<strong>Potsdam</strong> Municipal Airport - Master Plan – Phase 1 Report<br />

The VFR and IFR hourly capacities for <strong>Potsdam</strong> Municipal Airport are estimated to<br />

be 98 and 59 operations per hour, respectively. Design hour operations forecasts<br />

range from four in 2014 to six in 2029. As shown on Table 4-2, the airfield will have<br />

sufficient hourly capacity to meet design hour and peak period demands.<br />

TABLE 4-2<br />

HOURLY CAPACITY SUMMARY<br />

Year<br />

Design Hour<br />

Operations<br />

VFR<br />

Hourly<br />

Capacity<br />

IFR<br />

Hourly<br />

Capacity<br />

VFR/IFR<br />

Capacity<br />

Ratio<br />

2014 4 98 59 4.1/6.8%<br />

2019 5 98 59 5.1/8.5%<br />

2029 6 98 59 6.1/10.2%<br />

4.01-2 Annual Service Volume<br />

<strong>Source</strong>: FAA Advisory Circular 150/5060-5 and C&S Engineers, Inc.<br />

An airport's Annual Service Volume (ASV) has been defined by the FAA as "a<br />

reasonable estimate of an airport's annual capacity. It accounts for differences in<br />

runway <strong>us</strong>e, aircraft mix, weather conditions, etc., that would be encountered over a<br />

year's time." Therefore, ASV is a function of the hourly capacity of the airfield and<br />

the annual, daily, and hourly demands placed upon it. ASV is estimated by<br />

multiplying the daily and hourly operation ratios by a weighted hourly capacity.<br />

At <strong>Potsdam</strong> Municipal Airport the ASV is estimated to be 230,000 aircraft operations<br />

(landings and takeoffs) for present conditions. Compared to the projection of 11,560<br />

operations by the year 2029, it is evident that airfield capacity is not a constraining<br />

factor to growth of the Airport. Table 4-3 summarizes the ASV relationships<br />

developed in this section.<br />

Year<br />

TABLE 4-3<br />

ANNUAL SERVICE VOLUME SUMMARY<br />

Annual<br />

Operations<br />

Annual Service<br />

Volume 1<br />

Annual<br />

Capacity Ratio<br />

2014 7,140 230,000 3.1%<br />

2019 8,500 230,000 3.7%<br />

2029 11,560 230,000 5.0%<br />

<strong>Source</strong>: C&S Engineers, Inc.<br />