19.06.2014 Views

Final 2011/14 MTIP - sacog

Final 2011/14 MTIP - sacog

Final 2011/14 MTIP - sacog

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Appendix 10<br />

County Lead Agency Project ID<br />

Sacramento SACOG VAR56037 VAR79046 SECAT Program Phase 2<br />

Sacramento<br />

Sacramento County Dept<br />

of Transportation SAC24487 VAR79046<br />

Grouped Cat.<br />

ID Title Description<br />

Arcade Creek Bike/Ped<br />

Crossing Study<br />

Completion<br />

Year Total Cost Exempt Cat. Grouped Cat.<br />

Specific activities which do not<br />

involve or lead directly to<br />

construction, such as: planning<br />

and technical studies, grants for<br />

Phase 2 of Sacramento Emergency Clean Air Transportation Program<br />

(SECAT), Heavy-Duty NOx control strategies; GIS Transit program<br />

including bus stop and centralized regional transit information system, and<br />

trip planning. (Phase 1 SAC22090) (Emission Benefits in kg/day for each<br />

$3m increment: 835 NOx, 109 ROG) 2013<br />

training and research programs,<br />

planning activities conducted<br />

pursuant to titles 23 and 49<br />

U.S.c., and Federal-aid systems<br />

$19,778,395 revisions<br />

Specific activities which do not<br />

involve or lead directly to<br />

construction, such as: planning<br />

and technical studies, grants for<br />

training and research programs,<br />

planning activities conducted<br />

pursuant to titles 23 and 49<br />

Study a new bicycle/pedestrian overcrossing of Arcade Creek, linking<br />

U.S.c., and Federal-aid systems<br />

Winding Wy. and Walnut Ave. area to the American River College 2013 $320,000 revisions<br />

Grouped Projects for Activities that do<br />

not lead to construction<br />

Grouped Projects for Activities that do<br />

not lead to construction<br />

Sacramento<br />

Sacramento<br />

Sacramento County Dept<br />

of Transportation SAC24416 VAR79030 Arden Way Improvement<br />

Sacramento County Dept<br />

of Transportation SAC24267 VAR79047<br />

Arden Way ITS - Ethan Rd to<br />

Fair Oaks<br />

From Eastern Avenue for Fair Oaks Blvd, to include new sidewalks, class II<br />

bike lane improvements, planter strips, shade trees, street lighting, and a<br />

traffic signal with bicycle and pedestrian detectors, intersection<br />

improvements at the offset intersection at Mission Avenue, installation of<br />

sidewalk ramps compliant with ADA requirements, audible traffic signals,<br />

pedestrian countdown signal devices, and modify the signal at the Arden<br />

Way at Fair Oaks Blvd intersection including improving the condition of the<br />

pavement. (Emission Benefits in kg/day: 0.2 ROG, 0.1 NOx) <strong>2011</strong> $2,155,530 Bicycle and pedestrian facilities<br />

In Sacramento County: Between Arden Way and Fair Oaks Blvd; This<br />

project will install ITS improvements on Arden Way from Watt Ave to Fair<br />

Oaks blvd. This improvement will continue the deployment of ITS strategies<br />

in the Arden Way corridor. As part of the Arden Way Intelligent<br />

Transportation enhancement<br />

Transportation System, the proposed ITS elements will work to improve<br />

activities (except rehabilitation<br />

traffic management and mobility along Arden Way and provide a<br />

and operation of historic<br />

communication link between the County and other jurisdictions<br />

transportation buildings,<br />

communication hubs. 2015 $3,467,692 structures or facilities)<br />

Grouped Projects for Bicycle and<br />

pedestrian facilities<br />

Grouped Projects for Transportation<br />

enhancement activities<br />

Sacramento<br />

Sacramento<br />

Sacramento<br />

Sacramento<br />

Sacramento County Dept<br />

of Transportation SAC24593 VAR79008 Bridge Preventive Maintenance<br />

In Sacramento County, various locations: perform bridge preventive<br />

maintenance. For a list of locations see:<br />

http://www.dot.ca.gov/hq/LocalPrograms/hbrr99/HBP_MPO.html#SACOG 2015<br />

Widening narrow pavements or<br />

reconstructing bridges (no<br />

$1,338,000 additional travel lanes)<br />

Purchase of new buses and rail<br />

cars to replace existing vehicles<br />

Sacramento County Dept<br />

or for minor expansions of the<br />

of Transportation SAC24454 VAR79058 Bus Replacement Replace one commuter bus. 2012 $274,000 fleet<br />

