Appendix 10<br />
County Lead Agency Project ID<br />
Grouped Cat.<br />
ID Title Description<br />
Completion<br />
Year Total Cost Exempt Cat. Grouped Cat.<br />
Sacramento City of Elk Grove SAC24116 Elk Grove Blvd / SR 99<br />
In Elk Grove, at SR 99 and Elk Grove Blvd: Add northbound loop on-ramp<br />
to SR 99, remove traffic signal at existing northbound on-ramp, and add<br />
second westbound left turn lane to existing southbound on-ramp. 2013 $3,463,000<br />
Elk Grove Creek/SR 99 Trail<br />
Extend the existing Class I bikeway from Laguna Springs Dr cross over W.<br />
Stockton Blvd/SR-99 and E Stockton Blvd and connect to Emerald Park<br />
Drive. Project includes a bike/pedestrian overcrossing at State Route 99.<br />
Sacramento City of Elk Grove SAC24130 VAR79030 Crossing and Pedestrian Bridge (VOC .66, NOx .17 kg/day). 2012 $6,542,344 Bicycle and pedestrian facilities<br />
FFY 2008-2010 5307<br />
2008 preventive Mte = $450,000 ADA Operations = $125,000 2009<br />
Preventive Maintenance, ADA preventive Mte = $807,435 ADA Operations = $51,565 2010 preventive Mte<br />
Operating assistance to transit<br />
Sacramento City of Elk Grove SAC24060 VAR79057 Operations<br />
= $450,000 ADA Operations = $125,000 <strong>2011</strong> $2,909,134 agencies<br />
Sacramento City of Elk Grove SAC24598 VAR79057<br />
FFY <strong>2011</strong> to FFY 20<strong>14</strong><br />
Preventive Maintenance and<br />
ADA Operations<br />
Sacramento City of Elk Grove SAC24118 Grant Line Road Widening<br />
Sacramento City of Elk Grove SAC20510 Grantline Road<br />
Sacramento City of Elk Grove SAC24477 VAR79052<br />
Intelligent Transportation<br />
System<br />
FFY <strong>2011</strong> Preventive Maintenance $450,000; ADA Operations<br />
$125,000.FFY 2012 Preventive Maintenance $450,000; ADA Operations<br />
$125,000.FFY 2013 Preventive Maintenance $450,000; ADA Operations<br />
$125,000.FFY 20<strong>14</strong> Preventive Maintenance $450,000; ADA Operations<br />
$125,000. 2015<br />
Operating assistance to transit<br />
$2,875,000 agencies<br />
In Elk Grove, from East Stockton Blvd to Waterman Road: Widen Grant<br />
Line Road from 2 to 4 lanes, including grade separation over the UP<br />
Railroad Tracks. 2012 $35,437,000<br />
In Sacramento County, Grantline Road from Bond Road to Calvine Road:<br />
Widen existing roadway from 2 to 4 lanes. 2025 $25,000,000<br />
Construction or renovation of<br />
Fiber optic system, cameras, traffic signal coordination, traffic signal lighting<br />
power, signal, and<br />
improvements, and related ITS hardware/software upgrades. 20<strong>14</strong> $4,000,000 communications systems<br />
Grouped Projects for Bicycle and<br />
pedestrian facilities<br />
Grouped Projects for Operating<br />
assistance to transit agencies<br />
Grouped Projects for Operating<br />
assistance to transit agencies<br />
Grouped Projects for Construction or<br />
renovation of power, signal, and<br />
communications systems<br />
Sacramento City of Elk Grove SAC24094 Kammerer Rd. Extension<br />
Sacramento City of Elk Grove SAC24093 Kammerer Road<br />
Sacramento City of Elk Grove SAC24365 VAR79058<br />
Sacramento City of Elk Grove SAC24418 VAR79058<br />
Replace Neighborhood<br />
Ride/Paratransit Buses<br />
Six Replacement Buses for E-<br />
Tran<br />
Construct new 4 lane Kammerer Rd. extension from Bruceville Road to I-5<br />
(at Hood Franklin Rd.), modifying the I-5/Hood Franklin interchange, and<br />
construction of a railroad overcrossing at UP railroad tracks. 2016 $37,581,000<br />
Widen/construct from 4 to 6 lanes Kammerer Road from approximately<br />
6,000' west of SR99 to Bruceville Road. 2016 $7,400,000<br />
Purchase of new buses and rail<br />
cars to replace existing vehicles<br />
Replace 3 diesel cutaways that are used for neighborhood ride routes and<br />
or for minor expansions of the<br />
paratransit service. 2012 $255,000 fleet<br />
Purchase of new buses and rail<br />
Purchase six CNG replacement buses for the City of Elk Grove's E-Tran<br />
