SCHEDULE “ C ” AND SPECIFICATIONS<br />
NAME OF WORK:-<br />
Construction of Warehouse of 3000 Metric Tonne Capacity (2 <strong>No</strong>s) at Chikhale, in Taluka Dahanu, District Thane.<br />
Reference to Standard (PWD)<br />
Specification<br />
Description of Item<br />
Additional specification if any<br />
Specification<br />
Page <strong>No</strong>.<br />
<strong>No</strong>.<br />
1 2 3 4 5<br />
1 Item <strong>No</strong>. 1:- Excavation for foundation in earth, soils of all Bd.A.1 259 a) The item includes removal of stone, brick masonry of old<br />
types, sand gravel and soft murum including removing the<br />
structure, if any during excavation. b) The size viz length,,<br />
excavated materials upto a distance of 50 metres beyond the<br />
width and depth of excavation shown on drawing are<br />
building area and all lift, stacking and spreading, necessary<br />
tentative and may vary in actual execution. c) The decision<br />
dewatering unless provided elsewhere, preparing the bed for<br />
regarding strata classification will be taken by the executive<br />
foundation and required backfilling, ramming, watering,<br />
Engineer and shall be final and binding on the contractor. d)<br />
shoring and strutting etc. complete as directed.<br />
Item also included manual Dewatering, if any.<br />
Sr.<br />
<strong>No</strong>.<br />
2 Item <strong>No</strong>. 2:- Excavation for foundation in hard rock by<br />
blasting / old cement / lime masonry foundation including<br />
removing the excavated materials upto a distance of 50<br />
metres beyond the building area and all lift, stacking and<br />
spreading, necessary dewatering unless provided elsewhere,<br />
preparing the bed for foundation and required backfilling,<br />
ramming, watering, shoring and strutting etc. complete as<br />
directed.<br />
3 Item <strong>No</strong>. 3:- Providing soling using 80 millimetre size trap<br />
metal in layers of 15 centimetre each including filling voids<br />
with sand, ramming, watering etc. complete<br />
Bd.A.5 259 a) The item includes removal of stone, brick masonry of old<br />
structure, if any during excavation. b) The size viz length,,<br />
width and depth of excavation shown on drawing are<br />
tentative and may vary in actual execution. c) The decision<br />
regarding strata classification will be taken by the executive<br />
Engineer and shall be final and binding on the contractor. d)<br />
Item also included manual Dewatering, if any.<br />
Bd.A.12 264 a) The size of trap rubble should be 80mm b) The sand<br />
required to till the voids in the soling shall be dry and spread<br />
uniformly over the soling and brushed and washed to fill the<br />
interstices fully. c) The metal soling shall be laid and the<br />
voids in the metal layer shall be filled with hand rammer so<br />
as to achieve compact surface. d) The contract rate shall be<br />
for one cubic metre of the compacted layer of metal soling<br />
duly filed in the voids with sand. <strong>No</strong> extra payment shall be<br />
made for filling voids with sand.<br />
106<br />
Signature Of Contractor <strong>No</strong>. Of Corrections Executive Engineer<br />
P.W. Division, Jawhar