19.06.2014 Views

Final 2011/14 MTIP - sacog

Final 2011/14 MTIP - sacog

Final 2011/14 MTIP - sacog

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Sacramento Area Council of Governments<br />

Appendix 4 Detail Listing of Grouped Projects<br />

SACOG ID<br />

VAR79030 -<br />

ELD19173 El Dorado County Lead Agency El Dorado County Dept of Transportation<br />

SACOG ID #<br />

Project Title<br />

Project Description<br />

EA Number<br />

Last Revised<br />

Completion Year<br />

ELD19173 03-2E470 11-00 2020<br />

US 50/El Dorado Hills Blvd Pedestrian Overcrossing<br />

Construct ped/bike overcrossing over US 50 just east<br />

of El Dorado Hills Blvd Interchange; includes a Class<br />

3 mixed-use path; Construction and ROW aquisition<br />

for 10-ft wide sidewalk and adjacent retaining walls,<br />

barriers, railings and landscape replacement included<br />

with CIP71323 (see ELD15630). CIP71340<br />

Fiscal Year Revenue Source Engineering Right of Way Construction Total Revenue<br />

<strong>14</strong><br />

$125,000 $6,240,000 $6,365,000<br />

$499,900 $125,900 $6,240,000 $6,865,800<br />

Federal Project<br />

Total Cost $6,865,800<br />

Exempt<br />

Category:<br />

Bicycle and pedestrian facilities<br />

SACOG ID<br />

VAR79030 -<br />

PLA25471 Placer County Lead Agency City of Auburn Dept. of Public Works<br />

SACOG ID # EA Number Last Revised Completion Year<br />

PLA25471 n/a<br />

11-00 2013<br />

Project Title<br />

Nevada Street Pedetrian & Bicycle Facilities<br />

Fiscal Year Revenue Source Engineering Right of Way Construction Total Revenue<br />

2013 Congestion Mitigation and Air Quality<br />

$65,000 $328,539 $393,539<br />

2013 Local Transportation Fund<br />

$8,420 $42,567 $50,987<br />

$73,420<br />

$0 $371,106 $444,526<br />

Project Description<br />

Class 2 bike lane and adjacent sidewalks along<br />

Nevada St from Placer St to Fulweiler Ave to allow for<br />

continuous pedestrian and bicycle access from Old<br />

Town Auburn to the Auburn Station and EV Cain<br />

Middle School. Emission reduction benefits (kg/day):<br />

ROG 0.03, NOx 0.02, PM10 0.01.<br />

Federal Project<br />

Total Cost $444,526<br />

Exempt<br />

Category:<br />

Bicycle and pedestrian facilities<br />

<strong>2011</strong> <strong>MTIP</strong> - Page <strong>14</strong>8 of 423<br />

Page 13<br />

Monday, September 27, 2010

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!