bus transit buses. The CNG buses replace six CNG and diesel buses that<br />
are beyond their useful life. 2012<br />
cars to replace existing vehicles<br />
or for minor expansions of the<br />
$1,487,000 fleet<br />
Grouped Projects for Purchase of new<br />
buses and rail cars to replace existing<br />
vehicles or for minor e<br />
Grouped Projects for Purchase of new<br />
buses and rail cars to replace existing<br />
vehicles or for minor e<br />
Sacramento<br />
City of Folsom Dept of<br />
Public Works SAC24415 VAR79030<br />
Bikestation and Long Term Bike<br />
Parking<br />
To retrofit and install on-demand long-term bike parking at Folsom Light<br />
Rail stations and new parking garage. (Emission Benefits: 0.1 kg/day ROG) <strong>2011</strong> $178,471 Bicycle and pedestrian facilities<br />
Grouped Projects for Bicycle and<br />
pedestrian facilities<br />
Sacramento<br />
Sacramento<br />
Sacramento<br />
City of Folsom Dept of<br />
Public Works SAC24320 VAR79017<br />
Citywide Pavement Repair &<br />
ADA Improvements<br />
City of Folsom Dept of<br />
Public Works SAC18400 East Bidwell Street<br />
City of Folsom Dept of<br />
Public Works SAC24400 VAR79030<br />
Folsom Blvd. Bike/Ped<br />
Overcrossing<br />
In Folsom, rehabilitate the following roads:-Blue Ravine Rd. from Prairie<br />
City Rd. to Folsom Blvd.-East Bidwell St. from Blue Ravine Rd. to Creekside<br />
Dr.-East Natoma St. from Gionata Wy. to Blue Ravine Rd.-Folsom Blvd.<br />
from Natoma St. to U.S. 50-Natoma St. from Folsom Blvd. to Prison Rd.-<br />
Oak Ave. Pkwy from Santa Juanita Ave to American River Canyon-Prairie<br />
City Rd. from Blue Ravine Rd. to U.S. 50-Sibley St. from Lembi Dr. to Blue<br />
Ravine Rd.In addition to the pavement and ADA work on the above<br />
roadways, the City of Folsom will also perform standalone ADA work at<br />
various other locations throughout the city. 2012<br />
Pavement resurfacing and/or<br />
$2,002,786 rehabilitation<br />
In Folsom, East Bidwell Street from Oak Avenue Parkway to Blue Ravine<br />
Road: widen to six lanes. 2013 $1,500,000<br />
In Folsom, at Folsom Blvd. and Humbug-Willow Creek Parkway, construct a<br />
bicycle and pedestrian overcrossing of Folsom Blvd. Includes connections<br />
to existing trails on both sides of Folsom Blvd. 20<strong>14</strong> $2,500,000 Bicycle and pedestrian facilities<br />
Grouped Projects for Pavement<br />
resurfacing and/or rehabilitation<br />
Grouped Projects for Bicycle and<br />
pedestrian facilities<br />
Sacramento<br />
City of Folsom Dept of<br />
Public Works SAC24465 VAR79060<br />
Folsom Boulevard/Blue Ravine<br />
Intersection Improvements<br />
Intersection improvements at Folsom Boulevard/Blue Ravine Road,<br />
Intersection channelization<br />
including additional storage and turn pockets. <strong>2011</strong> $1,493,351 projects<br />
Grouped Projects for Intersection<br />
Channelization<br />
Sacramento<br />
Sacramento<br />
City of Folsom Dept of<br />
Public Works SAC24399 VAR79030<br />
Folsom Lake Bicycle/Pedestrian<br />
Trail & Overcrossing<br />
City of Folsom Dept of<br />
Public Works SAC24324 VAR79030 Folsom Lake Trail<br />
In Folsom, along the Folsom Lake Trail corridor from the historic truss<br />
bridge to Green Valley Road: construct class I bike trail. Project includes<br />
the construction of approximately 4 miles of Class I Bike Trail, including a<br />
bike/pedestrian overcrossing at Folsom Dam Road. (Other State funds are<br />
State EEM Grant funds.) (Emission Benefits: 0.1 kg/day ROG) 2012 $1,703,500 Bicycle and pedestrian facilities<br />
In Folsom, along the Folsom Lake Trail corridor from the Folsom Lake<br />
Crossing Bike/Pedestrian overcrossing to Green Valley Road, construct<br />
approx 2-miles of class 1 bike trail. 2012 $2,500,000 Bicycle and pedestrian facilities<br />
Grouped Projects for Bicycle and<br />
pedestrian facilities<br />
Grouped Projects for Bicycle and<br />
pedestrian facilities<br />
<strong>2011</strong> <strong>MTIP</strong> - Page 393 of 423<br />
Page <strong>14</strong> of 37