81 Dy. Executive Engineer<br />

QUALITY ASSURANCE AND MAINTENANCE<br />

To ensure the specified quality of work which shall also include necessary surveys, temporary<br />

works etc., the contractor shall prepare a quality assurance plan and get the same approved from the<br />

Engineer in charge within eight days from the date of work order. For this, contractor shall submit an<br />

organization chart of his technical personnel to be deployed on the work along with their qualification,<br />

job descriptions defining the functions of reporting, supervising inspecting and approving. The<br />

contractor shall also submit a list of tools, equipment’s and the machinery and instrumentation which<br />

he proposes to use for the construction and for testing in the field and/or in the laboratory and<br />

monitoring. The contractor shall modify/supplement the organization chart and the list of machinery,<br />

equipment etc. as per the direction of the Superintending Engineer and shall deploy the personnel<br />

and equipment on the field as per the approved chart and list respectively. The contractor shall submit<br />

written method statements detailing his exact proposals of execution of the work in accordance with<br />

the specifications. He shall get these approved from the Engineer in charge. The quality of the work<br />

shall be properly documented through certificates, records, check-lists and logbooks of results etc.<br />

Such records shall be complied from the beginning of the work and be continuously updated and<br />

supplemented and this shall be the responsibility of the contractor. The forms should be got approved<br />

from the Engineer-in-charge.<br />

The contractor shall prepare detailed completion drawings after completion of the work. He<br />

shall also prepare and submit a maintenance manual giving procedure for maintenance, with the<br />

period of maintenance works including inspections, tools and equipment to be used, means of<br />

accessibility for all parts of the structure. He shall also include in the manual, the specifications for<br />

maintenance work that would be appropriate for his design and technique of construction. This<br />

manual shall be submitted within the contract period.<br />

Signature of Contractor <strong>No</strong>. Of Corrections Executive Engineer