Sacramento County Dept<br />

of Transportation SAC24520 VAR79008<br />

Sacramento County Dept<br />

of Transportation SAC22780 VAR79030<br />

Dillard Rd. Bridge Scour<br />

Countermeasures<br />

Dry Creek Parkway Trail, Phase<br />

1<br />

Widening narrow pavements or<br />

Dillard Rd., over Cosumnes river, 0.2 miles south of S.R. 16: Install scour<br />

countermeasures on scour critical bridge. 20<strong>14</strong><br />

reconstructing bridges (no<br />

$1,278,751 additional travel lanes)<br />

In Sacramento County, Rio Linda-Dry Creek Parkway, from Dry Creek Road<br />

at Dry Creek Ranch to the Cherry Island Soccer Complex: Construct a 3-<br />

mile Class I shared-use bicycle/pedestrian trail.(Emission Benefits in<br />

kg/day: 0.17 ROG, 0.13 NOx, 0.04 PM10) <strong>2011</strong> $1,701,826 Bicycle and pedestrian facilities<br />

Grouped Projects for Bridge<br />

Rehabilitation and Reconstruction -<br />

HBP Program<br />

Grouped Projects for Purchase of new<br />

buses and rail cars to replace existing<br />

vehicles or for minor e<br />

Grouped Projects for Bridge<br />

Rehabilitation and Reconstruction -<br />

HBP Program<br />

Grouped Projects for Bicycle and<br />

pedestrian facilities<br />

Sacramento<br />

Sacramento County Dept<br />

of Transportation SAC22430 Eagles Nest Road Widening<br />

In Sacramento County, Eagles Nest Road from Kiefer Boulevard to Douglas<br />

Road, construct and widen from 2 to 4 lanes with curb, gutter, sidewalk,<br />

raised landscaped median; improvements also include the installation of a<br />

box culvert and traffic signal at Eagles Nest Road/Kiefer Boulevard. 2019 $18,350,000<br />

Sacramento County Dept<br />

Sacramento of Transportation SAC24425<br />

Sacramento<br />

El Camino Ave Pedestrian and<br />

Bike Improvements<br />

Sacramento County Dept<br />

of Transportation SAC24380 Elk Grove-Florin Rd. Bridge<br />

El Camino Ave from Ethan Way to Walnut Ave and Eastern Ave from El<br />

Camino Ave to Bright Way: Improve existing corridors and reduce traffic<br />

lanes (road diets) to enhance bicycle and pedestrian safety and mobility.<br />

The reduction in traffic lanes will be from 4 to 3 lanes on El Camino Ave<br />

from Butano Dr to Walnut Ave (2-lanes eastbound and 1-lane westbound)<br />

and on Eastern Ave from El Camino Ave to Lusk Dr (1-lane southbound<br />

and 2-lanes northbound). Project features include sidewalk and walkway<br />

construction, median refuge islands, improvements to existing signalized<br />

and non-signalized intersections, bicycle lanes, transit stops, bus shelters,<br />

and other bike/ped improvements. 2012 $4,376,920<br />

Elk Grove-Florin Rd, over Elder Creek, 0.1 mi north of Gerber Rd.:<br />

Rehabilitate functionally obsolete 2 lane bridge and widen to 6 lanes. 2013 $2,023,001<br />

<strong>2011</strong> <strong>MTIP</strong> - Page 400 of 423<br />

Page 21 of 37

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!