16 Item <strong>No</strong>. 16:- Providing internal cement plaster 20 millimetre<br />
thick in two coat in cement mortar 1:4 with neeru finish to<br />
brick masonry or concrete surface in all positions, including<br />
scaffolding, racking out joints, providing groove at joints of<br />
stone masonry and concrete members and curing etc.<br />
complete.<br />
Bd-L-3<br />
Bd-L-10<br />
368<br />
370<br />
a) The surface to be plastered shall be first cleaned<br />
thoroughly and wetted for 24 hours and got checked by the<br />
Engineer In charge before starting the work. The finishing<br />
shall be plain and in line and level. b) curing shall be done<br />
by sprinkling water on the surface for a minimum period of<br />
14 days. c) Sand used for plastering should be free from silt<br />
and other foreign material and should be washed before<br />
17 Item <strong>No</strong>. 17:- Providing sand face plaster externally in two<br />
coats using approved screened sand in all position including<br />
providing base coat of 15 millimetre thick in cement mortar<br />
1:4 mixing approved water proofing compound at the rate of<br />
1kilogramme/50 kilogramme of cement mortar and curing the<br />
same for not less than two days and keeping the surface of<br />
base coat rough to receive the sand faced treatment 8<br />
millimetre thick in cement mortar 1:4 and finishing the surface<br />
by taking out grains and curing for 14 days including<br />
preparing the surface watering and scaffolding etc. complete<br />
18 Item <strong>No</strong>. 18:- Providing and applying washable oil bound<br />
distemper of approved colour, shade and quality to the old /<br />
new surface, in two coat including scaffolding preparing the<br />
surfaces (including primer coat) etc. complete.<br />
19 Item <strong>No</strong>. 19:- Providing and applying waterproof cement paint<br />
of approved colour and shade to existing surface in two coats,<br />
including scaffolding preparing the surface to receive paint<br />
applying putty etc. complete. (including primer coat)<br />
20 Item <strong>No</strong>. 20:- Providing and fixing self imported roofing<br />
systems, made of imported galterinume steel, including cobo<br />
modules 2 get 14 feet sunlight with one furmica 2 inches<br />
indicator to be installed at every 30 feet along with the length<br />
of building and supply of hanger / clamps as per proflex<br />
standard, completing to ASTM A792 standard etc. complete.<br />
Bd-L-7 and IS<br />
1489<br />
use.<br />
369 a) The work should be carried out as per instruction of<br />
Engineer in charge and wording of item. b) The item rates<br />
includes the cost of water proofing compound to be used at<br />
the rate 1 kilograms per bag of cement. c) The sand face<br />
treatment shall be applied in two coats ( base coat of 15<br />
mm thick keeping surface rough and sand face treatment 8<br />
mm thick, total 23mm thick. The grains shall be taken<br />
uniformly. d) The items includes providing 50mm x 12mm<br />
drip moulding in chajjas, canopies, and window top of water<br />
closet etc. without extra cost to government. e) Curing shall<br />
be done by sprinkling water on the surface for a minimum<br />
period of 14 days. Plastered surface shall be immediately<br />
covered after finishing, application of water shall be started<br />
only after final setting time of cement.<br />
Bd-P-5 413 a) The item shall be executed as per wording of item and as<br />
per detailed drawing and design, and as directed by<br />
Engineer-in charge.<br />
Bd.O.8 406 As Directed by Engineer in charge.<br />
- - As Directed by Engineer in charge.<br />
Additional specification as per separate sheet attached.<br />
110<br />
Signature Of Contractor <strong>No</strong>. Of Corrections Executive Engineer<br />
P.W. Division, Jawhar