63 Dy. Executive Engineer<br />
8.3 EXPLOSIVE :<br />
The Contractor shall at his own expense construct and maintain proper magazines, if such<br />
are required for the storage of explosives for use in connection with the work and such<br />
magazines, being situated constructed and maintained in accordance with the Government<br />
Rules applicable in that behalf. The Contractor shall at his own expenses obtain such license<br />
or licenses as may be necessary for storing and using explosives. <strong>No</strong>twithstanding that the<br />
location etc. or storage of explosives are approved by the Engineer, the Government, shall<br />
not bear any responsibility whatsoever in connection with the storage and use of explosives<br />
on the site or any accident or occurrence what -so-ever in connection, therewith, all<br />
operations of the Contractor in or for which explosives employed being at the risk of<br />
contractor and upon his sole responsibility and the Contractor hereby gives to Government an<br />
absolute indemnity in respect thereof.<br />
8.4 DAMAGE BY FLOODS OR ACCIDENTS :-<br />
The contractor shall take all precautions against damage by floods or from accident etc. <strong>No</strong><br />
compensation will be allowed to the Contractor on this account or for correcting and repairing<br />
any such damage to the work during construction The Contractor shall be liable to make good<br />
at his cost any plant or materials belonging to the Government lost or damaged by floods or<br />
from any other cause while is in his charge.<br />
8.5 RELATION WITH PUBLIC AUTHORITIES:<br />
The Contractor shall comply with all rules, regulations, bye-laws and directions given from<br />
time to time by any local or public authority in connection with this work and shall himself pay<br />
all charges which are leviable on him without any extra cost to the Government.<br />
POLICE PROTECTION:<br />
For the Special Protection of camp of the Contractor's works, the Department will help the<br />
Contractor as far as possible to arrange for such protection with the concerned authorities, if<br />
so required by the contractor in writing. The full cost of such protection shall be borne by the<br />
Contractor .<br />
8.6 INDEMNITY:<br />
The Contractor shall indemnify the Government against all actions, suits, claims and<br />
demands brought or made against it in respect of anything done of committed to be done by<br />
the contractor in execution of or in connection with the work of this contract and against any<br />
loss or damage to the Government in consequence to any action or suit being brought against<br />
the Contractor for anything done or committed to be done during the execution of this<br />
contract.<br />
The Government may at its discretion and entirely at the cost of the contractor defend such<br />
suit, either jointly with the Contractor or single in case the latter chooses not to defend the<br />
case.<br />
8.7 MEDICAL AND SANITARY ARRANGEMENTS TO BE PROVIDED FOR<br />
LABOUR EMPLOYED IN THE CONSTRUCTION BY THE CONTRACTOR<br />
a) The Contractor shall provide an adequate supply of pure and wholesome water for the use of<br />
labourers on work and in camps.<br />
b) The Contractor shall construct trench or semi permanent latrines for the use of the Labours.<br />
Separate latrines shall be provided for men and women.<br />
c) The Contractor shall build sufficient number of huts on a suitable plot of land for use of the<br />
labourers according to the following specifications:<br />
1. Huts with Bamboo’s and Grass may be constructed.<br />
2. A good site not liable to submergence shall be selected on high ground remote from jungle<br />
but well provided with tress, shall be chosen wherever it is available. The neighborhood of<br />
tank, jungle, trees or wood should be particularly avoided, Camps should not be established<br />
close to large cutting of earth work.<br />
3. The lines of huts shall have open space of at least ten metres between rows. When a good<br />
natural site cannot be procured, particular attention should be given to the drainage.<br />
Signature of Contractor <strong>No</strong>. Of Corrections Executive Engineer