Final 2011/14 MTIP - sacog
Final 2011/14 MTIP - sacog
Final 2011/14 MTIP - sacog
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Appendix 10<br />
County Lead Agency Project ID<br />
Sacramento<br />
Sacramento<br />
Sacramento<br />
Sacramento<br />
Sacramento<br />
Sacramento<br />
Sacramento<br />
Sacramento<br />
Sacramento<br />
Sacramento Regional<br />
Transit District REG17782 VAR79058 CNG Bus Replacement<br />
Sacramento Regional<br />
Transit District REG17943 VAR79043 DNA Light Rail - Overall<br />
Sacramento Regional<br />
Transit District<br />
REG17320<br />
Sacramento Regional<br />
Transit District REG17796 VAR79065<br />
Grouped Cat.<br />
ID Title Description<br />
DNA Light Rail Phase 1<br />
(MOS1A)<br />
Downtown Light Rail Station<br />
Enhancements<br />
Sacramento Regional<br />
Transit District REG17817 VAR79054 Fare Vending Machines<br />
Sacramento Regional<br />
Transit District REG17952 VAR79051 Fulton Ave. Bus Shelters<br />
Sacramento Regional<br />
Transit District REG18009 VAR79050 General Facility Improvements<br />
Sacramento Regional<br />
Transit District REG17941 VAR79052 GO 95 System Upgrade<br />
Sacramento Regional<br />
Transit District REG17795 VAR79047<br />
Completion<br />
Year Total Cost Exempt Cat. Grouped Cat.<br />
Purchase of new buses and rail<br />
cars to replace existing vehicles<br />
Bus Acquisitions - 91 CNG Replacement Buses. [TCRP funds from SECAT<br />
Program.] (NOx 118, PM10 6 kg/day) <strong>2011</strong><br />
or for minor expansions of the<br />
$39,581,505 fleet<br />
This project will advance Phase I (DNA MOS-1A) to the 30% engineering<br />
level, and redefine a Minimum Operable Segment 2 and possibly 3.<br />
Construction is REG17320, Phase II is REG17935, and Phase III is<br />
REG17325. Total project cost for DNA MOS-1A through MOS-3 is<br />
$803,809,743. (All federal funds transferred to FTA prior to 2008. ) 2017<br />
Engineering to assess social,<br />
economic, and environmental<br />
effects of the proposed action or<br />
$<strong>14</strong>,258,336 alternatives to that action.<br />
<strong>Final</strong> Engineering, <strong>Final</strong> EIR, Design, and Construct Phase I of the<br />
Downtown Natomas Airport Light Rail Line. This extends light rail via a<br />
single track from Downtown Sacramento to Richards Boulevard, a distance<br />
of just over 1.1 miles, but stopping short of a crossing of the American<br />
River. The project is projected to be completed for revenue service by the<br />
first quarter of <strong>2011</strong>, and Measure A Plan of Finance funding is available to<br />
complete the project in this time frame. However, SACOG has requested a<br />
completion date of 2012, to satisfy State Air Quality Implementation Plan<br />
requirements. The adopted RT Short Range Transit Plan (3/10/2008)<br />
reflects this project scope. <strong>2011</strong> $43,880,882<br />
Design and construct light rail station enhancements, including better<br />
signage, lighting, pedestrian access, and ADA access to encourage greater<br />
transit usage <strong>2011</strong> $621,258 Bus terminals and transfer points<br />
Purchase of office, shop, and<br />
Purchase fare vending machines for light rail stations and support<br />
equipment for FVM monitoring 2012<br />
operating equipment for existing<br />
$1,200,000 facilities<br />
Along Fulton Ave., from Arden Wy. to Auburn Blvd.: Design and install 8 to<br />
Construction of small passenger<br />
11 bus shelters, including easements. 20<strong>14</strong> $169,435 shelters and information kiosks<br />
Sacramento Regional Transit District: provide for various minor upgrades<br />
and improvements to district facilities, such as roof replacement, better<br />
lighting, security systems, ventilation, accessibility modifications, and safety<br />
enhancements. 2012 $562,500<br />
Reconstruction or renovation of<br />
transit buildings and structures<br />
(e.g., rail or bus buildings, storage<br />
and maintenance facilities,<br />
stations, terminals, and ancillary<br />
structures)<br />
Construction or renovation of<br />
Completion year extended to <strong>2011</strong>. Reevaluating funding for possible<br />
inclusion on a different project. <strong>2011</strong><br />
power, signal, and<br />
