Appendix 5 - Completed, Deleted, and Delayed Projects<br />

Deleted Projects from the Previous 2009/12 <strong>MTIP</strong><br />

County Lead Agency Project ID Title Description Completion Year Total Cost<br />

Placer<br />

Placer<br />

Placer<br />

Placer<br />

Placer<br />

Placer<br />

Placer<br />

Placer<br />

Placer<br />

Town of Loomis Dept of<br />

Public Works<br />

PLA25254<br />

Del Oro High School / Taylor<br />

Rd. Signalization In Loomis, Del Oro High School and Taylor Rd.: signalize the intersection. 2013 $400,000<br />

In Loomis, construct new local road network as part of Grove subdivision<br />

Town of Loomis Dept of<br />

Grove Subdivision Local Road off of Humphrey Road. Federal permitting may be required as part of this<br />

Public Works<br />

PLA25289 Network<br />

project. 2015 $261,000<br />

Town of Loomis Dept of<br />

Horseshoe Bar Rd. Turn Lane In Loomis, Horseshoe Bar Rd. from Walnut Extension to Taylor Rd.: add<br />

Public Works<br />

PLA20920 & Bike Lanes<br />

1,000 feet of two-way left turn lane (for safety) and bike lanes. 20<strong>14</strong> $700,000<br />

Town of Loomis Dept of<br />

In Loomis, King Rd., from Sierra College Blvd. to Boyington Rd.: add turn<br />

Public Works PLA15250 King Rd. Turn Lane<br />

lane. 2015 $809,000<br />

In Loomis, construct new local road network as part of developing Orchard<br />

Town of Loomis Dept of<br />

Orchard Place Subdivision Place subdivision. Federal permitting may be required as part of this<br />

Public Works<br />

PLA25290 Local Road Network<br />

project. 2015 $191,400<br />

Town of Loomis Dept of<br />

Sierra College Blvd. /<br />

Public Works<br />

PLA25253 Bankhead Rd. Signal At Sierra College Blvd. and Bankhead Rd.: Signalize intersection. 2012 $300,000<br />

Town of Loomis Dept of<br />

Widen Sierra College Boulevard from 2 to 6 lanes from Granite Drive to<br />

Public Works PLA25119 Sierra College Boulevard RR tracks. 2008 $0<br />

Town of Loomis Dept of<br />

Taylor Road Bike and Turn In Loomis, Taylor Road from King Road to north town limits: add turn lane<br />

Public Works<br />

PLA20910 Lane<br />

and bike lanes. 2013 $690,000<br />

In Loomis, Taylor Road from south town limits to King Road: add signals at<br />

Town of Loomis Dept of<br />

three intersections, 2500 feet of two-way left turn lanes, bike lanes,<br />

Public Works PLA20900 Taylor Road Improvements sidewalk, curb, gutter and underground drainage system. 20<strong>14</strong> $1,600,000<br />

Sacramento<br />

Cal State University<br />

Sacramento SAC24159 Sac State Tram<br />

Sacramento Caltrans District 3 CAL18802 Truck Parking<br />

On the CSUS (California State University, Sacramento) campus, adjoining<br />

streets in Sacramento and the Sacramento Regional Transit District (RT)<br />

65th Street Light Rail and Bus Transfer Station. The project will design<br />

and ultimately implement a bus rapid transit system circulating within the<br />

campus with direct connection to the RT 65th Street Station. Funds<br />

requested in the 2006 STIP are for the PA&ED for the BRT runway, stops<br />

and vehicle specifications. Later phases will include final design,<br />

construction of facilities and vehicle acquisition. 2013 $924,000<br />

At Elkhorn and I-5, expand capacity from <strong>14</strong>-25 truck spaces and provide<br />

additional facilities 20<strong>14</strong> $1,080,000<br />

Sacramento City of Elk Grove SAC24305 Elk Grove Bus Rapid Transit<br />

On Big Horn Blvd. corridor: Construct dedicated lanes for a Bus Rapid<br />

Transit corridor. These lanes will be designed to lightrail specifications.<br />

Project will include six stations and three Bus Rapid Transit buses. <strong>2011</strong> $0<br />

Sacramento City of Elk Grove SAC24480 Elk Grove-Florin Rd Rehab<br />

Elk Grove-Florin Road from Elk Grove Blvd to Bond Road: Rehabilitate<br />

roadway. <strong>2011</strong> $660,400<br />

Sacramento City of Elk Grove SAC24457<br />

I-5/Elk Grove Blvd Northbound<br />

On Ramp<br />

At I-5 and Elk Grove Blvd: Restriping and other work related to moving the<br />

HOV lane to the inside left-most lane. 2010 $200,000<br />

City of Folsom Dept of<br />

Sacramento Public Works SAC24<strong>14</strong>8 East Natoma St Rehab East Natoma St, Blue Ravine Rd to Folsom Dam Rd: Rehabilitate road. 2012 $0<br />

City of Folsom Dept of<br />

Sacramento Public Works<br />

SAC24464<br />

Folsom Auburn Road/Oak<br />

Avenue Intersection<br />

Intersection modifications at Folsom Auburn Road/Oak Avenue including<br />

additional north bound left turn lane, eastbound right turn lane, and<br />

additional storage. 20<strong>14</strong> $1,320,000<br />

<strong>2011</strong> <strong>MTIP</strong> - Page 348 of 423<br />

Deleted Projects: Page 25 of 39