Final 2011/14 MTIP - sacog
Final 2011/14 MTIP - sacog
Final 2011/14 MTIP - sacog
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Appendix 5 - Completed, Deleted, and Delayed Projects<br />
County Lead Agency Project ID Title Description Completion Year Total Cost<br />
El Dorado Caltrans District 3 CAL18837 ED-50 Increase Superelevation<br />
El Dorado County, near Strawberry, from 0.5 to 0.8 mile east of Pyramid<br />
Creek Bridge - Increase superelevation of curve (PM 60.2/60.5). 2009 $2,109,998<br />
El Dorado Caltrans District 3 CAL18837 ED-50 Increase Superelevation<br />
El Dorado County, near Strawberry, from 0.5 to 0.8 mile east of Pyramid<br />
Creek Bridge - Increase superelevation of curve (PM 60.2/60.5). 2009 $2,109,998<br />
El Dorado Caltrans District 3 CAL18785<br />
Placerville Ops Mitigation<br />
Landscaping<br />
Mitigation Landscaping in El Dorado County (PM 16.7 - 18.1)for Project<br />
CAL16161. 2010 $720,000<br />
El Dorado Caltrans District 3 CAL19274<br />
US 50 / Still Meadows Rd ITS<br />
Improvements<br />
In the Camino Corridor of US 50, construct ITS infrastructure at the<br />
intersection of US 50 and Still Meadows Road. This is a safety project and<br />
is related to the larger Camino safety and operational improvements<br />
project (CAL18190). 2010 $651,000<br />
Rehabilitate Hocking Street from Mosquito Road to Morrene Drive, and<br />
El Dorado<br />
City of Placerville Dept of<br />
Public Works<br />
ELD19299<br />
Completed Projects from the Previous 2009/12 <strong>MTIP</strong><br />
ARRA Road Rehab - Hocking &<br />
Morrene<br />
Morrene Drive from Hocking Street to Giovanni Drive and complete<br />
necessary ADA improvements near Carson and Cold Springs Roads. 2010 $260,784<br />
El Dorado<br />
El Dorado<br />
El Dorado<br />
El Dorado<br />
City of Placerville Dept of<br />
Public Works<br />
ELD16070<br />
Mosquito Rd./ Clay St. Park &<br />
Bus<br />
City of Placerville Dept of<br />
Public Works ELD12100 Placerville Road Rehabiliation<br />
City of Placerville Dept of<br />
Public Works ELD19280 Road Rehab Stimulus<br />
City of Placerville Dept of<br />
Public Works ELD19261 School Zone SRTS<br />
Phase II - Construct an additional 50-car parking lot with lighting<br />
landscaping, install public restrooms, and install the El Dorado Trail facility 2010 $1,450,000<br />
In Placerville, various locations: rehabilitate roads -arterials, collectors and<br />
transit routes. STREET NAME: Placerville Road Rehabiliation 2007 $2,450,000<br />
Cold Springs Rd, from Placerville City Limit to Placerville Dr; Carson Rd<br />
from US 50 overcrossing to Placerville City Limit: Rehabilitate roadways. 2010 $507,000<br />
In Placerville, Install four radar speed feedback signs and two in-road<br />
crosswalk lighting systems in two of the most challenging K-8th grade<br />
school zones: 1) Markam Middle School and 2) Schnell Elementary<br />
School. Safe Routes to School ID SRTSD03_0008 2010 $167,211<br />
El Dorado<br />
El Dorado<br />
El Dorado<br />
El Dorado County Dept of<br />
Transportation<br />
El Dorado County Dept of<br />
Transportation<br />
El Dorado County Dept of<br />
Transportation<br />
ELD19172<br />
ELD15230<br />
ELD19297<br />
El Dorado Trail - Forni Rd to<br />
Missouri Flat Rd<br />
Latrobe Rd Widening - Suncast<br />
to Golden Foothill<br />
Latrobe Rd/Cothrin Ranch to S.<br />
Shingle - Road Rehab<br />
Construct Class I mixed-use bike/ped path and equestrian trail within the<br />
Sacramento-Placerville Transportation Corridor (SPTC) from Forni Rd to<br />
Missouri Flat Rd; includes addition of new timber decking and railings to<br />
Weber Creek railroad trestle converting it to a bridge crossing. CIP71380 2009 $1,945,875<br />
Widen Latrobe Rd from Suncast Ln south to Golden Foothill Pkwy from 2-<br />
lanes undivided to 4-lanes divided; includes partial realignment of Latrobe<br />
Rd with new bridge over Carson Creek and widen for left-turn into West<br />
Valley subdivision. CIP72403 2010 $11,675,900<br />
Asphalt concrete overlay on Latrobe Rd from Cothrin Ranch Rd to South<br />
Shingle Rd (3.7 miles). CIP72182 2010 $1,185,089<br />
El Dorado<br />
El Dorado County Dept of<br />
Transportation ELD19281 Road Rehab (ARRA Stimulus)<br />
Contract overlays on 4 County roads: 1) Forni Rd from Gold Nugget Wy to<br />
Placerville Dr (0.70 miles) CIP72181, 2) Lotus Rd from Wunschel Ln to<br />
State Route 49 (6.66 miles) CIP72177, 3) Malcolm Dixon Rd from Salmon<br />
Falls Rd to Green Valley Rd (2.04 miles) CIP72180, 4) Pony Express Trail<br />
from Ridgeway Dr to Crystal Springs Rd (2.25 miles) CIP72166. 2009 $3,058,593<br />
<strong>2011</strong> <strong>MTIP</strong> - Page 324 of 423<br />
Completed Projects: Page 1 of 39