Appendix 5 - Completed, Deleted, and Delayed Projects<br />
Completed Projects from the Previous 2009/12 <strong>MTIP</strong><br />
County Lead Agency Project ID Title Description Completion Year Total Cost<br />
Placer<br />
Placer<br />
Placer<br />
Placer<br />
Placer<br />
Placer<br />
From the Auburn City/Placer County Limits to approximately 450 feet<br />
within the City limit, widen Auburn-Folsom Road by 1-3 feet on the west<br />
side of the roadway to accommodate Class II bicycle lanes. This first<br />
phase will tie into a future, larger Placer County project that will widen<br />
Auburn-Folsom Road from Shirland Tract Road to the Auburn City limits.<br />
This project is identified in the 2002 Regional Bikeway Plan as one of<br />
Placer County Dept of<br />
Auburn Folsom Road Bikeway - seven high priority bikeway projects listed in the plan. (Emission Benefits<br />
Public Works<br />
PLA25358 Phase 1<br />
in kg/day: ROG 0.02, NOx 0.02) 2009 $218,985<br />
Placer County Dept of<br />
Install a signal at Auburn-Folsom Rd. and Fuller Dr. (To be completed in<br />
Public Works PLA25420 Auburn-Folsom Rd Signal conjunction with Auburn-Folsom Rd widening project, PLA15080.) 2006 $313,500<br />
Placer County Dept of<br />
Dick Cook Rd, over Miners Ravine, near Auburn Folsom Rd: Replace<br />
Public Works PLA25457 Dick Cook Bridge Replacement existing structurally deficient 2 lane bridge with new 2 lane bridge. 2010 $4,310,000<br />
Placer County Dept of<br />
Public Works<br />
PLA25186<br />
Douglas Blvd. Pedestrian<br />
Facilities and Landscaping<br />
Placer County Dept of<br />
Public Works CAL18759 Foresthill Rd. Realignment<br />
Placer County Dept of<br />
SR 65 Sunset Blvd.<br />
Public Works<br />
PLA19510 Interchange<br />
Along north side of Douglas Blvd. between Sierra College Blvd. and<br />
Auburn-Folsom Road: Install approximately 1,400 feet of sidewalk and<br />
42,000 SF of landscaping. There are several "missing" links of walkway<br />
that need to be constructed. (ROG 0.041, NOx 0.027, PM10 0.012) 2010 $1,013,067<br />
On Foresthill Rd., from 250 ft west to 1000 ft east of Upper Lake<br />
Clementine Rd., Realign roadway; modify superelevations, roadway<br />
drainage and lane configurations. Install open grade ac; improve striping<br />
and signage. 2010 $434,000<br />
East of Rocklin, Intersection of State Route 65 and Sunset Boulevard:<br />
Construct interchange. 2010 $34,000,000<br />
Allocation of 10% Operating Assistance of ARRA Sacramento Urbanized<br />
Area funding. 2010 $25,000<br />
Placer Placer County Transit PCT10499 ARRA Operating Assistance<br />
Placer Placer County Transit PCT10498 Bus Replacement Acquisition of two (2) 45' replacement 57-seat commuter buses. 2010 $1,075,000<br />
Dewitt Center in Auburn: Increase of CNG compressor capacity at Placer<br />
County CNG fueling station in Auburn. Local Agency Funds are Placer<br />
County Air District Funds. (Emission benefits in kg/day: 3.46 NOx, 0.12<br />
Placer Placer County Transit PCT10484 CNG Station Upgrade Phase 1 PM10) 2010 $1,136,605<br />
Placer Placer County Transit PCT10482<br />
Placer County Transit<br />
Operating Assistance - FY<br />
08/09 Operation of transit services in non-urbanized areas of Placer County. 2009 $510,437<br />
Placer Placer County Transit PCT10483<br />
Placer Placer County Transit PCT10486<br />
Placer County Transit<br />
Operating Assistance FY 07/08 Operation of transit services in non-urbanized areas of Placer County. 2009 $501,726<br />
Preventive Maintenance and Perform preventive maintenance on the Placer County Transit Fleet<br />
ADA Service<br />
($306,500 FTA) and provide ADA transit service ($295,000 FTA). 2009 $751,875<br />
Placer<br />
Placer County<br />
Transportation Planning<br />
Agency<br />
PLA25180<br />
Congestion Management<br />
Program 2007-11<br />
Congestion Management Program is an educational and outreach program<br />
aimed at reducing traffic congestion and improving air quality by reducing<br />
drive-alone auto trips activities for Placer County. Both the City of<br />
Roseville and PCTPA are implementing agencies. (For past years, see<br />
PLA25004) (Emission Benefits in kg/day: NOx 13, ROG 11, and PM10 4) 2010 $603,568<br />
<strong>2011</strong> <strong>MTIP</strong> - Page 330 of 423<br />
Completed Projects: Page 7 of 39