Final 2011/14 MTIP - sacog
Final 2011/14 MTIP - sacog
Final 2011/14 MTIP - sacog
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Appendix 10<br />
County Lead Agency Project ID<br />
Placer<br />
Placer<br />
Grouped Cat.<br />
ID Title Description<br />
Placer County Dept of<br />
Public Works PLA25444 VAR79008 Wise Rd Bridge Replacement<br />
Placer County Dept of<br />
Public Works PLA25453 VAR79008<br />
Yankee Slough Bridge<br />
Replacement<br />
Placer Placer County Transit PCT10494 CNG Station Upgrade Phase 2<br />
Placer Placer County Transit PCT10501 VAR79058<br />
Placer Placer County Transit PCT10491 VAR79057<br />
Placer Placer County Transit PCT10500 VAR79058<br />
Placer County CNG<br />
Replacement Buses<br />
Placer County Non-Urbanized<br />
Transit Operations<br />
Placer County Transit<br />
Replacement Buses<br />
Placer Placer County Transit PCT10496 VAR79055 Preventive Maintenance<br />
Placer Placer County Transit PCT10493 VAR79057<br />
Placer Placer County Transit PCT10502 VAR79057<br />
Placer Placer County Transit PCT10479 VAR79065<br />
Placer Placer County Transit PCT10475 VAR79057<br />
Placer County<br />
Transportation Planning<br />
Placer Agency<br />
PLA25440<br />
Placer<br />
Placer<br />
Placer County<br />
Transportation Planning<br />
Agency PLA25468 VAR79029<br />
Placer County<br />
Transportation Planning<br />
Agency PLA25413 VAR79046<br />
Preventive Maintenance and<br />
ADA Operations 2009-20<strong>14</strong><br />
Preventive Maintenance and<br />
ADA Operations 2010-20<strong>14</strong><br />
Sierra College Bus Stop<br />
Improvments<br />
Tahoe Truckee Jobs Access<br />
Reverse Commute Program<br />
I-80/SR65 Interchange<br />
Improvements<br />
Placer County Congestion<br />
Management Program<br />
Completion<br />
Year Total Cost Exempt Cat. Grouped Cat.<br />
Grouped Projects for Bridge<br />
Rehabilitation and Reconstruction -<br />
HBP Program<br />
Widening narrow pavements or<br />
Wise Rd., over Auburn Ravine, between Millerton & Stone Rd.: Replace<br />
existing 2 lane bridge with a new 2 lane bridge <strong>2011</strong><br />
reconstructing bridges (no<br />
$2,334,000 additional travel lanes)<br />
Widening narrow pavements or<br />
Dowd Rd. over Yankee Slough, just south of Dalby Rd.: Replace existing<br />
structurally deficient bridge with new 2 lane bridge. (Toll Credits for CON) 2012<br />
reconstructing bridges (no<br />
$2,341,000 additional travel lanes)<br />
Construction of new buses or rail<br />
Dewitt Center in Auburn: Increase of CNG compressor capacity at Placer<br />
County CNG fueling station in Auburn. (Emissions Benefits in kg/day: 3.46<br />
NOx, 0.12 PM10.) *Local Funds are Air District Funds* <strong>2011</strong><br />
storage/maintenance facilities<br />
categorically excluded in 23 CFR<br />
$576,809 part 771<br />
Purchase of four (4) Compressed Natural Gas (CNG) buses to replace<br />
older vehicles currently in use by Placer County Transit. The new CNG<br />
buses will be used on regional transit routes connecting Rocklin, Lincoln,<br />
Loomis, Auburn and Placer County to Roseville and the Watt/I-80 Light Rail<br />
Station. (Emission Benefits in kg/day: 3.16 NOx) 20<strong>14</strong> $2,059,528<br />
For the Ongoing Operation of transit services within the non-urbanized<br />
areas of Placer County. 20<strong>14</strong> $3,290,175<br />
Purchase of two (2) 35' CNG replacement buses for Placer County Transit.<br />
Additional funding is required in order to fully complete the project using an<br />
existing FTA grant. See notes below. <strong>2011</strong> $282,390<br />
Purchase of new buses and rail<br />
cars to replace existing vehicles<br />
or for minor expansions of the<br />
fleet<br />
Operating assistance to transit<br />
agencies<br />
Purchase of new buses and rail<br />
cars to replace existing vehicles<br />
or for minor expansions of the<br />
fleet<br />
In non-urbanized areas of Placer County: Preventive maintenance.<br />
(Includes TART as well.) <strong>2011</strong> $251,098 Rehabilitation of transit vehicles<br />
Preventive Maintenance 2009 = $324,890 ADA Ops 2009 = $281,700<br />
Preventive Maintenance 2010 = $300,000 ADA Ops 2010 =<br />
