19.06.2014 Views

Final 2011/14 MTIP - sacog

Final 2011/14 MTIP - sacog

Final 2011/14 MTIP - sacog

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Appendix 10<br />

County Lead Agency Project ID<br />

Yuba Caltrans District 3 CAL18782 VAR79005<br />

Grouped Cat.<br />

ID Title Description<br />

Marysville Operational<br />

Improvements<br />

Completion<br />

Year Total Cost Exempt Cat. Grouped Cat.<br />

Grouped Projects for Safety<br />

Improvements - SHOPP Mobility<br />

Program<br />

On SR 20 in Marysville, from I Street to F Street; also on SR 70, from 4th<br />

Street to 5th Street: Install left-turn pockets and modify signals. 2015 $5,631,000 Safety improvement program<br />

In Marysville on SR 70 from First St. undercrossing to east of Binney<br />

Yuba Caltrans District 3 CAL20441 VAR79007 Marysville Roadway Rehab<br />

Junction and on SR 20 from Feather River Bridge #18-9 to 0.1 mile east of<br />

Levee Rd. - Roadway rehab (Yub-70 PM <strong>14</strong>.1/15.4 and Yub-20 PM 0.5/3.5 20<strong>14</strong><br />

Pavement resurfacing and/or<br />

$43,350,000 rehabilitation<br />

Specific activities which do not<br />

involve or lead directly to<br />

construction, such as: planning<br />

and technical studies, grants for<br />

training and research programs,<br />

planning activities conducted<br />

pursuant to titles 23 and 49<br />

U.S.c., and Federal-aid systems<br />

Yuba Caltrans District 3 CAL20443 VAR79046 SR 65 Corridor Master Plan SR 65, from I-80 to SR 70. Develop Aesthetic Corridor Master Plan. 2012 $195,001 revisions<br />

From 3 mi north of Wheatland to 0.9 mi south of Jct SR 70: Perform<br />

Pavement resurfacing and/or<br />

Yuba Caltrans District 3 CAL20390 VAR79017 SR 65 Maintenance<br />

highway maintenance. 2012 $3,803,000 rehabilitation<br />

Near Marysville, from 0.1 mile east of Levee Road to 0.1 mile west of Loma<br />

Rica Road - Pavement rehabilitation (PM R3.5/8.0) [CTIPS ID 107-0000-<br />

Pavement resurfacing and/or<br />

Yuba Caltrans District 3 CAL20445 VAR79006 Yub-20 Pavement Rehab 0848]. 2013 $5,993,000 rehabilitation<br />

