<strong>Potsdam</strong> Municipal Airport - Master Plan – Phase 1 Report<br />
TABLE 3-12<br />
DEMAND FORECAST SUMMARY<br />
Forecast Year<br />
Aviation Demand Element Existing 2014 2019 2029<br />
General Aviation Operations<br />
-Itinerant 2,312 2,856 3,400 4,624<br />
-Local 3,468 4,284 5,100 6,936<br />
Total Aircraft Operations 5,780 7,140 8,500 11,560<br />
Design Hour Operations 3 4 5 6<br />
Annual Instrument<br />
Approaches 357 425 578<br />
Annual Fuel Flowage (gals.) 14,132 17,457 20,783 28,264<br />
Based Aircraft 17 21 25 34<br />
<strong>Source</strong>: C&S Engineers, Inc.<br />
Based on data shown in Table 3-2, the demand forecast summary shows that<br />
operations are not consistent with the FAA TAF; the TAF shows operations flat-lined<br />
at 6,000 per year. The forecasted operations for each planning year period in relation<br />
to the TAF are 19% higher in 2014, 42% higher in 2019, and 93% higher in 2029.<br />
Beca<strong>us</strong>e of the current development at the Airport and information from the pilot and<br />
b<strong>us</strong>iness surveys, as well as from the <strong>Vi</strong>llage Administrator and Airport Manager, it is<br />
believed that there is sufficient evidence that the forecasted elements in Table 3-12<br />
will be accurate for <strong>Potsdam</strong> Municipal Airport.<br />
3-10