30.10.2014 Views

Source - Vi.potsdam.ny.us - Potsdam

Source - Vi.potsdam.ny.us - Potsdam

Source - Vi.potsdam.ny.us - Potsdam

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Potsdam</strong> Municipal Airport - Master Plan – Phase 1 Report<br />

The fuel requirements at the Airport are shown in Table 4-12.<br />

TABLE 4-12<br />

FUEL STORAGE REQUIREMENTS<br />

Year ADPM<br />

Operations<br />

ADPM Fuel<br />

Used<br />

Two Week Fuel<br />

Requirement<br />

2009 22 55 gal 770 gal<br />

2014 27 68 gal 952 gal<br />

2019 32 80 gal 1,120 gal<br />

2029 43 108 gal 1,512 gal<br />

<strong>Source</strong>: C&S Companies., 2009<br />

The current 10,000 gallon 100LL Avgas tank is able to accommodate the demand<br />

throughout the forecast period.<br />

4.03-5 Automobile Parking<br />

The number of auto spaces required at an airport is also dependent upon the level of<br />

general aviation aircraft activity at the facility. The methodology for determining<br />

parking needs relates peak hour pilots, passengers, and airport employees to the<br />

number of parking spaces required. Numbers of peak hour pilots and passengers were<br />

previo<strong>us</strong>ly derived for the general aviation terminal building requirements. The<br />

number of employees currently working at the airport is zero. This number was held<br />

steady for the forecast period. The number of auto parking spaces equaled the sum of<br />

the peak hour pilots/passengers and employees at the Airport. This number was<br />

converted into paved area by <strong>us</strong>ing a standard of 22 square yards per vehicle space<br />

(refer to Table 4-13). Currently, the Airport has approximately 5,333 SY, which<br />

equates to 242 parking spaces, for <strong>us</strong>e by the public. The two lots located within<br />

airport fencing are not considered public parking. The forecasted operations indicate<br />

that there are adequate parking spaces to meet demand throughout the planning<br />

period.<br />

TABLE 4-13<br />

AUTO PARKING AREA REQUIREMENTS<br />

Year<br />

Peak Hour Pilots &<br />

Passengers<br />

Airport<br />

Employees<br />

Total Parking<br />

Spaces Area (SY)<br />

2009 242 5,333<br />

2014 10 0 10 220<br />

2019 13 0 13 286<br />

2029 15 0 15 330<br />

<strong>Source</strong>: C&S Engineers, Inc.<br />

4-15

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!