4 Item <strong>No</strong>. 4:- Providing and laying in situ cement concrete in<br />

proportion M-15 of trap metal for foundation and bedding,<br />

including bailing out water manually, formwork, compacting<br />

and curing etc. complete.<br />

Bd – E-1 287 a) The work shall be executed as per wording of Item and<br />

as directed by Engineer in charge. b) The concrete shall be<br />

as per guidelines of IS 456-200 for moderate atmospheric<br />

conditions. c) the concrete mix shall be got approved from<br />

Engineer in charge prior to Execution d) all the Materials<br />

such as cement, sand, metal and water shall be got tested<br />

and approved from the Engineer in charge as per material<br />

test frequency specified in <strong>Tender</strong>. e) Only plywood and<br />

steel centering shall be used. f) Minimum cement content<br />

5 Item <strong>No</strong>. 5:- Providing and casting in situ cement concrete M-<br />

30 of trap metal for reinforced cement concrete work like raft,<br />

grillage, strip, foundation and footing of reinforced cement<br />

concrete columns and steel stanchions, including bailing out<br />

water manually, centering, formwork, compacting, finishing<br />

and curing. (Excluding steel reinforcement)<br />

6 Item <strong>No</strong>. 6:- Providing and casting in situ cement concrete M-<br />

30 of trap metal for reinforced cement concrete columns as<br />

per detailed designs and drawings or as directed by Engineer<br />

in charge including centering, formwork, compacting<br />

roughening the surface if special finish is to be provided and<br />

curing. (Excluding steel reinforcement)<br />

shall be as per IS 456-2000.<br />

Bd- F-3 298 a) The work shall be executed as per wording of Item and<br />

as directed by Engineer in charge. b) The concrete shall be<br />

as per guidelines of IS 456-200 for moderate atmospheric<br />

conditions. c) the concrete mix shall be got approved from<br />

Engineer in charge prior to Execution d) all the Materials<br />

such as cement, sand, metal and water shall be got tested<br />

and approved from the Engineer in charge as per material<br />

test frequency specified in <strong>Tender</strong>. e) Only plywood and<br />

steel centering shall be used. f) Minimum cement content<br />

shall be as per IS 456-2000.<br />

Bd- F-4 298 a) The work shall be executed as per wording of Item and<br />

as directed by Engineer in charge. b) The concrete shall be<br />

as per guidelines of IS 456-200 for moderate atmospheric<br />

conditions. c) the concrete mix shall be got approved from<br />

Engineer in charge prior to Execution d) all the Materials<br />

such as cement, sand, metal and water shall be got tested<br />

and approved from the Engineer in charge as per material<br />

test frequency specified in <strong>Tender</strong>. e) Only plywood and<br />

steel centering shall be used. f) Minimum cement content<br />

shall be as per IS 456-2000.<br />

107<br />

Signature Of Contractor <strong>No</strong>. Of Corrections Executive Engineer<br />

P.W. Division, Jawhar