Appendix 5 - Completed, Deleted, and Delayed Projects<br />

Delayed Projects from the Previous 2009/12 <strong>MTIP</strong><br />

County Lead Agency Project ID Title Description Completion Year Total Cost<br />

El Dorado<br />

El Dorado County Dept of<br />

Transportation<br />

ELD19210<br />

US 50 Camino Area Parallel<br />

Capacity/Safety Study<br />

Study to identify and analyze alternatives to improve access and reduce<br />

accidents at US 50 and Camino Rd. EDCTC is lead agency on study. This<br />

project is EDCDOT's contribution to the study. Preferred alternative to be<br />

implemented in project CAL18190. CIP71319 2025 $4,332,500<br />

El Dorado<br />

El Dorado<br />

El Dorado<br />

El Dorado<br />

El Dorado<br />

El Dorado<br />

El Dorado<br />

El Dorado<br />

El Dorado<br />

El Dorado County Dept of<br />

Transportation ELD19290 US 50 HOV Lanes - Phase 2B<br />

El Dorado County Dept of<br />

Transportation<br />

El Dorado County Dept of<br />

Transportation<br />

ELD19215<br />

ELD19182<br />

El Dorado County Dept of<br />

Transportation<br />

ELD19181<br />

El Dorado County Dept of<br />

Transportation<br />

ELD19178<br />

El Dorado County Dept of<br />

Transportation<br />

ELD19272<br />

El Dorado County Dept of<br />

Transportation<br />

ELD10090<br />

El Dorado County Dept of<br />

Transportation<br />

ELD15370<br />

El Dorado County Dept of<br />

Transportation<br />

ELD19294<br />

US 50 Mainline Widening at El<br />

Dorado Hills<br />

US 50/Bass Lake Rd<br />

Interchange - Phase 1<br />

US 50/Cambridge Rd<br />

Interchange - Phase 1<br />

US 50/El Dorado Rd<br />

Interchange - Phase 1<br />

US 50/El Dorado Rd<br />

Interchange - Phase 2<br />

White Rock Rd Widening -<br />

Manchester to County Line<br />

White Rock Rd Widening -<br />

Monte Verde to US50/Silva<br />

Valley<br />

White Rock Rd/Post St -<br />

Signalization<br />

Phase 2B (Cameron Park Dr to Ponderosa Rd) - Add HOV lanes in median<br />

of US50 between Cameron Park Dr and Ponderosa Rd Interchanges.<br />

PA&ED completed by Caltrans. Caltrans advancing project design through<br />

Cooperative Agreement with the County. Intergovernmental Agreement<br />

between the County and Shingle Springs Band of Miwok Indians for<br />

funding (coded as Local Agency Funds). (See ELD19211/CIP53110 for<br />

Phase 1, ELD19287/CIP53113 for Phase 2A and ELD19289/CIP53116 for<br />

future unfunded Phase 3 in MTP). CIP53122 2025 $22,637,000<br />

Construct new westbound aux lane within median of US 50 between Silva<br />

Valley Pkwy and Empire Ranch Rd future new interchanges; requires<br />

coordination with Silva Valley I/C (ELD15610/CIP71328), El Dorado Hills<br />

I/C (ELD15630/CIP71323) and Empire Ranch I/C (City of Folsom project).<br />

CIP53120 2020 $2,500,000<br />

Interchange Improvements: this phase includes detailed study to<br />

determine complete improvements needed; Phase 1 may include ramp<br />

widening, road widening, signals, and WB auxiliary lane between Bass<br />

Lake and Silva Valley interchanges; Phase 1 assumes bridge<br />

replacement. (See ELD19217 for Phase 2) CIP71330 2025 $20,829,200<br />

Interchange Improvements: this phase includes widening existing EB and<br />

WB on-/off-ramps; addition of new WB on-ramp; reconstruction of local<br />

intersections; and installation of traffic signals at EB and WB ramp terminal<br />

intersections; preliminary engineering for Phase 2 to be performed under<br />

Phase 1. (See ELD19218 for Phase 2) CIP#71332 2025 $10,644,800<br />

Interchange Improvements: includes signalization and widening of existing<br />

ramps. (See ELD19272 for Phase 2). CIP71347 2025 $3,538,500<br />

Interchange Improvements: this phase involves construction of left and<br />

right turn lanes and additional through traffic lanes in all approaches to the<br />

interchange. (See ELD19178/CIP71347 for Phase 1). CIP71376 2025 $7,265,000<br />

Widen White Rock Rd from 2 to 4 lanes, divided, from Manchester Dr east<br />

to Sacramento County Line. CIP#GP137 2025 $12,835,000<br />

Widen White Rock Rd from 2 lanes undivided to 4 lanes divided, from<br />

Monte Verde Dr east to new future US 50/Silva Valley Pkwy Interchange<br />

(ELD15610/CIP71328); includes curb, gutter, sidewalk and Class II bike<br />

lanes. ROW costs include acquisition for ultimate 6-lane facility (see<br />

CIP#GP152/ELD19235 in MTP). CIP72374 2025 $25,626,500<br />

Signalize intersection at White Rock Rd and Post St in El Dorado Hills.<br />

CIP73310 2025 $474,900<br />

Placer<br />

City of Lincoln Dept of<br />

Public Works<br />

PLA25022<br />

Auburn Ravine Bike/Ped Bridge<br />

Phase 1<br />

In Lincoln: Construction of multi-use bridge across Auburn Ravine:<br />

Preliminary Engineering, Environmental Documentation, Permitting, and<br />

Construction of bicycle and pedestrian bridge crossing Auburn Ravine. 2016 $987,193<br />

<strong>2011</strong> <strong>MTIP</strong> - Page 355 of 423<br />

Delayed Projects: Page 32 of 39