$375,000 communications systems<br />
Transportation enhancement<br />
activities (except rehabilitation<br />
and operation of historic<br />
Light Rail Station<br />
Enhancements Enhance pedestrian and ADA accessibility at light rail stations. <strong>2011</strong><br />
transportation buildings,<br />
$220,262 structures or facilities)<br />
Grouped Projects for Purchase of new<br />
buses and rail cars to replace existing<br />
vehicles or for minor e<br />
Grouped Projects for Planning activities<br />
Grouped Projects for Bus Terminals and<br />
Transfer Points<br />
Grouped Projects for Purchase of<br />
office, shop, and operating equipment<br />
for existing facilities<br />
Grouped Projects for Construction of<br />
small passenger shelters and<br />
information kiosks<br />
Grouped Projects for Reconstruction or<br />
renovation of transit buildings and<br />
structures<br />
Grouped Projects for Construction or<br />
renovation of power, signal, and<br />
communications systems<br />
Grouped Projects for Transportation<br />
enhancement activities<br />
Sacramento<br />
Sacramento<br />
Sacramento<br />
Sacramento<br />
Sacramento<br />
Sacramento Regional<br />
Transit District REG17940 VAR79047<br />
Light Rail Station<br />
Enhancements & Bus Stops<br />
Sacramento Regional<br />
Transit District REG15880 VAR79055 LRV Mid-Life Overhaul<br />
Sacramento Regional<br />
Transit District REG17924 VAR79058<br />
Sacramento Regional<br />
Transit District<br />
REG16470<br />
Neighborhood Ride Vehicle<br />
Replacement<br />
Northeast Corridor<br />
Enhancements<br />
Sacramento Regional<br />
Transit District REG15282 VAR79053 OCS/Substation Upgrades<br />
Enhancement of Sacramento Regional Transit District bus stops including<br />
addition of i-stops, benches and trash cans.Install Braille signage at<br />
strategic bus stops in the Sacramento Regional Transit District service<br />
area.Enhancement of Light Rail Stations lighting improvements and<br />
replacing braille signage along the Sacramento Regional Transit Light Rail<br />
System and improved pedestrian access to the station. <strong>2011</strong><br />
Transportation enhancement<br />
activities (except rehabilitation<br />
and operation of historic<br />
transportation buildings,<br />
$673,587 structures or facilities)<br />
SRTD mid-life overhaul of light rail vehicles. (FFY 2007 funds will<br />
rehabilitate 6 to 8 vehicles.) (FTA 5307 funds are unused funds from FFY<br />
2005) <strong>2011</strong> $9,932,503 Rehabilitation of transit vehicles<br />
1.) Purchase <strong>14</strong> Neighborhood Ride Gasoline Vehicles to replace vehicles<br />
which have surpassed their useful lives. 17 are needed, but 3 will be funded<br />
from an alternate source. RT assumes $110,000 per vehicle and a 5 year<br />
Purchase of new buses and rail<br />
life. 2) purchase up to 6 hybrid vehicles- cost up to $250,000 each.<br />
cars to replace existing vehicles<br />
(Emissions reduced: 4 kg/day NOx)2.) Purchase up to 6 hybrid vehicles<br />
or for minor expansions of the<br />
cost up to $250,000 each. 2012 $3,795,000 fleet<br />
Double track existing single track sections and improve alignment of<br />
Northeast Corridor LRT, upgrade the traction power system and signaling to<br />
provide limited-stop service, make enhancements to yard track and<br />
maintenance facility, and installation of communications infrastructure.<br />
(Local Agency Funds are from selling a parcel of land.) 20<strong>14</strong> $34,500,000<br />
Purchase equipment to support light rail operations, including but not limited<br />
Purchase of operating equipment<br />
to replacement parts for substations and overhead catenary, lighting and<br />
for vehicles (e.g., radios,<br />
signal crossing equipment, supervisory control, etc. 2012 $500,415 fareboxes, lifts, etc.)<br />
Grouped Projects for Transportation<br />
enhancement activities<br />
Grouped Projects for Rehabilitation of<br />
transit vehicles<br />
Grouped Projects for Purchase of new<br />
buses and rail cars to replace existing<br />
vehicles or for minor e<br />
Grouped Projects for Purchase of<br />
operating equipment for vehicles<br />
<strong>2011</strong> <strong>MTIP</strong> - Page 403 of 423<br />
Page 24 of 37