Source - Vi.potsdam.ny.us - Potsdam
Source - Vi.potsdam.ny.us - Potsdam
Source - Vi.potsdam.ny.us - Potsdam
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Potsdam</strong> Municipal Airport - Master Plan – Phase 1 Report<br />
The VFR and IFR hourly capacities for <strong>Potsdam</strong> Municipal Airport are estimated to<br />
be 98 and 59 operations per hour, respectively. Design hour operations forecasts<br />
range from four in 2014 to six in 2029. As shown on Table 4-2, the airfield will have<br />
sufficient hourly capacity to meet design hour and peak period demands.<br />
TABLE 4-2<br />
HOURLY CAPACITY SUMMARY<br />
Year<br />
Design Hour<br />
Operations<br />
VFR<br />
Hourly<br />
Capacity<br />
IFR<br />
Hourly<br />
Capacity<br />
VFR/IFR<br />
Capacity<br />
Ratio<br />
2014 4 98 59 4.1/6.8%<br />
2019 5 98 59 5.1/8.5%<br />
2029 6 98 59 6.1/10.2%<br />
4.01-2 Annual Service Volume<br />
<strong>Source</strong>: FAA Advisory Circular 150/5060-5 and C&S Engineers, Inc.<br />
An airport's Annual Service Volume (ASV) has been defined by the FAA as "a<br />
reasonable estimate of an airport's annual capacity. It accounts for differences in<br />
runway <strong>us</strong>e, aircraft mix, weather conditions, etc., that would be encountered over a<br />
year's time." Therefore, ASV is a function of the hourly capacity of the airfield and<br />
the annual, daily, and hourly demands placed upon it. ASV is estimated by<br />
multiplying the daily and hourly operation ratios by a weighted hourly capacity.<br />
At <strong>Potsdam</strong> Municipal Airport the ASV is estimated to be 230,000 aircraft operations<br />
(landings and takeoffs) for present conditions. Compared to the projection of 11,560<br />
operations by the year 2029, it is evident that airfield capacity is not a constraining<br />
factor to growth of the Airport. Table 4-3 summarizes the ASV relationships<br />
developed in this section.<br />
Year<br />
TABLE 4-3<br />
ANNUAL SERVICE VOLUME SUMMARY<br />
Annual<br />
Operations<br />
Annual Service<br />
Volume 1<br />
Annual<br />
Capacity Ratio<br />
2014 7,140 230,000 3.1%<br />
2019 8,500 230,000 3.7%<br />
2029 11,560 230,000 5.0%<br />
<strong>Source</strong>: C&S Engineers, Inc.<br />
4-4