Final 2011/14 MTIP - sacog
Final 2011/14 MTIP - sacog
Final 2011/14 MTIP - sacog
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Appendix 10<br />
Yolo<br />
Yolo<br />
Yolo<br />
Yolo<br />
Yolo<br />
Yolo<br />
Yolo<br />
Yolo<br />
Yolo<br />
Yolo<br />
County Lead Agency Project ID<br />
City of West Sacramento<br />
Dept of Public Works YOL19227 VAR79047<br />
Grouped Cat.<br />
ID Title Description<br />
West Capitol Avenue<br />
Streetscape Improvements -<br />
Phase 2<br />
City of Winters Dept of<br />
Public Works YOL19264 VAR79039<br />
Downtown Streetscape<br />
Improvements Phases 1 & 2<br />
City of Winters Dept of<br />
Public Works YOL19280 VAR79030 Pedestrian Connections<br />
In West Sacramento on West Capitol Avenue from Jefferson Boulevard to<br />
Westacre Road, construction of streetscape improvements, including wider<br />
sidewalks, flatter road cross-section, reconfigure lanes, utility relocation,<br />
new lighting, and substantial planting and hardscape treatments. 2013 $5,860,000<br />
Completion<br />
Year Total Cost Exempt Cat. Grouped Cat.<br />
Transportation enhancement<br />
activities (except rehabilitation<br />
and operation of historic<br />
transportation buildings, Grouped Projects for Transportation<br />
structures or facilities)<br />
enhancement activities<br />
In Winters: Improvements to the Downtown Core including, full sidewalk<br />
bulb-outs, enhanced crosswalks, seat walls or aesthetic barriers,<br />
landscaping and irrigation, street furniture, signage, lightening<br />
enhancements, and enhancements for safety and storm drainage. <strong>2011</strong> $1,795,000 Plantings, landscaping, etc.<br />
South side of SR 128 (Grant Ave.), from St. Anthony Parish Hall driveway<br />
to West Main St.: fill in missing sidewalks 2012 $111,500 Bicycle and pedestrian facilities<br />
In Winters, Railroad Avenue from Anderson Avenue to Niemann Street:<br />
pavement overlay, curb, gutter, and sidewalk repairs, new curb, gutter, and<br />
sidewalk, and accessibility improvements. It does not involve any utility<br />
Pavement resurfacing and/or<br />
rehabilitation work. 2012 $400,000 rehabilitation<br />
City of Winters Dept of<br />
Public Works YOL17725 VAR79017 Railroad Avenue Rehabilitation<br />
City of Woodland Dept of<br />
Public Works YOL17330 County Road 102 CR 102: Between Kentucky Ave to Beamer St: widen from 2 to 4 lanes. 2015 $2,896,851<br />
City of Woodland Dept of<br />
Public Works YOL19281 VAR79047 Downtown Streetscape<br />
City of Woodland Dept of<br />
Public Works YOL17300 I-5 / CR 102 Interchange<br />
City of Woodland Dept of<br />
Public Works YOL19283 VAR79017<br />
Kentucky Ave. Rehabilitation<br />
and Bike Lane Gap Closure<br />
City of Woodland Dept of<br />
Public Works YOL17570 VAR79063<br />
Lemen Ave. and North St.<br />
Realignment<br />
City of Woodland Dept of<br />
Public Works YOL17270 Pioneer Ave<br />
Transportation enhancement<br />
activities (except rehabilitation<br />
Main St., between Third St. and Sixth St.: Construct streetscape<br />
improvements, including improved sidewalks, landscaping, trees, bulb-outs,<br />
A.D.A. ramps, a pedestrian actuated signal, etc. 2015<br />
and operation of historic<br />
transportation buildings,<br />
$1,115,001 structures or facilities)<br />
Reconstruct interchange on I-5 at County Road 102 including overcrossing<br />
of I-5. 2012 $16,205,459<br />
In the City of Woodland, 1/4 mile of Kentucky Ave., from East St. to Harter<br />
Ave.: reconstruct pavement, install signing, restripe vehicle and bicycle<br />
Pavement resurfacing and/or<br />
lanes. 20<strong>14</strong> $817,000 rehabilitation<br />
In Woodland, Lemen Avenue and North Street at East Street: realign<br />
Lemen Avenue to connect with North Street at East Street (Phase 1).<br />
(Emission Benefits in kg/day: 0.04 ROG, 0.04 NOx, 0.01 PM10, and 0.07<br />
CO) <strong>2011</strong> $2,230,167<br />
Changes in vertical and horizontal<br />
alignment<br />
Widen Pioneer Ave. from 2 to 4 lanes between Gibson Road and Heritage<br />
Parkway Drive. 2013 $3,338,450<br />
Specific activities which do not<br />
involve or lead directly to<br />
