19.06.2014 Views

Final 2011/14 MTIP - sacog

Final 2011/14 MTIP - sacog

Final 2011/14 MTIP - sacog

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Appendix 5 - Completed, Deleted, and Delayed Projects<br />

County Lead Agency Project ID Title Description Completion Year Total Cost<br />

El Dorado Caltrans District 3 CAL18837 ED-50 Increase Superelevation<br />

El Dorado County, near Strawberry, from 0.5 to 0.8 mile east of Pyramid<br />

Creek Bridge - Increase superelevation of curve (PM 60.2/60.5). 2009 $2,109,998<br />

El Dorado Caltrans District 3 CAL18837 ED-50 Increase Superelevation<br />

El Dorado County, near Strawberry, from 0.5 to 0.8 mile east of Pyramid<br />

Creek Bridge - Increase superelevation of curve (PM 60.2/60.5). 2009 $2,109,998<br />

El Dorado Caltrans District 3 CAL18785<br />

Placerville Ops Mitigation<br />

Landscaping<br />

Mitigation Landscaping in El Dorado County (PM 16.7 - 18.1)for Project<br />

CAL16161. 2010 $720,000<br />

El Dorado Caltrans District 3 CAL19274<br />

US 50 / Still Meadows Rd ITS<br />

Improvements<br />

In the Camino Corridor of US 50, construct ITS infrastructure at the<br />

intersection of US 50 and Still Meadows Road. This is a safety project and<br />

is related to the larger Camino safety and operational improvements<br />

project (CAL18190). 2010 $651,000<br />

Rehabilitate Hocking Street from Mosquito Road to Morrene Drive, and<br />

El Dorado<br />

City of Placerville Dept of<br />

Public Works<br />

ELD19299<br />

Completed Projects from the Previous 2009/12 <strong>MTIP</strong><br />

ARRA Road Rehab - Hocking &<br />

Morrene<br />

Morrene Drive from Hocking Street to Giovanni Drive and complete<br />

necessary ADA improvements near Carson and Cold Springs Roads. 2010 $260,784<br />

El Dorado<br />

El Dorado<br />

El Dorado<br />

El Dorado<br />

City of Placerville Dept of<br />

Public Works<br />

ELD16070<br />

Mosquito Rd./ Clay St. Park &<br />

Bus<br />

City of Placerville Dept of<br />

Public Works ELD12100 Placerville Road Rehabiliation<br />

City of Placerville Dept of<br />

Public Works ELD19280 Road Rehab Stimulus<br />

City of Placerville Dept of<br />

Public Works ELD19261 School Zone SRTS<br />

Phase II - Construct an additional 50-car parking lot with lighting<br />

landscaping, install public restrooms, and install the El Dorado Trail facility 2010 $1,450,000<br />

In Placerville, various locations: rehabilitate roads -arterials, collectors and<br />

transit routes. STREET NAME: Placerville Road Rehabiliation 2007 $2,450,000<br />

Cold Springs Rd, from Placerville City Limit to Placerville Dr; Carson Rd<br />

from US 50 overcrossing to Placerville City Limit: Rehabilitate roadways. 2010 $507,000<br />

In Placerville, Install four radar speed feedback signs and two in-road<br />

crosswalk lighting systems in two of the most challenging K-8th grade<br />

school zones: 1) Markam Middle School and 2) Schnell Elementary<br />

School. Safe Routes to School ID SRTSD03_0008 2010 $167,211<br />

El Dorado<br />

El Dorado<br />

El Dorado<br />

El Dorado County Dept of<br />

Transportation<br />

El Dorado County Dept of<br />

Transportation<br />

El Dorado County Dept of<br />

Transportation<br />

ELD19172<br />

ELD15230<br />

ELD19297<br />

El Dorado Trail - Forni Rd to<br />

Missouri Flat Rd<br />

Latrobe Rd Widening - Suncast<br />

to Golden Foothill<br />

Latrobe Rd/Cothrin Ranch to S.<br />

Shingle - Road Rehab<br />

Construct Class I mixed-use bike/ped path and equestrian trail within the<br />

Sacramento-Placerville Transportation Corridor (SPTC) from Forni Rd to<br />

Missouri Flat Rd; includes addition of new timber decking and railings to<br />

Weber Creek railroad trestle converting it to a bridge crossing. CIP71380 2009 $1,945,875<br />

Widen Latrobe Rd from Suncast Ln south to Golden Foothill Pkwy from 2-<br />

lanes undivided to 4-lanes divided; includes partial realignment of Latrobe<br />

Rd with new bridge over Carson Creek and widen for left-turn into West<br />

Valley subdivision. CIP72403 2010 $11,675,900<br />

Asphalt concrete overlay on Latrobe Rd from Cothrin Ranch Rd to South<br />

Shingle Rd (3.7 miles). CIP72182 2010 $1,185,089<br />

El Dorado<br />

El Dorado County Dept of<br />

Transportation ELD19281 Road Rehab (ARRA Stimulus)<br />

Contract overlays on 4 County roads: 1) Forni Rd from Gold Nugget Wy to<br />

Placerville Dr (0.70 miles) CIP72181, 2) Lotus Rd from Wunschel Ln to<br />

State Route 49 (6.66 miles) CIP72177, 3) Malcolm Dixon Rd from Salmon<br />

Falls Rd to Green Valley Rd (2.04 miles) CIP72180, 4) Pony Express Trail<br />

from Ridgeway Dr to Crystal Springs Rd (2.25 miles) CIP72166. 2009 $3,058,593<br />

<strong>2011</strong> <strong>MTIP</strong> - Page 324 of 423<br />

Completed Projects: Page 1 of 39

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!