Appendix 10<br />

County Lead Agency Project ID<br />

Grouped Cat.<br />

ID Title Description<br />

Completion<br />

Year Total Cost Exempt Cat. Grouped Cat.<br />

Sacramento City of Elk Grove SAC24116 Elk Grove Blvd / SR 99<br />

In Elk Grove, at SR 99 and Elk Grove Blvd: Add northbound loop on-ramp<br />

to SR 99, remove traffic signal at existing northbound on-ramp, and add<br />

second westbound left turn lane to existing southbound on-ramp. 2013 $3,463,000<br />

Elk Grove Creek/SR 99 Trail<br />

Extend the existing Class I bikeway from Laguna Springs Dr cross over W.<br />

Stockton Blvd/SR-99 and E Stockton Blvd and connect to Emerald Park<br />

Drive. Project includes a bike/pedestrian overcrossing at State Route 99.<br />

Sacramento City of Elk Grove SAC24130 VAR79030 Crossing and Pedestrian Bridge (VOC .66, NOx .17 kg/day). 2012 $6,542,344 Bicycle and pedestrian facilities<br />

FFY 2008-2010 5307<br />

2008 preventive Mte = $450,000 ADA Operations = $125,000 2009<br />

Preventive Maintenance, ADA preventive Mte = $807,435 ADA Operations = $51,565 2010 preventive Mte<br />

Operating assistance to transit<br />

Sacramento City of Elk Grove SAC24060 VAR79057 Operations<br />

= $450,000 ADA Operations = $125,000 <strong>2011</strong> $2,909,134 agencies<br />

Sacramento City of Elk Grove SAC24598 VAR79057<br />

FFY <strong>2011</strong> to FFY 20<strong>14</strong><br />

Preventive Maintenance and<br />

ADA Operations<br />

Sacramento City of Elk Grove SAC24118 Grant Line Road Widening<br />

Sacramento City of Elk Grove SAC20510 Grantline Road<br />

Sacramento City of Elk Grove SAC24477 VAR79052<br />

Intelligent Transportation<br />

System<br />

FFY <strong>2011</strong> Preventive Maintenance $450,000; ADA Operations<br />

$125,000.FFY 2012 Preventive Maintenance $450,000; ADA Operations<br />

$125,000.FFY 2013 Preventive Maintenance $450,000; ADA Operations<br />

$125,000.FFY 20<strong>14</strong> Preventive Maintenance $450,000; ADA Operations<br />

$125,000. 2015<br />

Operating assistance to transit<br />

$2,875,000 agencies<br />

In Elk Grove, from East Stockton Blvd to Waterman Road: Widen Grant<br />

Line Road from 2 to 4 lanes, including grade separation over the UP<br />

Railroad Tracks. 2012 $35,437,000<br />

In Sacramento County, Grantline Road from Bond Road to Calvine Road:<br />

Widen existing roadway from 2 to 4 lanes. 2025 $25,000,000<br />

Construction or renovation of<br />

Fiber optic system, cameras, traffic signal coordination, traffic signal lighting<br />

power, signal, and<br />

improvements, and related ITS hardware/software upgrades. 20<strong>14</strong> $4,000,000 communications systems<br />

Grouped Projects for Bicycle and<br />

pedestrian facilities<br />

Grouped Projects for Operating<br />

assistance to transit agencies<br />

Grouped Projects for Operating<br />

assistance to transit agencies<br />

Grouped Projects for Construction or<br />

renovation of power, signal, and<br />

communications systems<br />

Sacramento City of Elk Grove SAC24094 Kammerer Rd. Extension<br />

Sacramento City of Elk Grove SAC24093 Kammerer Road<br />

Sacramento City of Elk Grove SAC24365 VAR79058<br />

Sacramento City of Elk Grove SAC24418 VAR79058<br />

Replace Neighborhood<br />

Ride/Paratransit Buses<br />

Six Replacement Buses for E-<br />

Tran<br />

Construct new 4 lane Kammerer Rd. extension from Bruceville Road to I-5<br />

(at Hood Franklin Rd.), modifying the I-5/Hood Franklin interchange, and<br />

construction of a railroad overcrossing at UP railroad tracks. 2016 $37,581,000<br />