Yuba Caltrans District 3 CAL20408 VAR79001 Yub-65 Scour Structure Rehab<br />

Yuba Caltrans District 3 CAL18835 VAR79001 Yub-70 E Street Bridge Rehab<br />

Yuba Caltrans District 3 CAL20382 VAR79002 Yub-70 Install Guardrail<br />

Widening narrow pavements or<br />

Near Wheatland, at Dry Creek Bridge #16-0002 - Bridge scour mitigation<br />

(PM 2.2) [CTIPS ID 107-0000-0806] 2015<br />

reconstructing bridges (no<br />

$3,976,000 additional travel lanes)<br />

Yuba County, in Marysville, at Yuba River Bridge Overhead #16-34 -<br />

Rehabilitate bridge deck (PM 15.4/25.8) 2013<br />

Pavement resurfacing and/or<br />

$3,634,000 rehabilitation<br />

Near Marysville, from the Yuba River Bridge to State Route 65 - Install<br />

guardrail and thin trees (PM R8.4/13.5) [SHOPP Lump Sum - Collision<br />

Reduction] 2012 $1,466,000 Safety improvement program<br />

In Yuba County south of Marysville from McGowan Road OC to Yuba River<br />

BOH - Roadway rehabilitation (PM R7.0/13.6) [SHOPP Roadway<br />

Preservation - Roadway Rehab] 2013<br />

Pavement resurfacing and/or<br />

$18,062,000 rehabilitation<br />

Grouped Projects for Pavement<br />

resurfacing and/or rehabilitation -<br />

SHOPP Roadway Preservation<br />

Program<br />

Grouped Projects for Activities that do<br />

not lead to construction<br />

Grouped Projects for Pavement<br />

resurfacing and/or rehabilitation<br />

Grouped Projects for Shoulder<br />

Improvements - SHOPP Roadside<br />

Preservation Program<br />

Grouped Projects for Bridge<br />

Rehabilitation and Reconstruction -<br />

SHOPP Program<br />

Grouped Projects for Bridge<br />

Rehabilitation and Reconstruction -<br />

SHOPP Program<br />

Grouped Projects for Safety<br />

Improvements - SHOPP Collision<br />

Reduction Program<br />

Grouped Projects for Pavement<br />

resurfacing and/or rehabilitation -<br />

SHOPP Roadway Preservation<br />

Program<br />

Yuba Caltrans District 3 CAL204<strong>14</strong> VAR79007 Yub-70 Roadway Rehab<br />

Specific activities which do not<br />

involve or lead directly to<br />

construction, such as: planning<br />

and technical studies, grants for<br />

training and research programs,<br />

planning activities conducted<br />

pursuant to titles 23 and 49<br />

U.S.c., and Federal-aid systems Grouped Projects for Activities that do<br />

Yuba City of Wheatland YUB15857 VAR79046 Bicycle Master Plan Develop citywide bike system with new development standards. 2012 $31,588 revisions<br />

not lead to construction<br />

Pavement resurfacing and/or Grouped Projects for Pavement<br />

Yuba City of Wheatland YUB15991 VAR79017 Wheatland Road Wheatland Road, from E Street to G Street: Rehabilitate roadway. <strong>2011</strong> $57,608 rehabilitation<br />

resurfacing and/or rehabilitation<br />

Specific activities which do not<br />

involve or lead directly to<br />

construction, such as: planning<br />

and technical studies, grants for<br />

training and research programs,<br />

planning activities conducted<br />

pursuant to titles 23 and 49<br />

U.S.c., and Federal-aid systems Grouped Projects for Activities that do<br />

Yuba SACOG YUB15630 VAR79046 Yuba County PPM Plan, program and monitor for Yuba County. 2015 $250,000 revisions<br />

not lead to construction<br />

Yuba<br />

Yuba<br />

Yuba<br />

Yuba County Dept of<br />

Public Works<br />

YUB15993<br />

Yuba County Dept of<br />

Public Works YUB15852 VAR79017<br />

Alleghany Rd Bridge<br />

Replacement<br />

Beale AFB Access (Smartville<br />

Road)<br />

In Yuba County: Alleghany Rd, over Oregon Creek, 0.1 mile east of SR 49.<br />

Replace the existing one lane historic bridge with a new two lane bridge<br />

while preserving the existing structure. (Toll Credits for PE & CON) 2015 $2,0<strong>14</strong>,000<br />

Smartville Rd, SR 20 to Beale Air Force Base: Rehabilitate roadway and<br />

Pavement resurfacing and/or<br />

improve alignment. HPP #3139 <strong>2011</strong> $3,750,000 rehabilitation<br />

Specific activities which do not<br />

involve or lead directly to<br />

construction, such as: planning<br />

and technical studies, grants for<br />

training and research programs,<br />

planning activities conducted<br />

pursuant to titles 23 and 49<br />

U.S.c., and Federal-aid systems<br />

revisions<br />

Yuba County Dept of<br />

Public Works YUB16007 VAR79046 Bicycle Master Plan Update 1995 countywide Bikeway Master Plan. <strong>2011</strong> $95,580<br />

Grouped Projects for Pavement<br />

resurfacing and/or rehabilitation<br />

Grouped Projects for Activities that do<br />

not lead to construction<br />

<strong>2011</strong> <strong>MTIP</strong> - Page 4<strong>14</strong> of 423<br />

Page 35 of 37

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!