Appendix 5 - Completed, Deleted, and Delayed Projects<br />
Completed Projects from the Previous 2009/12 <strong>MTIP</strong><br />
County Lead Agency Project ID Title Description Completion Year Total Cost<br />
Sutter Caltrans District 3 CAL20384 Sut-99 Native Landscaping<br />
Sutter City of Live Oak SUT18832 Apricot Street Rehab<br />
Sutter<br />
Sutter<br />
Sutter<br />
Sutter<br />
Sutter<br />
City of Yuba City Dept of<br />
Public Works SUT10794 Bridge Street Reconstruction<br />
City of Yuba City Dept of<br />
Public Works SUT18833 Road Rehab Stimulus<br />
Sutter County Dept of<br />
Garmire Rd. Bridge<br />
Public Works<br />
SUT17030 Replacement<br />
Sutter County Dept of<br />
Public Works SUT18836 Road Rehab - Stimulus<br />
Sutter County Dept of<br />
Public Works SUT18834 Road Rehab Stimulus<br />
Various Caltrans District 3 CAL20418<br />
I-80 & U.S. 50 Upgrades to<br />
Weigh Stations<br />
Various Caltrans District 3 CAL18787 Metal Beam Barrier<br />
Various Caltrans District 3 CAL18736 Metal Beam Guard Rail<br />
Various Caltrans District 3 CAL18777 TMS Installation<br />
Two- & Three-Lane Safety<br />
Various Caltrans District 3 CAL20386 Monitoring/Various Locations<br />
Various Counties - Metal Beam<br />
Various Caltrans District 3 CAL18779 Guardrail<br />
Various<br />
Sac. Metro Air Quality<br />
Management District<br />
VAR56005<br />
State Implementation Plan<br />
(SIP) Development Program<br />
On SR 99 in Sutter County, from Sankey Road to the 70/99 split - plant<br />
native trees and shrubs. 2010 $1,000,000<br />
Apricot Street, from N Street to Broadway/Larkin Rd.: Rehabilitate<br />
roadway. ($120,000 ARRA STIP) 2009 $205,639<br />
In Yuba City, from Plumas to Shasta, construct signal-phasing<br />
modifications, street reconstruction, pedestrian-scale street lighting,<br />
sidewalks and new pedestrian crossings as part of the city's downtown<br />
revitalization strategy. 2010 $2,873,213<br />
Yuba City, Live Oak Blvd. from SR 20 to Pease Rd., Garden Highway from<br />
Franklin Rd. to Winship Rd: Rehabilitate roadways, including rehabilitation<br />
of bike lanes and ADA-accessible sidewalk improvements. 2010 $753,627<br />
Garmire Rd, over Tisdale Bypass, 0.4 mi NW of Tisdale Rd.: Replace onelane<br />
bridge with 2-lane bridge. 2008 $9,527,000<br />
Road Rehabilitation - Acacia Ave (South Butte Rd - Butte House Rd),<br />
Nicolaus Ave (SR99 - SR70), Pleasant Grove Rd (Betz Rd to Cornelius<br />
Ave) 2010 $1,216,408<br />
In Sutter County, rehabilitate the following: Marcum Rd from Pleasant<br />
Grove Rd to Placer County line (1.0 mile), Acacia Ave from State Route 20<br />
to South Butte Rd (1.08 mile), El Margarita Ave from Franklin Blvd to Yuba<br />
City limits (0.25 mile), George Washington Blvd from Franklin Blvd to Yuba<br />
City limits (0.26 mile), Nicholaus Ave from SR 70 to Pacific Ave, Pacific<br />
Ave from Cornelius Ave to Nicholaus Ave (this segment to be funded with<br />
local funds). 2010 $1,054,864<br />
In Sacramento County on Route 80 near Antelope, at the east and<br />
westbound Antelope Weigh Stations; also in El Dorado County on Route<br />
50 at westbound Camino Weigh Station - Install CCTV and CMS [SHOPP -<br />
Mobility] [CTIPS ID 107-0000-0792] 2010 $626,000<br />
In and near Sacramento, from Yolo County Line to west of Watt Ave.:<br />
Upgrade metal beam barrier;Project limits include four locations: YOL-80-<br />
PM-9.07/R9.50; YOL-50-PM-0.0/3.17; SAC-50-PM-L0.0/L2.48; SAC-50-<br />
PM-R0.0/R5.37 2010 $44,581,857<br />
In Sacramento, Placer, Yuba, and Yolo Counties - on various routes -<br />
upgrade metal beam guard rail end treatments LIMITS: Various Counties<br />
and Various State Routes STREET NAME: Various 2008 $3,336,000<br />
In Sacramento, El Dorado, Yolo and Placer Counties, at various locations:<br />
Install Transportation Management System (TMS) Units for monitoring<br />
congestion and delay. 2010 $3,246,921<br />
In Sacramento, Yuba, Glenn and Butte Counties at various locations -<br />
install ground-in rumble strips (SHOPP - Collision Reduction). 2010 $1,122,000<br />
In Yolo, Colusa and Glenn Counties, at various locations on Routes 5 and<br />
505 - Upgrade metal beam guardrail end treatments. 2010 $3,824,000<br />
The SIP Development Program will allow the region to develop a<br />
comprehensive air quality plan for meeting the 8-hour national ambient air<br />
quality standard (NAAQS) by June 15, 2013. 2009 $705,975<br />
<strong>2011</strong> <strong>MTIP</strong> - Page 338 of 423<br />
Completed Projects: Page 15 of 39