<strong>Potsdam</strong> Municipal Airport - Master Plan – Phase 1 Report<br />
Design Hour Operations = Design Day Operations x 0.15<br />
Table 3-9 presents the forecast of peaking characteristics for general aviation<br />
operations at <strong>Potsdam</strong> Municipal Airport.<br />
TABLE 3-9<br />
GENERAL AVIATION OPERATIONAL PEAKING FORECAST<br />
Year<br />
Annual<br />
Operations<br />
Peak Month<br />
Operations<br />
Design Day<br />
Operations<br />
Design Hour<br />
Operations<br />
2009 5,780 650 22 3<br />
2014 7,140 803 27 4<br />
2019 8,500 956 32 5<br />
2029 11,560 1,301 43 6<br />
<strong>Source</strong>: C&S Engineers, Inc.<br />
3.02 Forecasts of Annual Instrument Approaches<br />
A necessary task in assessing the need for new or improved landing aids is a forecast<br />
of the levels of instrument approaches at the Airport. An instrument approach can be<br />
defined as a series of predetermined maneuvers for the orderly transfer of an aircraft<br />
under instrument flight conditions (i.e., poor weather) from the beginning of the<br />
initial approach to a landing or to a point from which a landing may be made visually.<br />
At most general aviation airports, instrument operations will comprise two to five<br />
percent of the total operations. Given the existence of poor winter weather conditions<br />
and two instrument approach procedures at the Airport, it is projected that instrument<br />
approaches for the future will be five percent of the total annual operations, as<br />
presented in Table 3-10.<br />
TABLE 3-10<br />
FORECAST INSTRUMENT APPROACHES<br />
Year<br />
Total<br />
Operations<br />
Approach<br />
Percentage<br />
Approach<br />
Forecast<br />
2014 7,140 5% 357<br />
2019 8,500 5% 425<br />
2029 11,560 5% 578<br />
<strong>Source</strong>: C&S Engineers, Inc.<br />
3-8