19.06.2014 Views

Final 2011/14 MTIP - sacog

Final 2011/14 MTIP - sacog

Final 2011/14 MTIP - sacog

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Appendix 5 - Completed, Deleted, and Delayed Projects<br />

Delayed Projects from the Previous 2009/12 <strong>MTIP</strong><br />

County Lead Agency Project ID Title Description Completion Year Total Cost<br />

Placer<br />

Placer<br />

Placer<br />

Placer<br />

Placer<br />

Placer<br />

Placer<br />

Placer<br />

City of Lincoln Dept of<br />

Public Works PLA18650 Aviation Blvd.<br />

Widen Aviation Blvd. from 2 to 4 lanes from Venture Dr. to terminus 0.5<br />

miles north of Venture Dr. 2020 $850,000<br />

City of Lincoln Dept of<br />

Widen East Joiner Parkway from 2 to 4 lanes from Del Webb Blvd. to<br />

Public Works PLA18790 East Joiner Parkway<br />

Twelve Bridges. 2018 $1,104,290<br />

City of Lincoln Dept of<br />

Widen East Joiner Parkway from 2 to 4 lanes from Twelve Bridges Dr. to<br />

Public Works PLA18810 East Joiner Parkway<br />

Rocklin city limits. 2015 $639,170<br />

City of Lincoln Dept of<br />

Industrial Blvd., from 12 Bridges Dr. to Athens Blvd.: Widen from 2 to 4<br />

Public Works PLA18720 Industrial Blvd.<br />

lanes. 2015 $1,876,246<br />

City of Lincoln Dept of<br />

Public Works PLA15970 Nicolaus Rd. Widen Nicolaus Rd. from 2 to 4 lanes from Airport Rd. to Aviation Blvd. 2020 $2,250,600<br />

City of Rocklin Division of<br />

Midas Ave., from Pacific St. to Third St., construct 2 lane grade separation<br />

Engineering PLA25373 Midas Ave. Grade Separation of UP tracks including right of way. 2020 $5,650,000<br />

City of Rocklin Division of<br />

Engineering PLA17820 Pacific Street On Pacific Street: Construct downtown improvements. 2020 $8,000,000<br />

City of Rocklin Division of<br />

Widen Rocklin Road from 2 to 4 lanes from Loomis town limits to east of<br />

Engineering PLA25273 Rocklin Road Widening Sierra College Boulevard. 2016 $126,000<br />

Placer<br />

Placer<br />

Placer<br />

Placer<br />

Placer<br />

Placer<br />

Placer<br />

Placer<br />

Placer<br />

Placer<br />

Placer<br />

Placer<br />

Placer<br />

City of Rocklin Division of<br />

Engineering PLA19330 Sierra College Boulevard<br />

In Rocklin, Sierra College Boulevard: widen to 4 lanes from intersection<br />

with Valley View Parkway to Loomis Town limits (SPRTA Segment #2a). 2016 $8,650,000<br />

City of Rocklin Division of<br />

Widen Sierra College Boulevard from 5 to 6 lanes from Aguilar Tributary to<br />

Engineering PLA25193 Sierra College Boulevard Nightwatch Drive. 2020 $4,400,000<br />

City of Rocklin Division of<br />

Widen Sunset Boulevard bridge at UPRR from 4 to 6 lanes from South<br />

Engineering PLA17910 Sunset Boulevard<br />

Whitney Blvd. to Pacific St. 2020 $2,600,000<br />

City of Rocklin Division of<br />

Widen Sunset Boulevard from 4 to 6 lanes from Stanford Ranch Rd. to<br />

Engineering PLA19360 Sunset Boulevard<br />

Topaz. 2016 $2,600,000<br />

City of Rocklin Division of<br />

Engineering PLA15620 Sunset Boulevard Widen Sunset Boulevard from 4 to 6 lanes, from Topaz to S. Whitney Blvd. 2016 $2,700,000<br />

City of Rocklin Division of<br />

Valley View Parkway: Construct 2 lanes from Park Drive to Sierra College<br />

Engineering PLA19250 Valley View Parkway<br />

Blvd. 2016 $9,575,000<br />

City of Rocklin Division of<br />

West Oaks Boulevard: Construct new 4-lane extension from terminus to 4-<br />

Engineering PLA25151 West Oaks Boulevard lane portion to Whitney Ranch Parkway. 2015 $3,500,000<br />

City of Rocklin Division of<br />

Whitney Ranch Parkway, construct new 4-lane facility from east of Wildcat<br />

Engineering PLA19290 Whitney Ranch Parkway Blvd. to Whitney Oaks Dr. 2016 $12,428,000<br />

Galleria Blvd./SR 65<br />

In Roseville, at existing interchange on State Route 65/Galleria<br />

Interchange Phase II<br />

Blvd/Stanford Ranch Rd.: modify all on and off ramps to provide improved<br />

PLA25209 Improvements<br />

operations. 2015 $5,000,000<br />

City of Roseville Dept of<br />

Public Works<br />

Placer County Dept of<br />

Public Works<br />

Placer County Dept of<br />

Public Works<br />

Placer County Dept of<br />

Public Works<br />

PLA15070<br />

PLA20680<br />

PLA25127<br />

Placer County Dept of<br />

Public Works PLA18390 Dyer Lane Extension<br />

Auburn Ravine Road at I-80<br />

Overcrossing<br />

Auburn Ravine Road overcrossing over I-80 between Bowman Road to<br />

Lincoln Way: widen overcrossing from 2 to 4 lanes. 2033 $29,000,000<br />

Baseline Road Four to Six Lane<br />

Widening (East Portion) Widen From 4 to 6 lanes from Watt Avenue to Fiddyment/Walerga Road. 2018 $11,270,000<br />

Baseline Road Four to Six Lane Placer County, Baseline Road from Watt Avenue to Sutter County Line,<br />

Widening (West Portion) widen from 4 to 6 lanes. 2020 $24,000,000<br />

Extend Dyer Lane west/north to Baseline Road at Brewer Road and<br />

east/north to Baseline Road west of Fiddyment Road and widen to four<br />

lanes in accordance with the Placer Vineyards Specific Plan. 2015 $16,000,000<br />

<strong>2011</strong> <strong>MTIP</strong> - Page 356 of 423<br />

Delayed Projects: Page 33 of 39

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!