ENERGY SERVICES<br />

The Energy Services Department is responsible for providing electric power to approximately 28,000 <strong>City</strong> residential and business<br />

meters. This is done through construction and maintenance <strong>of</strong> an extensive transmission and distribution systems. There are 20<br />

distribution substations and approximately 900 miles <strong>of</strong> transmission distribution lines. In addition to the T&D system, the Department<br />

owns and operates three generation facilities with a capacity <strong>of</strong> approximately 60 MW <strong>of</strong> generation capacity. The Department is also<br />

responsible for the operation and maintenance <strong>of</strong> the 138 kV system that is shared ownership with the Utah Associated Municipal<br />

Power Systems (UAMPS).<br />

<strong>2013</strong>-<strong>14</strong><br />

<strong>Recommended</strong><br />

<strong>Budget</strong><br />

Full-Time Employees $ 3,335,406<br />

Part-Time Employees $ 35,000<br />

Employee Benefits $ 1,415,215<br />

Materials & Supplies $ 52,024,530<br />

Capital Outlays $ 1,584,731<br />

TOTAL $ 58,394,882<br />

Full-Time<br />

Employees<br />

$3,335,406<br />

5.71%<br />

Employee<br />

Benefits<br />

$1,415,215<br />

2.42%<br />

Capital Outlays<br />

$1,584,731<br />

2.71%<br />

Materials &<br />

Supplies<br />

$52,024,530<br />

89.09%<br />

SALARIES & BENEFITS<br />

$70,000,000<br />

$60,000,000<br />

$50,000,000<br />

$40,000,000<br />

$30,000,000<br />

$20,000,000<br />

$10,000,000<br />

% <strong>of</strong> Salaries<br />

& Benefits to <strong>Recommended</strong><br />

Dept. <strong>Budget</strong><br />

8%<br />

$0<br />

2009 2010 2011 2012 <strong>Budget</strong><br />

<strong>2013</strong><br />

SALARIES & BENEFITS<br />

TOTAL<br />

<strong>Budget</strong><br />

20<strong>14</strong><br />

Authorized Positions<br />

Positions Requested<br />

Total Positions<br />

Energy Services Director Power Gen. Superintendent 2005 49<br />

Power Systems Op. Mgr System Control Operator 2006 49<br />

Power Dist. Superintendent System Cont. Oper./ Apprentice (4) 2007 52<br />

SCADA Tech. Sys. Cont. Oper./Resource Sched. Supervisor 2008 55<br />

Line Crew Supervisor (6) Generation Tech. (4) 2009 54<br />

Journey Lineworker (13) Substation Tech. (2) <strong>Recommended</strong><br />

2010 51<br />

Apprentice Lineworker (4) Substation Supv. (2) 2011 52<br />

Data Coll/Disconnect Spec. (2) Conservation Coord. 2012 52<br />

Inventory Specialist Chief Electrical Eng. <strong>2013</strong> 53<br />

Groundman/Equip Op. (2) Energy Resource Manager 20<strong>14</strong> 55<br />

Tech Services Admin<br />

FERC/NERC Records<br />

Engineer II<br />

GIS Technician<br />

165