$200,000Preventive Maintenance <strong>2011</strong> = $324,890 ADA Ops <strong>2011</strong> =<br />
$206,700Preventive Maintenance 2012 = $324,890 ADA Ops 2012 =<br />
$206,700Preventive Maintenance 2013 = $324,890 ADA Ops 2013 =<br />
$206,700Preventive Maintenance 20<strong>14</strong> = $324,890 ADA Ops 20<strong>14</strong> =<br />
Operating assistance to transit<br />
$206,700 20<strong>14</strong> $4,041,190 agencies<br />
Preventive Maintenance 2010 = $300,000; ADA Ops 2010 =<br />
$200,000Preventive Maintenance <strong>2011</strong> = $324,890; ADA Ops <strong>2011</strong> =<br />
$206,700Preventive Maintenance 2012 = $324,890; ADA Ops 2012 =<br />
$206,700Preventive Maintenance 2013 = $324,890; ADA Ops 2013 =<br />
$206,700Preventive Maintenance 20<strong>14</strong> = $324,890 ADA Ops 20<strong>14</strong> =<br />
$206,700 20<strong>14</strong><br />
Operating assistance to transit<br />
$3,282,952 agencies<br />
Entrance bus stop on the periphery of Sierra College campus along Rocklin<br />
Road. Existing Grant #CA-Y046-00). 2010 $113,095 Bus terminals and transfer points<br />
In Placer County, Provide JARC operating assistance to Tahoe Area<br />
Operating assistance to transit<br />
Regional Transit. Part of Sac RT Grant #CA-37-X065. <strong>2011</strong> $1,320,000 agencies<br />
Rebuild Highway 65 / I-80 interchange to improve movement from<br />
eastbound I-80 to northbound Highway 65 (Phase 1). (PA&ED of<br />
$3,899,700 to be matched at 10% with Toll Credits.) 2020 $30,000,000<br />
Specific activities which do not<br />
involve or lead directly to<br />
construction, such as: planning<br />
Provide educational and outreach efforts regarding alternative<br />
transportation modes to employers, residents and the school community<br />
through the Placer County Congestion Management Program (CMP). CMP<br />
activities will be coordinated with the City of Roseville and SACOG's<br />
Regional Rideshare / TDM Program. (KG/day ROG 91.25; NOx 105.67;<br />
PM10 36.39) 20<strong>14</strong><br />
and technical studies, grants for<br />
training and research programs,<br />
planning activities conducted<br />
pursuant to titles 23 and 49<br />
U.S.c., and Federal-aid systems<br />
$570,428 revisions<br />
Specific activities which do not<br />
involve or lead directly to<br />
construction, such as: planning<br />
and technical studies, grants for<br />
training and research programs,<br />
planning activities conducted<br />
pursuant to titles 23 and 49<br />
Planning, Programming,<br />
U.S.c., and Federal-aid systems<br />
Monitoring <strong>2011</strong>-2015 PCTPA plan, program, monitor (PPM) for RTPA related activities. 2015 $807,000 revisions<br />
Grouped Projects for Bridge<br />
Rehabilitation and Reconstruction -<br />
HBP Program<br />
Grouped Projects for Purchase of new<br />
buses and rail cars to replace existing<br />
vehicles or for minor e<br />
Grouped Projects for Operating<br />
assistance to transit agencies<br />
Grouped Projects for Purchase of new<br />
buses and rail cars to replace existing<br />
vehicles or for minor e<br />
Grouped Projects for Rehabilitation of<br />
transit vehicles<br />
Grouped Projects for Operating<br />
assistance to transit agencies<br />
Grouped Projects for Operating<br />
assistance to transit agencies<br />
Grouped Projects for Bus Terminals and<br />
Transfer Points<br />
Grouped Projects for Operating<br />
assistance to transit agencies<br />
Grouped Projects for Ride-sharing and<br />
van-pooling<br />
Grouped Projects for Activities that do<br />
not lead to construction<br />
Placer<br />
South Placer Regional<br />
Transportation Authority PLA20721 Placer Parkway<br />
New 4 lane connector (ultimate 6 lanes freeway) in 500'- to 1,000'-wide<br />
corridor connecting SR 70/99 (between Riego Road & Sankey Road) to SR<br />
65 (Whitney Ranch Parkway). (Note: as the project proceeds, Parkway<br />
segments will be administered by different lead agencies depending upon<br />
location of the segment. In Placer County, it will be SPRTA or Roseville<br />
and/or Placer County; in Sutter County it will be Sutter County.) 2035 $660,000,000<br />
<strong>2011</strong> <strong>MTIP</strong> - Page 390 of 423<br />
Page 11 of 37