19.06.2014 Views

Final 2011/14 MTIP - sacog

Final 2011/14 MTIP - sacog

Final 2011/14 MTIP - sacog

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Appendix 10<br />

Yolo<br />

Yolo<br />

Yolo<br />

Yolo<br />

Yolo<br />

Yolo<br />

Yolo<br />

Yolo<br />

Yolo<br />

Yolo<br />

County Lead Agency Project ID<br />

City of West Sacramento<br />

Dept of Public Works YOL19227 VAR79047<br />

Grouped Cat.<br />

ID Title Description<br />

West Capitol Avenue<br />

Streetscape Improvements -<br />

Phase 2<br />

City of Winters Dept of<br />

Public Works YOL19264 VAR79039<br />

Downtown Streetscape<br />

Improvements Phases 1 & 2<br />

City of Winters Dept of<br />

Public Works YOL19280 VAR79030 Pedestrian Connections<br />

In West Sacramento on West Capitol Avenue from Jefferson Boulevard to<br />

Westacre Road, construction of streetscape improvements, including wider<br />

sidewalks, flatter road cross-section, reconfigure lanes, utility relocation,<br />

new lighting, and substantial planting and hardscape treatments. 2013 $5,860,000<br />

Completion<br />

Year Total Cost Exempt Cat. Grouped Cat.<br />

Transportation enhancement<br />

activities (except rehabilitation<br />

and operation of historic<br />

transportation buildings, Grouped Projects for Transportation<br />

structures or facilities)<br />

enhancement activities<br />

In Winters: Improvements to the Downtown Core including, full sidewalk<br />

bulb-outs, enhanced crosswalks, seat walls or aesthetic barriers,<br />

landscaping and irrigation, street furniture, signage, lightening<br />

enhancements, and enhancements for safety and storm drainage. <strong>2011</strong> $1,795,000 Plantings, landscaping, etc.<br />

South side of SR 128 (Grant Ave.), from St. Anthony Parish Hall driveway<br />

to West Main St.: fill in missing sidewalks 2012 $111,500 Bicycle and pedestrian facilities<br />

In Winters, Railroad Avenue from Anderson Avenue to Niemann Street:<br />

pavement overlay, curb, gutter, and sidewalk repairs, new curb, gutter, and<br />

sidewalk, and accessibility improvements. It does not involve any utility<br />

Pavement resurfacing and/or<br />

rehabilitation work. 2012 $400,000 rehabilitation<br />

City of Winters Dept of<br />

Public Works YOL17725 VAR79017 Railroad Avenue Rehabilitation<br />

City of Woodland Dept of<br />

Public Works YOL17330 County Road 102 CR 102: Between Kentucky Ave to Beamer St: widen from 2 to 4 lanes. 2015 $2,896,851<br />

City of Woodland Dept of<br />

Public Works YOL19281 VAR79047 Downtown Streetscape<br />

City of Woodland Dept of<br />

Public Works YOL17300 I-5 / CR 102 Interchange<br />

City of Woodland Dept of<br />

Public Works YOL19283 VAR79017<br />

Kentucky Ave. Rehabilitation<br />

and Bike Lane Gap Closure<br />

City of Woodland Dept of<br />

Public Works YOL17570 VAR79063<br />

Lemen Ave. and North St.<br />

Realignment<br />

City of Woodland Dept of<br />

Public Works YOL17270 Pioneer Ave<br />

Transportation enhancement<br />

activities (except rehabilitation<br />

Main St., between Third St. and Sixth St.: Construct streetscape<br />

improvements, including improved sidewalks, landscaping, trees, bulb-outs,<br />

A.D.A. ramps, a pedestrian actuated signal, etc. 2015<br />

and operation of historic<br />

transportation buildings,<br />

$1,115,001 structures or facilities)<br />

Reconstruct interchange on I-5 at County Road 102 including overcrossing<br />

of I-5. 2012 $16,205,459<br />

In the City of Woodland, 1/4 mile of Kentucky Ave., from East St. to Harter<br />

