Appendix 5 - Completed, Deleted, and Delayed Projects<br />

Completed Projects from the Previous 2009/12 <strong>MTIP</strong><br />

County Lead Agency Project ID Title Description Completion Year Total Cost<br />

Placer<br />

Placer<br />

Placer<br />

City of Roseville Dept of<br />

Douglas Blvd / Sierra College<br />

In Roseville, at Douglas Blvd & Sierra College Blvd, install E/B & W/B dual<br />

left-turn lanes, relocate medians, micro-pave intersection approaches and<br />

Public Works<br />

PLA25360 Blvd Intersection Improvements restripe E/B & W/B Douglas Blvd. 2009 $295,713<br />

City of Roseville Dept of<br />

Public Works PLA25367 East Roseville ITS At various locations in east Roseville, convert ITS equipment. 2010 $500,000<br />

City of Roseville Dept of<br />

East Roseville ITS<br />

In Roseville, Install fiber on Sierra College Blvd, ITS equipment at various<br />

Public Works<br />

PLA25369 Coordination<br />

locations, install signal loops and changeable message signs. 2009 $1,300,000<br />

Placer<br />

Placer<br />

City of Roseville Dept of<br />

Public Works<br />

City of Roseville Dept of<br />

Public Works<br />

PLA19960<br />

PLA25363<br />

I-80 to Royer Park Bikeway<br />

Phase 2 - Segment 1<br />

Mahany ITS Equipment<br />

Conversions<br />

Roseville, Harding Blvd. @ Dry Creek, I-80 to Royer Park: construct class<br />

1 bikeway in 2 phases. Phase I from I-80 to Harding completed in 2004<br />

(PLA20870). This is phase 2 from Harding Blvd. to Royer Park. Local<br />

funds include TCSP funds of $268,717. Funding shown includes phases 1<br />

& 2. (Emission benefits in kg/day: 0.25 ROG, 0.2 NOx 0.09 PM10) 2010 $3,737,124<br />

In Roseville, implement upgrades to the traffic signal control system as<br />

outlined in the Intelligent Transportation System (ITS) Master Plan. This<br />

includes installation of ITS equipment between Roseville Civic Center and<br />

Mahany EOC. (Equipment includes signal controller cabinets.) (Emission<br />

Benefits in kg/day: 0.91 ROG, 0.91 NOx) 2010 $537,990<br />

Placer<br />

Placer<br />

City of Roseville Dept of<br />

Public Works<br />

City of Roseville Dept of<br />

Public Works<br />

PLA25028<br />

PLA25383<br />

Riverside Avenue Revitalization<br />

Phase 1<br />

Riverside Avenue Revitalization<br />

Phase 2<br />

Riverside Ave. from Douglas Blvd. to Darling Way; develop project area<br />

specific plan and install sidewalk and transit improvements. Project is part<br />

of an overall goal to create a pedestrian friendly downtown environment.<br />

(Emission Benefits in kg/day: 10 NOx, 9 ROG, 2 PM10) 2010 $1,364,976<br />

Riverside Ave. from Douglas Blvd. to Darling Way; add additional<br />

streetscape improvements including landscape, lighting, signage, street<br />

furniture, and specialty pavement; and rehabilitate water, sewer, curb,<br />

gutter. (Phase 1 is PLA25028) 2010 $8,225,024<br />

Placer<br />

Placer<br />

Placer<br />

Placer<br />

Placer<br />

City of Roseville Dept of<br />

Public Works PLA25389 Road Rehab Stimulus<br />

In Roseville, On Junction Blvd., from Woodcreek Oaks Blvd. to Foothills<br />

Blvd., on Woodcreek Oaks Blvd., from Baseline Rd. to Junction Blvd. and<br />

from Canavari Dr. to N. City Limits, and on Eureka Road from Douglas to<br />

Sierra College: Place Hot Mix Asphalt (HMA) on roadways. 2010 $1,356,173<br />

In Roseville, implement upgrades to the traffic signal system as outlined in<br />

the Intelligent Transportation System (ITS) Master Plan. This includes<br />

installing fiber optic cable and conduit along Roseville Parkway from<br />

Pleasant Grove Blvd to Reserve Dr. (Emission benefits in kg/day: 1.02<br />

ROG, 1.02 NOx) 2009 $91,481<br />

City of Roseville Dept of<br />

Public Works PLA25365 Roseville Parkway ITS<br />

City of Roseville Dept of<br />

Public Works PLA25029 Roseville Roadway Resurfacing Asphalt resurfacing of various roadways in Roseville. 2009 $1,600,000<br />

City of Roseville Dept of<br />

Roseville Transit ARRA Allocation of 10% Operating Assistance of ARRA Sacramento Urbanized<br />

Public Works<br />

PLA25424 Operating Assistance Area funding. 2010 $135,000<br />

City of Roseville Dept of<br />

Roseville Transit Commuter Purchase two expansion 40' commuter buses to implement new commuter<br />

Public Works<br />

PLA25372 Bus Purchase<br />

service to the 50 Corridor. 2010 $677,736<br />

<strong>2011</strong> <strong>MTIP</strong> - Page 328 of 423<br />

Completed Projects: Page 5 of 39