01.11.2014 Views

B-1 AGREEMENT System Generated e-Tender No ... - e-Tendering

B-1 AGREEMENT System Generated e-Tender No ... - e-Tendering

B-1 AGREEMENT System Generated e-Tender No ... - e-Tendering

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

99 Dy. Executive Engineer<br />

(e)<br />

(f)<br />

(g)<br />

Providing waterproof wattas all around the toilets.<br />

Grouting the mouths of inlets and outlets<br />

Filling sunk portion with brickbats including waterproof mortar and the top surface left rough to<br />

form a key for tiles.<br />

3. Overhead Tanks:<br />

The work some items in Schedule ‘B’ of the tender pertains to construction overhead water<br />

tank. After completion of the work, water tank as a whole shall be tested for water tightness<br />

and leakages if any shall be rectified forthwith without any extra cost to the department.<br />