07.07.2014 Views

2013/14 Recommended Budget - City of St. George

2013/14 Recommended Budget - City of St. George

2013/14 Recommended Budget - City of St. George

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

WATER DEPARTMENT<br />

MATERIALS & SUPPLIES<br />

CAPITAL OUTLAYS<br />

Requested Capital Outlays<br />

<strong>Recommended</strong> Capital Outlays<br />

Maintenance - Gunlock Well # 2 50,000 Maintenance - Gunlock Well # 2 50,000<br />

Ledges Well - Relocate Chlorinator 25,000 Ledges Well - Relocate Chlorinator 25,000<br />

New Meter pits 20,000 New Meter pits 20,000<br />

2450 East Extension 105,000 2450 East Extension 105,000<br />

Little Valley Pumps 7,000 Little Valley Pumps 7,000<br />

Sandberg Pump <strong>St</strong>ation 20,500 Sandberg Pump <strong>St</strong>ation 20,500<br />

Graveyard Tank Cathodic Protection 20,000 Graveyard Tank Cathodic Protection 20,000<br />

Entrada New Flow Control Valve 25,000 Entrada New Flow Control Valve 25,000<br />

Bloomington Hills Irrigation Pumps 8,000 Bloomington Hills Irrigation Pumps 8,000<br />

Sunbrook # 2 8,000 Sunbrook # 2 8,000<br />

Dixie River Crossing 25,000 Dixie River Crossing 25,000<br />

Fuel Island 2,833 Fuel Island 2,833<br />

Building Insulation 35,000 Building Insulation 35,000<br />

Service Truck 60,000 Service Truck 60,000<br />

Computers 2,000 Computers 2,000<br />

Trench Box 3,200 Trench Box 3,200<br />

Replacement Trucks (2) 95,000 Replacement Trucks (2) 95,000<br />

<strong>St</strong>eel Tank for Water Truck 35,000 <strong>St</strong>eel Tank for Water Truck 35,000<br />

Trench box trailer 4,000 Trench box trailer 4,000<br />

Replacement computers 3,200 Replacement computers 3,200<br />

Security Camera & S<strong>of</strong>tware 10,000 Security Camera & S<strong>of</strong>tware 10,000<br />

Front End Loader 120,000 Front End Loader 120,000<br />

Waterline Replacement- <strong>City</strong> Center 250,000 Waterline Replacement- <strong>City</strong> Center 250,000<br />

Waterline Replacement- Dixie Downs 80,000 Waterline Replacement- Dixie Downs 80,000<br />

Bloomington Hills Tank Line 180,000 Bloomington Hills Tank Line 180,000<br />

Waterline Replacement- 3050 East 70,000 Waterline Replacement- 3050 East 70,000<br />

Cathodic - Pipeline Protection 175,000 Cathodic - Pipeline Protection 175,000<br />

950 W 680 N PRV 25,000 950 W 680 N PRV 25,000<br />

Waterline Replacement 1700 N. 80,000 Waterline Replacement 1700 N. 80,000<br />

Fuel Island 22,660 Fuel Island 22,660<br />

White Dome Tank Site - Rough Grading 50,000 White Dome Tank Site - Rough Grading 50,000<br />

Industrial Tank 1,000,000 Industrial Tank 1,000,000<br />

SCADA System 2,500 SCADA System 2,500<br />

Computer 1,500 Computer 1,500<br />

2,620,393 2,620,393<br />

<strong>14</strong>8

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!