Appendix 5 - Completed, Deleted, and Delayed Projects<br />

Completed Projects from the Previous 2009/12 <strong>MTIP</strong><br />

County Lead Agency Project ID Title Description Completion Year Total Cost<br />

Yolo<br />

Yolo County<br />

Transportation District<br />

YCT18107<br />

YCTD FY 2008 5311 Rural<br />

Formula Operating Assistance YCTD FY 2008 5311 Rural Formula Operating Assistance 2009 $1,280,570<br />

Yuba Caltrans District 3 CAL20380 SR 20 Road Rehab<br />

In Yuba Co., near Marysville, SR20 from 0.2 miles west of Spring Valley<br />

Road to 0.1 mile east of Marysville Road: Apply thin asphalt overlay. 2010 $1,227,430<br />

Yuba Caltrans District 3 CAL18783<br />

SR-70 Marysville Pavement<br />

Rehabilitation<br />

Near Marysville, SR 70, from 24th Street to the Butte County Line:<br />

Rehabilitate Pavement. (SHOPP) 2009 $10,244,000<br />

East 10th and Ramirez Intersection: Install a new traffic signal, make<br />

pedestrian improvements and landscaping improvements (community<br />

City of Marysville Dept of<br />

10th and Ramirez Road Rehab design portion), rehabilitate roadway in and adjacent to the intersection<br />

Yuba Public Works<br />

YUB15989 & Intersection Improvements and complete channelization changes. 2010 $553,000<br />

Yuba<br />

City of Marysville Dept of<br />

Public Works<br />

YUB15700<br />

2002 Pavement Rehabilitation<br />

Project Phase 2<br />

In Marysville, various roads including Rideout Way: phase 2 pavement<br />

rehabilitation. 2009 $480,064<br />

Yuba<br />

City of Marysville Dept of<br />

Public Works YUB16000 3rd St Rehab<br />

Third St (3rd St), from D St to J St and J St from Third St to 5th St:<br />

Rehabilitate and replace pavement. 2009 $1,386,215<br />

Yuba City of Wheatland YUB16001 Main St. Rehab<br />

Main Street from From SR 65 to Olive St: Rehabilitate roadway and HMAC<br />

overlay. 2009 $486,249<br />

Yuba City of Wheatland YUB15994 Wheatland Bus Shelter Project<br />

Yuba County Dept of<br />

40 Mile Road Road Rehab<br />

Yuba Public Works<br />

YUB15990 Phase 2<br />

Yuba<br />

Yuba<br />

Yuba<br />

Yuba<br />

Yuba County Dept of<br />

Public Works<br />

Yuba County Dept of<br />

Public Works<br />

In the City of Wheatland; install a minimum of three (3) bus shelters and<br />

ancillary trash receptacles, benches, and signs to serve transit stops.<br />

($100k of Local Funds are from SACOG Community Design Program.) 2009 $111,500<br />

In Yuba County, 40 Mile Road from North of Dairy road to Plumas Arboga<br />

Road: rehabilitate roadway. 2010 $324,046<br />

La Porte Road from Challenge Cutoff Road to west Butte County Line and<br />

from east Butte County line to approximately 1 ½ miles south of Road 100;<br />

rehabilitate roadway. 2009 $995,038<br />

Yuba County Dept of<br />

Public Works YUB16002 La Porte Rd. Rehab<br />

Yuba County Dept of<br />

Marysville Road Turn Pocket<br />

Public Works<br />

YUB15947 Project Phase 1 Construct turn pockets at Fruitland Road and Spring Valley Road 2009 $520,000<br />

Community of Olivehurst: Examine alternative designs (traffic signal/roundabout)<br />

and provide the design plans, specifications and estimate to<br />

improve the intersection and to provide illumination for the intersection and<br />

Olivehust Ave/Powerline Rd overpass. ($100k Local Funds are from SACOG Community Design<br />

YUB15995 Intersection<br />

Program) 2009 $115,000<br />

YUB15924<br />

River Oaks Blvd Traffic Signal<br />

at Plumas Lake Parkway Construct new traffic signal at River Oaks Blvd and Plumas Lake Pkwy. 2010 $300,000<br />

Yuba<br />

Yuba<br />

Yuba County Dept of<br />

Public Works YUB16003 Road Rehab RSTP ARRA<br />

Yuba County Dept of<br />

Public Works<br />

YUB15960<br />

Willow Glen Road from French Town Road to 1.5 miles south; Challenge<br />

Cutoff Road from La Porte Road to Butte Co. Line; McGowan Parkway<br />

from railroad tracks east of Arboga Rd to SR 70: rehabilitate roadways. 2010 $1,125,000<br />

South Plumas Lake Park and<br />

Ride Lot Construct new Park and Ride lot in the south portion of Plumas Lake. 2010 $1,046,000<br />

<strong>2011</strong> <strong>MTIP</strong> - Page 343 of 423<br />

Completed Projects: Page 20 of 39