Widen/construct from 4 to 6 lanes Kammerer Road from approximately<br />

6,000' west of SR99 to Bruceville Road. 2016 $7,400,000<br />

Purchase of new buses and rail<br />

cars to replace existing vehicles<br />

Replace 3 diesel cutaways that are used for neighborhood ride routes and<br />

or for minor expansions of the<br />

paratransit service. 2012 $255,000 fleet<br />

Purchase of new buses and rail<br />

Purchase six CNG replacement buses for the City of Elk Grove's E-Tran<br />

bus transit buses. The CNG buses replace six CNG and diesel buses that<br />

are beyond their useful life. 2012<br />

cars to replace existing vehicles<br />

or for minor expansions of the<br />

$1,487,000 fleet<br />

Grouped Projects for Purchase of new<br />

buses and rail cars to replace existing<br />

vehicles or for minor e<br />

Grouped Projects for Purchase of new<br />

buses and rail cars to replace existing<br />

vehicles or for minor e<br />

Sacramento<br />

City of Folsom Dept of<br />

Public Works SAC24415 VAR79030<br />

Bikestation and Long Term Bike<br />

Parking<br />

To retrofit and install on-demand long-term bike parking at Folsom Light<br />

Rail stations and new parking garage. (Emission Benefits: 0.1 kg/day ROG) <strong>2011</strong> $178,471 Bicycle and pedestrian facilities<br />

Grouped Projects for Bicycle and<br />

pedestrian facilities<br />

Sacramento<br />

Sacramento<br />

Sacramento<br />

City of Folsom Dept of<br />

Public Works SAC24320 VAR79017<br />

Citywide Pavement Repair &<br />

ADA Improvements<br />

City of Folsom Dept of<br />

Public Works SAC18400 East Bidwell Street<br />

City of Folsom Dept of<br />

Public Works SAC24400 VAR79030<br />

Folsom Blvd. Bike/Ped<br />

Overcrossing<br />

In Folsom, rehabilitate the following roads:-Blue Ravine Rd. from Prairie<br />

City Rd. to Folsom Blvd.-East Bidwell St. from Blue Ravine Rd. to Creekside<br />

Dr.-East Natoma St. from Gionata Wy. to Blue Ravine Rd.-Folsom Blvd.<br />

from Natoma St. to U.S. 50-Natoma St. from Folsom Blvd. to Prison Rd.-<br />

Oak Ave. Pkwy from Santa Juanita Ave to American River Canyon-Prairie<br />

City Rd. from Blue Ravine Rd. to U.S. 50-Sibley St. from Lembi Dr. to Blue<br />

Ravine Rd.In addition to the pavement and ADA work on the above<br />

roadways, the City of Folsom will also perform standalone ADA work at<br />

various other locations throughout the city. 2012<br />

Pavement resurfacing and/or<br />

$2,002,786 rehabilitation<br />

In Folsom, East Bidwell Street from Oak Avenue Parkway to Blue Ravine<br />

Road: widen to six lanes. 2013 $1,500,000<br />

In Folsom, at Folsom Blvd. and Humbug-Willow Creek Parkway, construct a<br />

bicycle and pedestrian overcrossing of Folsom Blvd. Includes connections<br />

to existing trails on both sides of Folsom Blvd. 20<strong>14</strong> $2,500,000 Bicycle and pedestrian facilities<br />

Grouped Projects for Pavement<br />

resurfacing and/or rehabilitation<br />

Grouped Projects for Bicycle and<br />

pedestrian facilities<br />

Sacramento<br />

City of Folsom Dept of<br />

Public Works SAC24465 VAR79060<br />

Folsom Boulevard/Blue Ravine<br />

Intersection Improvements<br />

Intersection improvements at Folsom Boulevard/Blue Ravine Road,<br />

Intersection channelization<br />

including additional storage and turn pockets. <strong>2011</strong> $1,493,351 projects<br />

Grouped Projects for Intersection<br />

Channelization<br />

Sacramento<br />

Sacramento<br />

City of Folsom Dept of<br />

Public Works SAC24399 VAR79030<br />

Folsom Lake Bicycle/Pedestrian<br />

Trail & Overcrossing<br />

City of Folsom Dept of<br />

Public Works SAC24324 VAR79030 Folsom Lake Trail<br />

In Folsom, along the Folsom Lake Trail corridor from the historic truss<br />

bridge to Green Valley Road: construct class I bike trail. Project includes<br />

the construction of approximately 4 miles of Class I Bike Trail, including a<br />

bike/pedestrian overcrossing at Folsom Dam Road. (Other State funds are<br />

State EEM Grant funds.) (Emission Benefits: 0.1 kg/day ROG) 2012 $1,703,500 Bicycle and pedestrian facilities<br />

In Folsom, along the Folsom Lake Trail corridor from the Folsom Lake<br />

Crossing Bike/Pedestrian overcrossing to Green Valley Road, construct<br />

approx 2-miles of class 1 bike trail. 2012 $2,500,000 Bicycle and pedestrian facilities<br />

Grouped Projects for Bicycle and<br />

pedestrian facilities<br />

Grouped Projects for Bicycle and<br />

pedestrian facilities<br />

<strong>2011</strong> <strong>MTIP</strong> - Page 393 of 423<br />

Page <strong>14</strong> of 37

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!