Final 2011/14 MTIP - sacog
Final 2011/14 MTIP - sacog
Final 2011/14 MTIP - sacog
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Appendix 5 - Completed, Deleted, and Delayed Projects<br />
Completed Projects from the Previous 2009/12 <strong>MTIP</strong><br />
County Lead Agency Project ID Title Description Completion Year Total Cost<br />
Placer<br />
Placer<br />
City of Rocklin Division of<br />
Engineering<br />
PLA17780<br />
Rocklin Intercity Rail Station<br />
Phase 1<br />
City of Rocklin Division of<br />
Engineering PLA20470 Sierra College Boulevard<br />
Rocklin Intercity Rail Station: Phase 1(Completed in 2006): Station<br />
improvements, and parking improvements for the Rocklin Intercity Rail<br />
Station 2010 $1,902,881<br />
Widen Sierra College Blvd. from 2 to 4 lanes from I-80 interchange to<br />
Aguilar Tributary. 2010 $3,865,000<br />
Placer<br />
Placer<br />
Placer<br />
Placer<br />
Placer<br />
Placer<br />
City of Rocklin Division of<br />
Engineering<br />
PLA25395<br />
City of Roseville Dept of<br />
Public Works<br />
PLA25347<br />
City of Roseville Dept of<br />
Public Works<br />
PLA25388<br />
City of Roseville Dept of<br />
Public Works PLA25284 2009 ITS Upgrades<br />
Sunset Blvd., from Blue Oaks Blvd. to Atherton Rd.: rehabilitate roadway.<br />
Sunset Blvd. Road<br />
Rehabilitation<br />
Phase 1 is from Blue Oaks Blvd. to West Oaks Blvd. Phase 2 is West<br />
Oaks Blvd. to Lone Tree Blvd. Phase 3 is Lone Tree to Atherton Rd. 2009 $2,112,855<br />
2009 ARRA Cirby Way Overlay<br />
Project In Roseville, Cirby Way from I-80 to southern city limit: resurface roadway. 2010 $1,131,767<br />
In Roseville, On North Sunrise Ave., between Lead Hill Blvd. and East<br />
2009 ARRA North Sunrise Roseville Parkway, place Hot Mix asphalt (HMA) bonded wearing course to<br />
Bonded Wearing Course roadway. 2009 $994,208<br />
In Roseville, install advanced ITS equipment: 2070 signal controllers, ITS<br />
cabinets, communication equipment, WiFi hubs, DSL cable, fiber optic<br />
conduit & cable, system and count detectors, changeable message signs<br />
and related improvements, equipment and materials. 2009 $200,000<br />
City of Roseville Dept of<br />
In Roseville, add micropave resurfacing to sections of Church St., Baseline<br />
Public Works PLA25443 2010 Arterial Micropave Project Rd., Junction Blvd., Foothills Blvd., Atlantic St. & Pleasant Grove Blvd. 2010 $989,013<br />
City of Roseville Dept of<br />
Public Works PLA25286 2010 ITS Upgrades<br />
In Roseville, install advanced ITS equipment: 2070 signal controllers, ITS<br />
cabinets, communication equipment, WiFi hubs, DSL cable, Fiber optic<br />
cable and conduit, system and count detectors, changeable message<br />
signs and related improvements, equipment and materials. 2010 $200,000<br />
Placer<br />
Placer<br />
Placer<br />
Placer<br />
City of Roseville Dept of<br />
Public Works PLA25340 Arterial Microsurfacing Project<br />
City of Roseville Dept of<br />
Bonded Wearing Course Road<br />
Public Works<br />
PLA25207 Rehab<br />
City of Roseville Dept of<br />
Public Works PLA25361 Call Center<br />
City of Roseville Dept of<br />
Public Works PLA15680 Cirby Way Widening<br />
In Roseville, microsurface the following roadway segments:Foothills Blvd. -<br />
north of Blue OaksRocky Ridge Dr. - Cirby Way to E. Roseville PkwyLead<br />
Hill Blvd. - N. Sunrise Ave. to E. Roseville PkwyE. Roseville Pkwy. -<br />
Olympus Dr. to Eureka Rd.Blue Oaks Blvd - Foothills to just east of<br />
Fiddiment Fairway Drive from Stanford Ranch to Blue OaksOld Auburn<br />
Road from Sierra College to E. Roseville ParkwayStanford Ranch Road<br />
from I-80 to N. City LimitsOlympus Dr. from Professional Dr. to Sierra<br />
College Blvd. & Professional Dr. from Douglas Blvd. to Olympus Dr.East<br />
Roseville Parkway from Sierra College to Eastern City Limits.Secret<br />
Ravine Pkwy. from E. Roseville Pkwy. to Sierra College Blvd. 2009 $3,611,354<br />
In Roseville on Foothills Blvd from Pleasant Grove to Blue Oaks: Annual<br />
roadway resurfacing project. 2009 $1,056,250<br />
One-stop Call Center for all of South Placer County for human<br />
service/demand responsive transit. FFY 2006 5317 funds used. 2010 $250,000<br />
Intersection improvements along Cirby Way between Foothills Boulevard<br />
and Riverside Avenue, including a southbound bypass lane from Foothills<br />
to Roseville Road, Eastbound dual right lanes at Riverside Avenue, two<br />
lanes onto W/B I-80. STREET NAME: Cirby Way Widening 2009 $5,000,000<br />
<strong>2011</strong> <strong>MTIP</strong> - Page 327 of 423<br />
Completed Projects: Page 4 of 39