construction, such as: planning<br />
and technical studies, grants for<br />
training and research programs,<br />
planning activities conducted<br />
pursuant to titles 23 and 49<br />
U.S.c., and Federal-aid systems<br />
revisions<br />
Construct two-lane road from Mace Blvd. to federally supported Pacific<br />
Flyway wildlife area. HPP #867 <strong>2011</strong> $1,160,000<br />
Yolo SACOG YOL17010 VAR79046 Yolo County PPM Plan, program and monitor for Yolo County. 2015 $664,000<br />
U.S. Fish and Wildlife<br />
Mace Bird Reserve Access<br />
Yolo Service<br />
VAR192<strong>14</strong><br />
Road<br />
Yolo<br />
Yolo<br />
Yolo<br />
Yolo<br />
Yolo<br />
University of California<br />
Davis UCD10000 VAR79047<br />
University Transport<br />
System UNI10464 VAR79065<br />
University Transport<br />
System UNI10465 VAR79051<br />
University Transport<br />
System UNI10360 VAR79050<br />
University Transport<br />
System UNI10467 VAR79054<br />
Hutchison Corridor Complete<br />
Street<br />
UC Davis Memorial Union<br />
Terminal Improvement<br />
Unitrans Bus Stop Access and<br />
Passenger Amenties<br />
Unitrans Hutchison Corridor<br />
Improvements<br />
Unitrans Miscellaneous Capital<br />
Improvements for Ops<br />
Transportation enhancement<br />
activities (except rehabilitation<br />
UC Davis Campus, Hutchison Dr., from California Ave. to A St.: remove an<br />
S-curve and construct adequate road section of increased transit usage,<br />
new sidewalks and circulation modifications. 2016<br />
and operation of historic<br />
transportation buildings,<br />
$1,455,001 structures or facilities)<br />
Major overhaul to the MU terminal to provide operational and passenger<br />
amenity improvements, in particular to accommodate a higher volume of 40-<br />
foot buses as are operated now (compared to smaller buses being<br />
operated when the terminal was first used in the 1970s). Project will also<br />
provide for improved regional connections with YoloBus and FAST routes<br />
which serve the terminal. 2016 $2,262,500 Bus terminals and transfer points<br />
Unitrans bus stop improvements, accessibility, and passenger amenities,<br />
including real-time information. Implement real-time Automatic Vehicle<br />
Location, Automatic Passenger Counter, Computer Aided Dispatching and<br />
Construction of small passenger<br />
other related ITS elements. 2018 $1,310,000 shelters and information kiosks<br />
Upgrade bus transit center at UC Davis (Hutchison Corridor), including offstreet<br />
berths, shelter, landscaping, bike racks, and signage, with no land<br />
acquisition or roadway capacity increase. 2012 $1,849,483<br />
Reconstruction or renovation of<br />
transit buildings and structures<br />
(e.g., rail or bus buildings, storage<br />
and maintenance facilities,<br />
stations, terminals, and ancillary<br />
structures)<br />
Purchase of office, shop, and<br />
Office, shop, operating equipment, facility, security enhancements, and nonrevenue<br />
vehicles for existing facilities. 2015<br />
operating equipment for existing<br />
$492,000 facilities<br />
Grouped Projects for Plantings,<br />
landscaping, etc.<br />
Grouped Projects for Bicycle and<br />
pedestrian facilities<br />
Grouped Projects for Pavement<br />
resurfacing and/or rehabilitation<br />
Grouped Projects for Transportation<br />
enhancement activities<br />
Grouped Projects for Pavement<br />
resurfacing and/or rehabilitation<br />
Grouped Projects for Changes in<br />
Vertical and Horizontal Alignment<br />
Grouped Projects for Activities that do<br />
not lead to construction<br />
Grouped Projects for Transportation<br />
enhancement activities<br />
Grouped Projects for Bus Terminals and<br />
Transfer Points<br />
Grouped Projects for Construction of<br />
small passenger shelters and<br />
information kiosks<br />
Grouped Projects for Reconstruction or<br />
renovation of transit buildings and<br />
structures<br />
Grouped Projects for Purchase of<br />
office, shop, and operating equipment<br />
for existing facilities<br />
<strong>2011</strong> <strong>MTIP</strong> - Page 411 of 423<br />
Page 32 of 37