01.11.2014 Views

B-1 AGREEMENT System Generated e-Tender No ... - e-Tendering

B-1 AGREEMENT System Generated e-Tender No ... - e-Tendering

B-1 AGREEMENT System Generated e-Tender No ... - e-Tendering

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

1 2 3 4 5<br />

21 Item <strong>No</strong>. 21:- Providing and fixing rolling steel shutter<br />

fabricated from 18/19 gauges steel laths with side guides,<br />

bottom rail, brackets, door suspension shaft, including rolling<br />

springs, locking arrangement with one coat of red lead primer<br />

etc. complete.<br />

22 Item <strong>No</strong>. 22:- Providing and fixing steel louvered windows /<br />

ventilators (IS Std.) of various sizes as per detailed drawing<br />

with hot dip zinc including fabrication with approved type and<br />

quality all fixtures and fastening without teak wood boxing<br />

including finishing with one coat of primer and two coats of oil<br />

painting etc. complete.<br />

23 Item <strong>No</strong>. 23:- Providing and fixing steel windows of various<br />

sizes as per detailed drawings with welded square bars 12<br />

millimetre at 10 centimetre centre to centre with hot dip zinc<br />

coating without / with ventilator including fabrication, glazing<br />

with plain / obscured glass panels of approved type and<br />

quality, all fixtures and fastenings without teak wood boxing<br />

and architraves and finishing with one coat of primer etc.<br />

complete. (Sample to be get approved from Executive<br />

Engineer before use.)<br />

24 Item <strong>No</strong>. 24:- Providing and applying two coat of synthetic<br />

enamel paint of approved colour and quality to new and old<br />

structural steel work and wood work in buildings, including<br />

scaffolding if necessary and preparing the surface by solvent<br />

degreasing and de-rusting by manual methods, preparing the<br />

surface (excluding primer coat) etc. complete.<br />

25 Item <strong>No</strong>. 25:- Providing structural steel work in trusses, other<br />

similar trussed purlins and members with all bracing, gusset<br />

plates etc. as per detailed design and drawings or as directed<br />

by Engineer in charge, including cutting, fabricating, hoisting,<br />

erecting fixing in position, making riveted / bolted / welded<br />

connection and one coat of anticorrosive paint and over it two<br />

coats of oil painting of approved quality and shade etc.<br />

complete.<br />

Bd-T-56 510 a) The item shall be executed as per wording of item and as<br />

per detailed drawing and design, and as directed by<br />

Engineer-in charge.<br />

- - a) The item shall be executed as per wording of item and as<br />

per detailed drawing and design, and as directed by<br />

Engineer-in charge.<br />

Bd.T.53 509<br />

Bd-O-5 405 a) The item shall be executed as per wording of item and as<br />

per detailed drawing and design, and as directed by<br />

Engineer-in charge.<br />

Bd.C.8 278<br />

111<br />

Signature Of Contractor <strong>No</strong>. Of Corrections Executive Engineer<br />

P.W. Division, Jawhar

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!