Appendix 10<br />
County Lead Agency Project ID<br />
Grouped Cat.<br />
ID Title Description<br />
Completion<br />
Year Total Cost Exempt Cat. Grouped Cat.<br />
City of Galt Dept of Public<br />
Preventive Maintenance for<br />
Grouped Projects for Rehabilitation of<br />
Sacramento Works SAC24448 VAR79055 SCTLink Fleet Provide preventive maintenance of SCTLink vehicles. <strong>2011</strong> $156,854 Rehabilitation of transit vehicles transit vehicles<br />
Widening narrow pavements or Grouped Projects for Widening narrow<br />
City of Galt Dept of Public<br />
Simmerhorn Road Overcrossing In Galt: Simmerhorn Road overcrossing of SR 99; Construct realigned<br />
reconstructing bridges (no pavements or reconstructing bridges<br />
Sacramento Works SAC24165 VAR79020 Replacement<br />
overcrossing. 2018 $4,450,000 additional travel lanes)<br />
(no additional travel lanes<br />
Sacramento<br />
Sacramento<br />
Sacramento<br />
City of Galt Dept of Public<br />
Works SAC24343 VAR79051<br />
South County Transit Bus Stop<br />
Shelters<br />
City of Galt Dept of Public<br />
Works SAC20580 SR 99 Central Galt Interchange<br />
City of Galt Dept of Public<br />
Works SAC24338 VAR79020 Twin Cities Road Widening<br />
Installation of bus stop shelters at 3 key locations for the SCTLink demand<br />
response service in the City of Galt. <strong>2011</strong><br />
Construction of small passenger<br />
$70,000 shelters and information kiosks<br />
In Galt: A & C Streets, Boessow Road at SR 99; Replace existing C Street<br />
interchange at SR 99 with new 6 lane overcrossings (4 through lanes and<br />
left-turn channelization) at C Street and A Street. Reconstruct all on/off<br />
ramps. Realign connector streets. HPP #1257 2013 $50,641,711<br />
In Galt: Twin Cities Road to Bergeron Road; Widen 330 linear feet of Twin<br />
Widening narrow pavements or<br />
Cities Rd between E. Stockton Blvd and Bergeron Rd. Construct<br />
reconstructing bridges (no<br />
roundabouts at ramp termini and remove existing signals. 2013 $5,200,000 additional travel lanes)<br />
Sacramento City of Isleton SAC24410 VAR79039 2nd Street Landscaping Landscape 2nd St. from A St. to C St. 2013 $12,333 Plantings, landscaping, etc.<br />
Specific activities which do not<br />
involve or lead directly to<br />
construction, such as: planning<br />
and technical studies, grants for<br />
training and research programs,<br />
planning activities conducted<br />
pursuant to titles 23 and 49<br />
U.S.c., and Federal-aid systems<br />
revisions<br />
Sacramento City of Rancho Cordova SAC24153 VAR79046 Bicycle Master Plan Develop plan for citywide bicycle system. (CP06-2042 and CP10-2082) <strong>2011</strong> $458,000<br />
Grouped Projects for Construction of<br />
small passenger shelters and<br />
information kiosks<br />
Grouped Projects for Widening narrow<br />
pavements or reconstructing bridges<br />
(no additional travel lanes<br />
Grouped Projects for Plantings,<br />
landscaping, etc.<br />
Grouped Projects for Activities that do<br />
not lead to construction<br />
Sacramento City of Rancho Cordova SAC22420 Douglas Rd.<br />
Sacramento City of Rancho Cordova SAC24484 VAR79030<br />
Douglas Road / Folsom South<br />
Canal Bicycle Connection<br />
Sacramento City of Rancho Cordova SAC24473 Douglas Road Widening<br />
Sacramento City of Rancho Cordova SAC24183 Easton Valley Pkwy Phase 1<br />
Sacramento City of Rancho Cordova SAC24190 Femoyer Rd - Air Park Drive<br />
Widen Douglas Blvd. to 5 lanes in a series of 3 phases:Phase I: Reduce<br />
from 2 lanes each direction to 1 lane each direction with turn lanes and<br />
frontage improvements south of ultimate centerline generally from Rancho<br />
Cordova Pkwy to Borderlands Dr.. The striping will be in an interim<br />
configuration.Phase II: The project consists of two lanes north of ultimate<br />
centerline and a median generally from Rancho Cordova Pkwy. to<br />
Borderlands Drive. In addition, a full five lane improvement would extend to<br />
Americanos Blvd. The final striping would be installed with this phase<br />
allowing three eastbound lanes and two westbound lanes. New signals<br />
would be installed at the intersections of Doulgas Rd. and Rancho Cordova<br />
Pkwy, Timberlands Dr. and an interim signal at Americanos Blvd.Phase III:<br />
The project proposes to widen Douglas Rd. to five-lanes from Americanos<br />
Blvd. to Grant Line Rd. and intersection improvements at Grantline Rd.<br />
Funding is for construction of 4 center lanes with median. Frontage lane<br />
constructed at developer cost. (CP07-2032, CP06-2024 and CP10-2083) 2020 $18,988,000<br />
In Rancho Cordova, at intersection of Douglas Rd and Folsom South Canal:<br />
provide a bicycle/pedestrian connection from Douglas Rd to the Folsom<br />
South Canal bike trail. 20<strong>14</strong> $565,000 Bicycle and pedestrian facilities<br />
This project will be built in phases. This project constructed by the County<br />
will construct two-lanes and a traffic signal at the intersection of Zinfandel<br />
Drive/Eagles Nest Road and Douglas Road. The project also proposes to<br />
reconstruct/realign Eagles Nest Road approximately 1,000 feet south from<br />
the new Zinfandel Drive and Douglas Road. The final phase will widen<br />
Douglas Road from 2 to 6 lanes and construct a 6 lane bridge over the<br />
Folsom South Canal. This project will eliminate a bottleneck between<br />
arterial cross sections east of Sunrise Boulevard and the proposed County<br />
thoroughfare cross section west of the City boundary.(See SAC20240 and<br />
and SAC24467 other phases.) 2020 $13,000,000<br />
Construct Easton Valley Parkway as a new 6-lane road from Rancho<br />
Cordova Parkway to the City Limits including intersection improvements at<br />
Rancho Cordova Parkway. 2017 $9,768,000<br />
Air Park Drive (Femoyer Road): The project proposes to widen the existing<br />
Femoyer Road to 4-lane and construct the roadway extension from Air Park<br />
Drive to International Drive. Various improvements will also be constructed<br />
on Air Park Drive. An interim two lane connection project is anticipated in<br />
the short term. That work will pave a two lane roadway connecting<br />
Femoyer Road to Air Park Drive and will install a three way stop at Peter A.<br />
McCuen Drive. (CP06-2021 Airpark-Femoyer) 2015 $1,877,000<br />
Grouped Projects for Bicycle and<br />
pedestrian facilities<br />
<strong>2011</strong> <strong>MTIP</strong> - Page 395 of 423<br />
Page 16 of 37