c., and Federal-aid systems<br />
Yuba Caltrans District 3 CAL20443 VAR79046 SR 65 Corridor Master Plan SR 65, from I-80 to SR 70. Develop Aesthetic Corridor Master Plan. 2012 $195,001 revisions<br />
From 3 mi north of Wheatland to 0.9 mi south of Jct SR 70: Perform<br />
Pavement resurfacing and/or<br />
Yuba Caltrans District 3 CAL20390 VAR79017 SR 65 Maintenance<br />
highway maintenance. 2012 $3,803,000 rehabilitation<br />
Near Marysville, from 0.1 mile east of Levee Road to 0.1 mile west of Loma<br />
Rica Road - Pavement rehabilitation (PM R3.5/8.0) [CTIPS ID 107-0000-<br />
Pavement resurfacing and/or<br />
Yuba Caltrans District 3 CAL20445 VAR79006 Yub-20 Pavement Rehab 0848]. 2013 $5,993,000 rehabilitation<br />
Yuba Caltrans District 3 CAL20408 VAR79001 Yub-65 Scour Structure Rehab<br />
Yuba Caltrans District 3 CAL18835 VAR79001 Yub-70 E Street Bridge Rehab<br />
Yuba Caltrans District 3 CAL20382 VAR79002 Yub-70 Install Guardrail<br />
Widening narrow pavements or<br />
Near Wheatland, at Dry Creek Bridge #16-0002 - Bridge scour mitigation<br />
(PM 2.2) [CTIPS ID 107-0000-0806] 2015<br />
reconstructing bridges (no<br />
$3,976,000 additional travel lanes)<br />
Yuba County, in Marysville, at Yuba River Bridge Overhead #16-34 -<br />
Rehabilitate bridge deck (PM 15.4/25.8) 2013<br />
Pavement resurfacing and/or<br />
$3,634,000 rehabilitation<br />
Near Marysville, from the Yuba River Bridge to State Route 65 - Install<br />
guardrail and thin trees (PM R8.4/13.5) [SHOPP Lump Sum - Collision<br />
Reduction] 2012 $1,466,000 Safety improvement program<br />
In Yuba County south of Marysville from McGowan Road OC to Yuba River<br />
BOH - Roadway rehabilitation (PM R7.0/13.6) [SHOPP Roadway<br />
Preservation - Roadway Rehab] 2013<br />
Pavement resurfacing and/or<br />
$18,062,000 rehabilitation<br />
Grouped Projects for Pavement<br />
resurfacing and/or rehabilitation -<br />
SHOPP Roadway Preservation<br />
Program<br />
Grouped Projects for Activities that do<br />
not lead to construction<br />
Grouped Projects for Pavement<br />
resurfacing and/or rehabilitation<br />
Grouped Projects for Shoulder<br />
Improvements - SHOPP Roadside<br />
Preservation Program<br />
Grouped Projects for Bridge<br />
Rehabilitation and Reconstruction -<br />
SHOPP Program<br />
Grouped Projects for Bridge<br />
Rehabilitation and Reconstruction -<br />
SHOPP Program<br />
Grouped Projects for Safety<br />
Improvements - SHOPP Collision<br />
Reduction Program<br />
Grouped Projects for Pavement<br />
resurfacing and/or rehabilitation -<br />
SHOPP Roadway Preservation<br />
Program<br />
Yuba Caltrans District 3 CAL204<strong>14</strong> VAR79007 Yub-70 Roadway Rehab<br />
Specific activities which do not<br />
involve or lead directly to<br />
construction, such as: planning<br />
and technical studies, grants for<br />
training and research programs,<br />
planning activities conducted<br />
pursuant to titles 23 and 49<br />
U.S.c., and Federal-aid systems Grouped Projects for Activities that do<br />
Yuba City of Wheatland YUB15857 VAR79046 Bicycle Master Plan Develop citywide bike system with new development standards. 2012 $31,588 revisions<br />
not lead to construction<br />
Pavement resurfacing and/or Grouped Projects for Pavement<br />
Yuba City of Wheatland YUB15991 VAR79017 Wheatland Road Wheatland Road, from E Street to G Street: Rehabilitate roadway. <strong>2011</strong> $57,608 rehabilitation<br />
resurfacing and/or rehabilitation<br />
Specific activities which do not<br />
involve or lead directly to<br />
construction, such as: planning<br />
and technical studies, grants for<br />
training and research programs,<br />
planning activities conducted<br />
pursuant to titles 23 and 49<br />
U.S.c., and Federal-aid systems Grouped Projects for Activities that do<br />
Yuba SACOG YUB15630 VAR79046 Yuba County PPM Plan, program and monitor for Yuba County. 2015 $250,000 revisions<br />
not lead to construction<br />
Yuba<br />
Yuba<br />
Yuba<br />
Yuba County Dept of<br />
Public Works<br />
YUB15993<br />
Yuba County Dept of<br />
Public Works YUB15852 VAR79017<br />
Alleghany Rd Bridge<br />
Replacement<br />
Beale AFB Access (Smartville<br />
Road)<br />
In Yuba County: Alleghany Rd, over Oregon Creek, 0.1 mile east of SR 49.<br />
Replace the existing one lane historic bridge with a new two lane bridge<br />
while preserving the existing structure. (Toll Credits for PE & CON) 2015 $2,0<strong>14</strong>,000<br />
Smartville Rd, SR 20 to Beale Air Force Base: Rehabilitate roadway and<br />
Pavement resurfacing and/or<br />
improve alignment. HPP #3139 <strong>2011</strong> $3,750,000 rehabilitation<br />
Specific activities which do not<br />
involve or lead directly to<br />
construction, such as: planning<br />
and technical studies, grants for<br />
training and research programs,<br />
planning activities conducted<br />
pursuant to titles 23 and 49<br />
U.S.c., and Federal-aid systems<br />
revisions<br />
Yuba County Dept of<br />
Public Works YUB16007 VAR79046 Bicycle Master Plan Update 1995 countywide Bikeway Master Plan. <strong>2011</strong> $95,580<br />
Grouped Projects for Pavement<br />
resurfacing and/or rehabilitation<br />
Grouped Projects for Activities that do<br />
not lead to construction<br />
<strong>2011</strong> <strong>MTIP</strong> - Page 4<strong>14</strong> of 423<br />
Page 35 of 37