ENERGY SERVICES<br />
MATERIALS & SUPPLIES<br />
CAPITAL OUTLAYS<br />
Requested Capital Outlays<br />
<strong>Recommended</strong> Capital Outlays<br />
Control Room Computers 6,000 Control Room Computers 6,000<br />
GE PB0279 Service Bulletin Update 22,000 GE PB0279 Service Bulletin Update 22,000<br />
Install AB-9C Ammonia Control on CEMS 7,000 Install AB-9C Ammonia Control on CEMS 7,000<br />
DCS Main Frame Components 25,000 DCS Main Frame Components 25,000<br />
MGF Gas Compressor Spare Parts 10,000 MGF Gas Compressor Spare Parts 10,000<br />
MGF Chiller Spare Parts 13,000 MGF Chiller Spare Parts 13,000<br />
MGF GE <strong>Recommended</strong> Spare Parts 35,000 MGF GE <strong>Recommended</strong> Spare Parts 35,000<br />
MGF CEMS Critical Spare Analyzer 25,000 MGF CEMS Critical Spare Analyzer 25,000<br />
MGF EIT SCR/COR Spare Parts 30,000 MGF EIT SCR/COR Spare Parts 30,000<br />
Red Rock GF - CO Monitoring Instrumentation 1,000 Red Rock GF - CO Monitoring Instrumentation 1,000<br />
Red Rock GF - Rebuild Cylinder Heads (2) 35,000 Red Rock GF - Rebuild Cylinder Heads (2) 35,000<br />
Red Rock GF - Rebuild Spare Govenor 10,000 Red Rock GF - Rebuild Spare Govenor 10,000<br />
Red Rock GF - Replace Exhaust Manifold Sealing Rings 35,000 Red Rock GF - Replace Exhaust Manifold Sealing Rings 35,000<br />
MGF - Woodward S<strong>of</strong>tware Modification 23,000 MGF - Woodward S<strong>of</strong>tware Modification 23,000<br />
MGF - New Gas/Oil Separator 65,000 MGF - New Gas/Oil Separator 65,000<br />
Upgrade <strong>St</strong>atic for Communication - River Sub to Green Valley160,000 Upgrade <strong>St</strong>atic for Communication - River Sub to Green 160,000 Valley<br />
New Meters 60,000 New Meters 60,000<br />
Distribution Capacitor Additions 75,000 Distribution Capacitor Additions 75,000<br />
Misc. Distribution Projects - 700 S. Line Relocate 200,731 Misc. Distribution Projects - 700 S. Line Relocate 200,731<br />
Underground Projects 25,000 Underground Projects 25,000<br />
Concrete for <strong>St</strong>eel Poles - 2000 East 10,000 Concrete for <strong>St</strong>eel Poles - 2000 East 10,000<br />
700 S. to 900 S. Line Relocation - Overhead 29,500 700 S. to 900 S. Line Relocation - Overhead 29,500<br />
Fuel Island Cost-Participation 28,500 Fuel Island Cost-Participation 28,500<br />
Padmounted Switchgear and Transformers 200,000 Padmounted Switchgear and Transformers 200,000<br />
Warehouse Shelving 3,500 Warehouse Shelving 3,500<br />
Crew Truck 48,000 Crew Truck 48,000<br />
Mini Backyard Bucket/Digger 137,000 Mini Backyard Bucket/Digger 137,000<br />
Under Dog Puller 125,000 Under Dog Puller 125,000<br />
Phasing/Pro<strong>of</strong> Test Set 4,500 Phasing/Pro<strong>of</strong> Test Set 4,500<br />
Listening Device (locate faults) 3,500 Listening Device (locate faults) 3,500<br />
Phase ID Base Unit 7,500 Phase ID Base Unit 7,500<br />
Fiber Optic Projects/Repair 10,000 Fiber Optic Projects/Repair 10,000<br />
NTU Upgrade (2) 15,000 NTU Upgrade (2) 15,000<br />
Replace Batteries 20,000 Replace Batteries 20,000<br />
SCADA Linux Nodes (D&E) 10,000 SCADA Linux Nodes (D&E) 10,000<br />
Substation Camera 3,000 Substation Camera 3,000<br />
Twin Lakes Fencing 10,000 Twin Lakes Fencing 10,000<br />
Spill Prevention Containment 30,000 Spill Prevention Containment 30,000<br />
Replace 3A Controls with Switch 15,000 Replace 3A Controls with Switch 15,000<br />
S<strong>of</strong>tware Office Applications 4,000 S<strong>of</strong>tware Office Applications 4,000<br />
Laptop (Replacements) 2,400 Laptop (Replacements) 2,400<br />
Computer (Replacements) 3,600 Computer (Replacements) 3,600<br />
Field Computers - Tablets 2,000 Field Computers - Tablets 2,000<br />
1,584,731 1,584,731<br />
166