4 Item <strong>No</strong>. 4:- Providing and laying in situ cement concrete in<br />
proportion M-15 of trap metal for foundation and bedding,<br />
including bailing out water manually, formwork, compacting<br />
and curing etc. complete.<br />
Bd – E-1 287 a) The work shall be executed as per wording of Item and<br />
as directed by Engineer in charge. b) The concrete shall be<br />
as per guidelines of IS 456-200 for moderate atmospheric<br />
conditions. c) the concrete mix shall be got approved from<br />
Engineer in charge prior to Execution d) all the Materials<br />
such as cement, sand, metal and water shall be got tested<br />
and approved from the Engineer in charge as per material<br />
test frequency specified in <strong>Tender</strong>. e) Only plywood and<br />
steel centering shall be used. f) Minimum cement content<br />
5 Item <strong>No</strong>. 5:- Providing and casting in situ cement concrete M-<br />
30 of trap metal for reinforced cement concrete work like raft,<br />
grillage, strip, foundation and footing of reinforced cement<br />
concrete columns and steel stanchions, including bailing out<br />
water manually, centering, formwork, compacting, finishing<br />
and curing. (Excluding steel reinforcement)<br />
6 Item <strong>No</strong>. 6:- Providing and casting in situ cement concrete M-<br />
30 of trap metal for reinforced cement concrete columns as<br />
per detailed designs and drawings or as directed by Engineer<br />
in charge including centering, formwork, compacting<br />
roughening the surface if special finish is to be provided and<br />
curing. (Excluding steel reinforcement)<br />
shall be as per IS 456-2000.<br />
Bd- F-3 298 a) The work shall be executed as per wording of Item and<br />
as directed by Engineer in charge. b) The concrete shall be<br />
as per guidelines of IS 456-200 for moderate atmospheric<br />
conditions. c) the concrete mix shall be got approved from<br />
Engineer in charge prior to Execution d) all the Materials<br />
such as cement, sand, metal and water shall be got tested<br />
and approved from the Engineer in charge as per material<br />
test frequency specified in <strong>Tender</strong>. e) Only plywood and<br />
steel centering shall be used. f) Minimum cement content<br />
shall be as per IS 456-2000.<br />
Bd- F-4 298 a) The work shall be executed as per wording of Item and<br />
as directed by Engineer in charge. b) The concrete shall be<br />
as per guidelines of IS 456-200 for moderate atmospheric<br />
conditions. c) the concrete mix shall be got approved from<br />
Engineer in charge prior to Execution d) all the Materials<br />
such as cement, sand, metal and water shall be got tested<br />
and approved from the Engineer in charge as per material<br />
test frequency specified in <strong>Tender</strong>. e) Only plywood and<br />
steel centering shall be used. f) Minimum cement content<br />
shall be as per IS 456-2000.<br />
107<br />
Signature Of Contractor <strong>No</strong>. Of Corrections Executive Engineer<br />
P.W. Division, Jawhar