Appendix 5 - Completed, Deleted, and Delayed Projects<br />
Completed Projects from the Previous 2009/12 <strong>MTIP</strong><br />
County Lead Agency Project ID Title Description Completion Year Total Cost<br />
Yolo<br />
Yolo County<br />
Transportation District<br />
YCT18107<br />
YCTD FY 2008 5311 Rural<br />
Formula Operating Assistance YCTD FY 2008 5311 Rural Formula Operating Assistance 2009 $1,280,570<br />
Yuba Caltrans District 3 CAL20380 SR 20 Road Rehab<br />
In Yuba Co., near Marysville, SR20 from 0.2 miles west of Spring Valley<br />
Road to 0.1 mile east of Marysville Road: Apply thin asphalt overlay. 2010 $1,227,430<br />
Yuba Caltrans District 3 CAL18783<br />
SR-70 Marysville Pavement<br />
Rehabilitation<br />
Near Marysville, SR 70, from 24th Street to the Butte County Line:<br />
Rehabilitate Pavement. (SHOPP) 2009 $10,244,000<br />
East 10th and Ramirez Intersection: Install a new traffic signal, make<br />
pedestrian improvements and landscaping improvements (community<br />
City of Marysville Dept of<br />
10th and Ramirez Road Rehab design portion), rehabilitate roadway in and adjacent to the intersection<br />
Yuba Public Works<br />
YUB15989 & Intersection Improvements and complete channelization changes. 2010 $553,000<br />
Yuba<br />
City of Marysville Dept of<br />
Public Works<br />
YUB15700<br />
2002 Pavement Rehabilitation<br />
Project Phase 2<br />
In Marysville, various roads including Rideout Way: phase 2 pavement<br />
rehabilitation. 2009 $480,064<br />
Yuba<br />
City of Marysville Dept of<br />
Public Works YUB16000 3rd St Rehab<br />
Third St (3rd St), from D St to J St and J St from Third St to 5th St:<br />
Rehabilitate and replace pavement. 2009 $1,386,215<br />
Yuba City of Wheatland YUB16001 Main St. Rehab<br />
Main Street from From SR 65 to Olive St: Rehabilitate roadway and HMAC<br />
overlay. 2009 $486,249<br />
Yuba City of Wheatland YUB15994 Wheatland Bus Shelter Project<br />
Yuba County Dept of<br />
40 Mile Road Road Rehab<br />
Yuba Public Works<br />
YUB15990 Phase 2<br />
Yuba<br />
Yuba<br />
Yuba<br />
Yuba<br />
Yuba County Dept of<br />
Public Works<br />
Yuba County Dept of<br />
Public Works<br />
In the City of Wheatland; install a minimum of three (3) bus shelters and<br />
ancillary trash receptacles, benches, and signs to serve transit stops.<br />
($100k of Local Funds are from SACOG Community Design Program.) 2009 $111,500<br />
In Yuba County, 40 Mile Road from North of Dairy road to Plumas Arboga<br />
Road: rehabilitate roadway. 2010 $324,046<br />
La Porte Road from Challenge Cutoff Road to west Butte County Line and<br />
from east Butte County line to approximately 1 ½ miles south of Road 100;<br />
rehabilitate roadway. 2009 $995,038<br />
Yuba County Dept of<br />
Public Works YUB16002 La Porte Rd. Rehab<br />
Yuba County Dept of<br />
Marysville Road Turn Pocket<br />
Public Works<br />
YUB15947 Project Phase 1 Construct turn pockets at Fruitland Road and Spring Valley Road 2009 $520,000<br />
Community of Olivehurst: Examine alternative designs (traffic signal/roundabout)<br />
and provide the design plans, specifications and estimate to<br />
improve the intersection and to provide illumination for the intersection and<br />
Olivehust Ave/Powerline Rd overpass. ($100k Local Funds are from SACOG Community Design<br />
YUB15995 Intersection<br />
Program) 2009 $115,000<br />
YUB15924<br />
River Oaks Blvd Traffic Signal<br />
at Plumas Lake Parkway Construct new traffic signal at River Oaks Blvd and Plumas Lake Pkwy. 2010 $300,000<br />
Yuba<br />
Yuba<br />
Yuba County Dept of<br />
Public Works YUB16003 Road Rehab RSTP ARRA<br />
Yuba County Dept of<br />
Public Works<br />
YUB15960<br />
Willow Glen Road from French Town Road to 1.5 miles south; Challenge<br />
Cutoff Road from La Porte Road to Butte Co. Line; McGowan Parkway<br />
from railroad tracks east of Arboga Rd to SR 70: rehabilitate roadways. 2010 $1,125,000<br />
South Plumas Lake Park and<br />
Ride Lot Construct new Park and Ride lot in the south portion of Plumas Lake. 2010 $1,046,000<br />
<strong>2011</strong> <strong>MTIP</strong> - Page 343 of 423<br />