Appendix 10<br />

County Lead Agency Project ID<br />

Grouped Cat.<br />

ID Title Description<br />

Completion<br />

Year Total Cost Exempt Cat. Grouped Cat.<br />

City of Galt Dept of Public<br />

Preventive Maintenance for<br />

Grouped Projects for Rehabilitation of<br />

Sacramento Works SAC24448 VAR79055 SCTLink Fleet Provide preventive maintenance of SCTLink vehicles. <strong>2011</strong> $156,854 Rehabilitation of transit vehicles transit vehicles<br />

Widening narrow pavements or Grouped Projects for Widening narrow<br />

City of Galt Dept of Public<br />

Simmerhorn Road Overcrossing In Galt: Simmerhorn Road overcrossing of SR 99; Construct realigned<br />

reconstructing bridges (no pavements or reconstructing bridges<br />

Sacramento Works SAC24165 VAR79020 Replacement<br />

overcrossing. 2018 $4,450,000 additional travel lanes)<br />

(no additional travel lanes<br />

Sacramento<br />

Sacramento<br />

Sacramento<br />

City of Galt Dept of Public<br />

Works SAC24343 VAR79051<br />

South County Transit Bus Stop<br />

Shelters<br />

City of Galt Dept of Public<br />

Works SAC20580 SR 99 Central Galt Interchange<br />

City of Galt Dept of Public<br />

Works SAC24338 VAR79020 Twin Cities Road Widening<br />

Installation of bus stop shelters at 3 key locations for the SCTLink demand<br />

response service in the City of Galt. <strong>2011</strong><br />

Construction of small passenger<br />

$70,000 shelters and information kiosks<br />

In Galt: A & C Streets, Boessow Road at SR 99; Replace existing C Street<br />

interchange at SR 99 with new 6 lane overcrossings (4 through lanes and<br />

left-turn channelization) at C Street and A Street. Reconstruct all on/off<br />

ramps. Realign connector streets. HPP #1257 2013 $50,641,711<br />

In Galt: Twin Cities Road to Bergeron Road; Widen 330 linear feet of Twin<br />

Widening narrow pavements or<br />

Cities Rd between E. Stockton Blvd and Bergeron Rd. Construct<br />

reconstructing bridges (no<br />

roundabouts at ramp termini and remove existing signals. 2013 $5,200,000 additional travel lanes)<br />

Sacramento City of Isleton SAC24410 VAR79039 2nd Street Landscaping Landscape 2nd St. from A St. to C St. 2013 $12,333 Plantings, landscaping, etc.<br />

Specific activities which do not<br />

involve or lead directly to<br />

construction, such as: planning<br />

and technical studies, grants for<br />

training and research programs,<br />

planning activities conducted<br />

pursuant to titles 23 and 49<br />

U.S.c., and Federal-aid systems<br />

revisions<br />

Sacramento City of Rancho Cordova SAC24153 VAR79046 Bicycle Master Plan Develop plan for citywide bicycle system. (CP06-2042 and CP10-2082) <strong>2011</strong> $458,000<br />

Grouped Projects for Construction of<br />

small passenger shelters and<br />

information kiosks<br />

Grouped Projects for Widening narrow<br />

pavements or reconstructing bridges<br />

(no additional travel lanes<br />

Grouped Projects for Plantings,<br />

landscaping, etc.<br />

Grouped Projects for Activities that do<br />

not lead to construction<br />

Sacramento City of Rancho Cordova SAC22420 Douglas Rd.<br />

Sacramento City of Rancho Cordova SAC24484 VAR79030<br />

Douglas Road / Folsom South<br />

Canal Bicycle Connection<br />

Sacramento City of Rancho Cordova SAC24473 Douglas Road Widening<br />

Sacramento City of Rancho Cordova SAC24183 Easton Valley Pkwy Phase 1<br />

Sacramento City of Rancho Cordova SAC24190 Femoyer Rd - Air Park Drive<br />

Widen Douglas Blvd. to 5 lanes in a series of 3 phases:Phase I: Reduce<br />

from 2 lanes each direction to 1 lane each direction with turn lanes and<br />

frontage improvements south of ultimate centerline generally from Rancho<br />

Cordova Pkwy to Borderlands Dr.. The striping will be in an interim<br />

configuration.Phase II: The project consists of two lanes north of ultimate<br />

centerline and a median generally from Rancho Cordova Pkwy. to<br />

Borderlands Drive. In addition, a full five lane improvement would extend to<br />

Americanos Blvd. The final striping would be installed with this phase<br />

allowing three eastbound lanes and two westbound lanes. New signals<br />

would be installed at the intersections of Doulgas Rd. and Rancho Cordova<br />

Pkwy, Timberlands Dr. and an interim signal at Americanos Blvd.Phase III:<br />

The project proposes to widen Douglas Rd. to five-lanes from Americanos<br />

Blvd. to Grant Line Rd. and intersection improvements at Grantline Rd.<br />

Funding is for construction of 4 center lanes with median. Frontage lane<br />

constructed at developer cost. (CP07-2032, CP06-2024 and CP10-2083) 2020 $18,988,000<br />

In Rancho Cordova, at intersection of Douglas Rd and Folsom South Canal:<br />

provide a bicycle/pedestrian connection from Douglas Rd to the Folsom<br />

South Canal bike trail. 20<strong>14</strong> $565,000 Bicycle and pedestrian facilities<br />

This project will be built in phases. This project constructed by the County<br />

will construct two-lanes and a traffic signal at the intersection of Zinfandel<br />

Drive/Eagles Nest Road and Douglas Road. The project also proposes to<br />

reconstruct/realign Eagles Nest Road approximately 1,000 feet south from<br />

the new Zinfandel Drive and Douglas Road. The final phase will widen<br />

Douglas Road from 2 to 6 lanes and construct a 6 lane bridge over the<br />

Folsom South Canal. This project will eliminate a bottleneck between<br />

arterial cross sections east of Sunrise Boulevard and the proposed County<br />

thoroughfare cross section west of the City boundary.(See SAC20240 and<br />

and SAC24467 other phases.) 2020 $13,000,000<br />

Construct Easton Valley Parkway as a new 6-lane road from Rancho<br />

Cordova Parkway to the City Limits including intersection improvements at<br />

Rancho Cordova Parkway. 2017 $9,768,000<br />

Air Park Drive (Femoyer Road): The project proposes to widen the existing<br />

Femoyer Road to 4-lane and construct the roadway extension from Air Park<br />

Drive to International Drive. Various improvements will also be constructed<br />

on Air Park Drive. An interim two lane connection project is anticipated in<br />

the short term. That work will pave a two lane roadway connecting<br />

Femoyer Road to Air Park Drive and will install a three way stop at Peter A.<br />

McCuen Drive. (CP06-2021 Airpark-Femoyer) 2015 $1,877,000<br />

Grouped Projects for Bicycle and<br />

pedestrian facilities<br />

<strong>2011</strong> <strong>MTIP</strong> - Page 395 of 423<br />