COMMENT2: Project YOL17010 of Group VAR79046 – Yolo County PPM (pg 139 of<br />

Appx 4) – State Bond Funds identified are Corridor Mobility Program for Plan,<br />

Program and Monitor for Yolo County – Is this the Corridor Mobility Improvement<br />

Account (CMIA) from Proposition 1B? If so, CMIA only funds construction capital<br />

costs.<br />

RESPONSE: SACOG changed the fund type from CMIA to RIP – State Cash to<br />

match the STIP.<br />

COMMENT3: Project ELD19186 of Group VAR79009 - Northside School Class 1<br />

Bike Path, Phase 1 (pg 2, Appx 4) and PLA25226 of Group VAR79009 - Palm Ave<br />

Sidewalks/Bicycle Lane (pg 3, Appx 4) – The scope of these projects are not<br />

consistent with the Group listing selected.<br />

RESPONSE: SACOG has moved these two projects to the Safe Routes to School<br />

grouped listing, which is a better fit for the projects, considering their funding source.<br />

COMMENT4: Project SAC24191 of Group VAR79030 (pg <strong>14</strong> of Appx 4) – Please<br />

identify the matching funds as required.<br />

RESPONSE: SACOG addressed this by moving the $1,600,000 of RSTP funds in<br />

<strong>2011</strong> to 2010 to reflect the recent obligation. As a result, this project no longer has<br />

funds in the 4 years of the <strong>MTIP</strong> and is shown for information only.<br />

COMMENT5: Project CAL18835 of Group VAR79001 (pg 81 of Appx 4) – Amounts<br />

for this project do not agree with the amounts identified in CTIPS/SHOPP.<br />

RESPONSE: The CTC allocated this for construction at a different amount than what<br />

is listed in either the SHOPP or <strong>MTIP</strong>. SACOG reduced this to match the August<br />

CTC allocation of $2,733,000 for construction. ($1,500,000 for construction).<br />

COMMENT6: Project SAC24521 of Group VAR79008 (pg173 of Appx 4) – Amount<br />

does not agree with the Detailed Lump Sum Highway Bridge Program provided by<br />

the Department.<br />

RESPONSE: SACOG fixed this as a typographical error. Funding did not account for<br />

construction activity after 20<strong>14</strong>. SACOG added $5,716,000 to the construction work<br />

after 20<strong>14</strong>, which increased the total project cost by an equal amount.<br />

COMMENT7: Group VAR79065 – Grouped Projects for Bus Terminals and Transfer<br />

Points (pg 4, Appx 3) – This Group listing is not included in the Pre-Approved<br />

Grouped Project Listing. Please revise Group listing to agree to the Pre-Approved<br />

Group Project Listing.<br />

<strong>2011</strong> <strong>MTIP</strong> - Page 375 of 423