Ave.: reconstruct pavement, install signing, restripe vehicle and bicycle<br />

Pavement resurfacing and/or<br />

lanes. 20<strong>14</strong> $817,000 rehabilitation<br />

In Woodland, Lemen Avenue and North Street at East Street: realign<br />

Lemen Avenue to connect with North Street at East Street (Phase 1).<br />

(Emission Benefits in kg/day: 0.04 ROG, 0.04 NOx, 0.01 PM10, and 0.07<br />

CO) <strong>2011</strong> $2,230,167<br />

Changes in vertical and horizontal<br />

alignment<br />

Widen Pioneer Ave. from 2 to 4 lanes between Gibson Road and Heritage<br />

Parkway Drive. 2013 $3,338,450<br />

Specific activities which do not<br />

involve or lead directly to<br />

construction, such as: planning<br />

and technical studies, grants for<br />

training and research programs,<br />

planning activities conducted<br />

pursuant to titles 23 and 49<br />

U.S.c., and Federal-aid systems<br />

revisions<br />

Construct two-lane road from Mace Blvd. to federally supported Pacific<br />

Flyway wildlife area. HPP #867 <strong>2011</strong> $1,160,000<br />

Yolo SACOG YOL17010 VAR79046 Yolo County PPM Plan, program and monitor for Yolo County. 2015 $664,000<br />

U.S. Fish and Wildlife<br />

Mace Bird Reserve Access<br />

Yolo Service<br />

VAR192<strong>14</strong><br />

Road<br />

Yolo<br />

Yolo<br />

Yolo<br />

Yolo<br />

Yolo<br />

University of California<br />

Davis UCD10000 VAR79047<br />

University Transport<br />

System UNI10464 VAR79065<br />

University Transport<br />

System UNI10465 VAR79051<br />

University Transport<br />

System UNI10360 VAR79050<br />

University Transport<br />

System UNI10467 VAR79054<br />

Hutchison Corridor Complete<br />

Street<br />

UC Davis Memorial Union<br />

Terminal Improvement<br />

Unitrans Bus Stop Access and<br />

Passenger Amenties<br />

Unitrans Hutchison Corridor<br />

Improvements<br />

Unitrans Miscellaneous Capital<br />

Improvements for Ops<br />

Transportation enhancement<br />

activities (except rehabilitation<br />

UC Davis Campus, Hutchison Dr., from California Ave. to A St.: remove an<br />

S-curve and construct adequate road section of increased transit usage,<br />

new sidewalks and circulation modifications. 2016<br />

and operation of historic<br />

transportation buildings,<br />

$1,455,001 structures or facilities)<br />

Major overhaul to the MU terminal to provide operational and passenger<br />

amenity improvements, in particular to accommodate a higher volume of 40-<br />

foot buses as are operated now (compared to smaller buses being<br />

operated when the terminal was first used in the 1970s). Project will also<br />

provide for improved regional connections with YoloBus and FAST routes<br />

which serve the terminal. 2016 $2,262,500 Bus terminals and transfer points<br />

Unitrans bus stop improvements, accessibility, and passenger amenities,<br />

including real-time information. Implement real-time Automatic Vehicle<br />

Location, Automatic Passenger Counter, Computer Aided Dispatching and<br />

Construction of small passenger<br />

other related ITS elements. 2018 $1,310,000 shelters and information kiosks<br />

Upgrade bus transit center at UC Davis (Hutchison Corridor), including offstreet<br />

berths, shelter, landscaping, bike racks, and signage, with no land<br />

acquisition or roadway capacity increase. 2012 $1,849,483<br />

Reconstruction or renovation of<br />

transit buildings and structures<br />

(e.g., rail or bus buildings, storage<br />

and maintenance facilities,<br />

stations, terminals, and ancillary<br />

structures)<br />

Purchase of office, shop, and<br />

Office, shop, operating equipment, facility, security enhancements, and nonrevenue<br />

vehicles for existing facilities. 2015<br />

operating equipment for existing<br />

$492,000 facilities<br />

Grouped Projects for Plantings,<br />

landscaping, etc.<br />

Grouped Projects for Bicycle and<br />

pedestrian facilities<br />

Grouped Projects for Pavement<br />

resurfacing and/or rehabilitation<br />

Grouped Projects for Transportation<br />

enhancement activities<br />

Grouped Projects for Pavement<br />

resurfacing and/or rehabilitation<br />

Grouped Projects for Changes in<br />

Vertical and Horizontal Alignment<br />

Grouped Projects for Activities that do<br />

not lead to construction<br />

Grouped Projects for Transportation<br />

enhancement activities<br />

Grouped Projects for Bus Terminals and<br />

Transfer Points<br />

Grouped Projects for Construction of<br />

small passenger shelters and<br />

information kiosks<br />

Grouped Projects for Reconstruction or<br />

renovation of transit buildings and<br />

structures<br />

Grouped Projects for Purchase of<br />

office, shop, and operating equipment<br />

for existing facilities<br />

<strong>2011</strong> <strong>MTIP</strong> - Page 411 of 423<br />

Page 32 of 37

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!