<strong>Potsdam</strong> Municipal Airport - Master Plan – Phase 1 Report<br />

In the evaluation of development alternatives, an assessment will be made as to the<br />

potential impact on these categories. The evaluation of alternatives is based on a<br />

number of factors. Environmental considerations are weighed as completely and<br />

fairly as non-environmental considerations. The objective in developing the Airport<br />

Layout Plan is to enhance environmental quality or minimize environmental impacts<br />

while fulfilling the FAA's principal mission to provide for the safety of aircraft<br />

operations.<br />

Compliance under NEPA requires potential impacts to be mitigated regardless of<br />

level of significance. Additionally, should threshold values, as specified in FAA<br />

Order 5050.4B, National Environmental Policy Act (NEPA) Implementing<br />

Instructions for Airport Actions, regarding airport-related development be exceeded,<br />

then cumulative effects should be addressed more substantially within the appropriate<br />

NEPA document.<br />

2.05 Airport Key Issues<br />

At the start of the master plan study, <strong>Vi</strong>llage of <strong>Potsdam</strong> officials, airport<br />

management and staff, and the consultants identified a number of key issues at the<br />

Airport that included both concerns and opportunities. Surveys have been sent to<br />

local b<strong>us</strong>iness representatives and airport <strong>us</strong>ers whose responses provided their<br />

unique perspectives. The survey was conducted in November 2009 and had a 22<br />

percent response rate.<br />

Key issues at the Airport based on survey responses include the need for the<br />

following:<br />

• Additional hangar/aircraft storage facilities<br />

• Aircraft maintenance<br />

• Improved overall maintenance, especially on the New York State Route 11B<br />

side of the Airport<br />

• Removal of trees at the Runway 24 end of the Airport<br />

• Availability of a loaner vehicle for <strong>us</strong>e<br />

• Tie-downs for temporary parking<br />

• Additional/improved promotion of the Airport<br />